--- name: imc-workflow description: Use when planning an ACM IMC campaign end to end, covering the choice between the two annual deadlines, backward planning from the target cutoff, the registration step, the One-Shot-Revision path across deadlines, availability shepherding, the camera-ready and dataset release, and the Replicability Track calendar. --- # IMC Workflow Use this to plan an IMC campaign against the calendar. IMC runs **two submission deadlines a year** with a shared review pipeline and a **One-Shot-Revision** path that resubmits to the next deadline. Planning backward from the right deadline — and reserving time for ethics approvals and dataset release that cannot be rushed — is the difference between a smooth cycle and a missed one. ## Choose the deadline first IMC 2026 offered two cycles: cycle 1 submission ~20 Nov 2025, cycle 2 submission ~29 Apr 2026 (confirm current dates on the Important Dates page). Choose by data-collection readiness, not optimism: - If measurement and ethics approvals will be solid by the earlier cutoff, target cycle 1 — and a One-Shot-Revision still lands you in cycle 2. - If data collection or IRB is unfinished, target cycle 2 rather than submitting thin work that earns a reject instead of a revision. ## Backward plan from the target cutoff ```text [T-0] Submission deadline (AoE). PDF + BBL uploaded; availability declaration set. [T-1wk] Registration cutoff (title/abstract/authors/conflicts) — precedes submission by ~a week. [T-2wk] Final anonymity sweep (incl. vantage points); Ethics section finalized; artifact anonymized. [T-4wk] Freeze the measurement narrative; draft complete; limitations argued per-result. [T-8wk] Finish the decision-critical measurements; validate ground-truth subsamples. [T-earlier] Obtain IRB determination; run active measurements safely; pin provenance as you collect. ``` Ethics approvals and longitudinal windows are the long poles — they cannot be compressed in the final weeks. ## The review-to-decision arc ```text [Submit] -> multi-round double-blind review [Early reject] consensus-reject papers notified early -> reroute promptly (imc-topic-selection) [Decision] Accept / One-Shot-Revision / Reject Accept -> shepherding + camera-ready One-Shot-Revision -> execute the bounded action points; resubmit NEXT deadline, same reviewers Reject -> reroute to SIGCOMM/NSDI/CoNEXT/PAM or a journal ``` ## The One-Shot-Revision leg If you receive a One-Shot-Revision (`imc-review-process`, `imc-author-response`): - You have until the **next deadline** to execute a **bounded** action list (up to a few concrete additions/changes) for the **same reviewers**. - Plan the additional measurements immediately — a new vantage point or a longitudinal extension takes real calendar time. - Do exactly the named action points; resist scope creep that could cost the champion's support. ## After acceptance ```text [Shepherding] deliver the artifact you declared; the shepherd checks availability [Camera-ready] de-anonymize; finalize Ethics + availability statements; permanentize dataset/code links to a DOI archive (cycle 1 camera-ready ~mid-April; cycle 2 ~1 Sep — confirm) [Award] for the Community Contribution Award, the dataset/tool must be public + usable by the camera-ready deadline [Present] at least one author presents at IMC (Karlsruhe, Oct 12-16, 2026) ``` ## The Replicability Track calendar (if applicable) If the contribution is replicating a prior measurement study, the path differs: submit an **Expression of Interest** by its (earlier) deadline (IMC 2026 EoI ~29 Jan 2026), a small committee screens it, and strong abstracts are invited to a full submission judged like the main track. Plan the EoI well before you complete the replication. ## Calibration - Every date is a per-edition snapshot — confirm both cycles' deadlines, the registration gap, and the camera-ready dates on the current Important Dates page before committing. - Do not assume the One-Shot-Revision mechanics, the number of action points, or the Replicability Track dates carry over between editions. ## Output format ```text [Target] cycle 1 / cycle 2, with the reason (data + ethics readiness) [Backward plan] registration -> submission> [Long poles] [Post-decision path] accept / one-shot-revision (next deadline) / reroute [Release plan] shepherding + DOI archive by camera-ready; award eligibility ```