--- name: icse-workflow description: Use when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection. --- # ICSE Workflow An ICSE campaign is a ten-month pipeline with one entrance. The 2027 cycle (checked 2026-07-08 against the official dates pages) runs a **single submission cycle** — a change from the two-cycle 2025/2026 model — so a missed June deadline costs a full year, and the calendar below is the whole game. ## The 2027-cycle master calendar | Date (all AoE where applicable) | Milestone | Your workstream | |---|---|---| | Jun 23, 2026 | Abstract (mandatory) | Real title + abstract frozen | | Jun 30, 2026 | Full paper deadline | 10+2 IEEE PDF, artifact link live | | Jul–Aug 2026 | Reviews written | Prepare response infrastructure; rest | | Sep 2026 | Author response window | Criterion-mapped replies (`icse-author-response`) | | Oct 20, 2026 | Decisions: Accept / Major Revision / Reject | Branch: celebrate / sprint / reroute | | Nov 17, 2026 | Major Revision due | Four-week revision sprint | | Dec 18, 2026 | Final MR decisions | Terminal for the cycle | | Early 2027 (待核实) | Artifact evaluation window | Badge submission (`icse-artifact-evaluation`) | | 待核实 | Camera-ready due | +1 page allowance, IEEE production | | Apr 25 – May 1, 2027 | ICSE in Dublin (core Apr 28–30) | Talk, artifact, networking plan | Artifact-evaluation and camera-ready dates for 2027 were not posted at check time; the 2026 edition ran artifact registration/submission in early January, which is the planning anchor until real dates appear. ## Working backward from June 30 A credible empirical-SE paper cannot be compressed into deadline month, because its long poles — subject recruitment, benchmark construction, multi-week tool runs, qualitative coding with a second rater — do not parallelize late. Plan backward: ```text Jun 30 freeze: PDF + anonymized replication package Jun 16 full internal mock review against the four criteria Jun 02 results complete; threats-to-validity written from real limitations May 05 evaluation running at scale; paper skeleton has real numbers Apr 07 study design locked (RQs, baselines, metrics, subjects); pilot done Mar 2026 and earlier: idea vetted with icse-topic-selection; related work swept ``` The two dates authors most often plan around wrongly: the **abstract deadline is mandatory** (June 23 — a week before the paper, not a formality), and the **response window is September**, which lands in teaching-start season for most groups — reserve the days now. ## Role assignments that prevent deadline-week chaos - **Evidence owner** — benchmarks, baselines, statistics; owns Jun 2 freeze. - **Artifact owner** — replication package, anonymization, availability statement; owns the link that goes in the paper. - **Prose owner** — the 10-page budget, the threats section, the criterion self-audit. - **Process owner** — HotCRP fields, conflicts, abstract registration, calendar of every date above in the group calendar with AoE conversions. One person can hold two hats; no hat may be unheld. ## Branch plans after October 20 - **Accept:** artifact-evaluation submission (badges are opt-in and post-acceptance), camera-ready with the extra page, Dublin logistics. - **Major Revision:** the November sprint is pre-planned *before* October — which experiments could be extended, which machines are free in November. Groups that first think about feasibility on notification day lose a week of the four. - **Reject:** reroute within weeks, not months. FSE and ASE deadlines typically land in spring/summer, ISSTA in autumn/winter; TSE/TOSEM/EMSE take extended versions year-round, and a journal acceptance can return to the ICSE stage via journal-first (2027 window: papers accepted Oct 11, 2025 – Oct 10, 2026 at TSE/TOSEM/EMSE). Check each venue's live dates — sibling calendars move annually. ## Cadence between milestones The calendar above names endpoints; groups that hit them run a steady between-milestone cadence: a weekly claims-vs-evidence review from April (which headline claim is still unevidenced, who unblocks it), a biweekly package build so the artifact never diverges more than two weeks from the paper, and a standing "deadline minus 14" rehearsal where the current draft is mock-reviewed against the four criteria by someone outside the author list. The mock review is the cheapest Major-Revision insurance available: it finds the missing-baseline and boilerplate-threats objections while there is still a month to fix them rather than four weeks in November. ## Cycle-volatility warnings - The single-cycle structure itself is the newest variable: 2025/2026 ran two cycles, 2027 runs one. Verify the cycle count *first* each year, because it changes every downstream date and the rerouting math. - Response format, artifact deadlines, camera-ready dates, and registration rules were all unposted for 2027 at check time — 待核实 before promising them to coauthors. - Do not let old two-cycle advice ("resubmit to cycle 2") leak into planning; that lane does not exist in 2027. ## Output format ```text [Cycle position] months to next ICSE deadline; feasible? yes/no [Backward plan] dated milestones from today to freeze [Owners] evidence / artifact / prose / process [Branch readiness] MR sprint pre-plan? reroute venue + date named? [Calendar risks] deadlines colliding with teaching/travel; AoE conversions done ```