--- name: imc-review-process description: Use when reasoning about how an ACM IMC submission is evaluated, covering double-blind multi-round review, the Accept / One-Shot-Revision / Reject decision categories, the reviewer-champion rule and bounded action points, early rejection of consensus-reject papers, shepherding for artifact availability, and how IMC's two-deadline model differs from SIGCOMM/NSDI cycles. --- # IMC Review Process Model the pipeline before interpreting any single review. IMC's process is built around **two deadlines a year** and a distinctive middle outcome — **One-Shot-Revision** — that is neither a plain reject nor an open-ended major revision. The most consequential mental shift for authors arriving from a single-round conference is that a good-but-incomplete measurement paper has a *bounded* path to acceptance across deadlines. ## Process model - Submission and review run on **HotCRP** with **double-blind** anonymity maintained through reviewing. - Review proceeds in **several rounds**. Papers with a **consensus for rejection are notified early**, so authors can move the work to another venue without waiting for the full cycle. - First decisions fall into **Accept**, **One-Shot-Revision**, or **Reject**. Reviewers weigh the significance of the measurement finding, the credibility of vantage points and ground truth, the soundness of methodology, honesty about limitations and confounds, the **Ethics** treatment, and artifact availability. - Accepted papers may be **shepherded** by PC members — notably to ensure the **artifacts promised in the availability declaration are actually made available**. ## The One-Shot-Revision, precisely | Element | What the call specifies | |---|---| | Trigger | At least **one reviewer champion** advocating the work's relevance and timeliness | | Scope | Up to **3 additions/changes** — a bounded, concrete action list, not "revise broadly" | | Resubmission | To the **next deadline** in the two-deadline cycle | | Re-review | By the **same reviewers**, against the action points | The strategic reading: a One-Shot-Revision is a **contract**. It is granted because someone believes in the paper, and it is judged narrowly on whether the named action points were done. Treat it as a near-accept with obligations, not a coin flip (see `imc-author-response`). ## Reading a decision against the categories | Decision | What it means | Author move | |---|---|---| | Accept | Finding and method hold; shepherding for availability | Deliver the promised artifact; do not reopen scope | | One-Shot-Revision | A champion exists; a bounded set of gaps (a missing vantage point, a confound to address, an ethics clarification) | Execute exactly the named action points; resubmit next deadline to the same reviewers | | Reject | Structural: unrepresentative vantage points, no ground truth, thin measurement, ethics failure | Reframe or reroute (SIGCOMM/NSDI/CoNEXT/PAM or a journal); do not lightly resubmit unchanged | Design the submission so its weakest point is **an addressable action item** (an extra vantage point, a longitudinal slice, a bounded confound) rather than a structural flaw (a study design you cannot redo before the next deadline). ## How IMC differs from its siblings - **vs. SIGCOMM / NSDI:** those reward systems and protocol design with a supporting evaluation; IMC rewards the measurement itself and enforces the Ethics gate and availability declaration harder. Never assume a shared calendar or template. - **vs. a single-deadline conference:** IMC's two deadlines plus One-Shot-Revision give a *within- year* second chance with continuity of reviewers — closer to a lightweight revise-and-resubmit than to "reject and try next year." - **vs. a journal:** the revision is **one shot and bounded** (up to a few action points), not an open iterative loop. ## Who reads you Expect measurement experts who will interrogate **vantage-point representativeness**, whether ground truth is real, whether the finding is a snapshot artifact of a moving Internet, and whether the active measurement was safe and ethical. Because IMC spans scanning, DNS, routing, web, security, and social measurement, papers are matched to subarea reviewers — a vague methodology gets caught, not skimmed. ## Where author leverage actually exists ```text [Before submission] topic tags + vantage-point framing -> reviewer pool (largest lever) [Initial reviews] factual corrections, clarifying vantage-point coverage, ethics clarifications [One-Shot-Revision] the strongest lever: execute the bounded action points exactly, for the same reviewers, and show each one done [Shepherding] deliver the promised artifact; this is about availability, not new science [After reject] no appeal; reroute to a sibling venue or a journal ``` ## Misreadings to avoid - **Treating One-Shot-Revision as a full rewrite window** — you get a bounded action list and the same reviewers; scope creep signals you missed the point. - **Treating One-Shot-Revision as guaranteed** — the second read against the action points is real. - **Ignoring the early-reject signal** — a consensus-reject notice is a routing prompt, not an invitation to argue. - **Underestimating shepherding** — a promised dataset that never materializes is a real problem. - **Projecting last year's cadence** — deadline dates and revision mechanics are per-edition. ## Output format ```text [Process stage] pre-submission / awaiting reviews / one-shot-revision / shepherding / accepted [Decision category] accept / one-shot-revision / reject, with the criterion driving it [Champion?] is there a reviewer advocate? which review reads closest? [Action points] [Leverage plan] the next-stage action that can actually change the outcome [Forbidden moves] identity leak / scope creep beyond the action points / undelivered artifact ```