--- name: ipsn-workflow description: Use when planning an IPSN-lineage project timeline from track/venue selection through the CPS-IoT Week deadline, double-blind submission, deployment and hardware logistics, rebuttal, the Best Research Artifact Award, and the dual ACM/IEEE camera-ready — with honest handling of the fact that IPSN merged into SenSys. --- # IPSN Workflow Use this as the project-management skill for an IPSN-lineage submission. Replace every date with the current official timetable and work backwards from the successor (SenSys) deadline at **CPS-IoT Week**. The single biggest planning fact: **IPSN no longer runs standalone** — it merged into **SenSys (Embedded AI and Sensing Systems)**, so plan against the current SenSys call, keeping the IP-vs-SPOTS instinct. IPSN had **no standing editor-in-chief** and **no APC**; rotating leadership was the per-edition General Chair(s) and per-track (IP / SPOTS) Program Chairs under CPS-IoT Week, ACM SIGBED, and IEEE. The cost model is registration; at least one author presents. Re-check the successor's organizing-committee page rather than carrying a name forward. ## Milestones - **Venue + track fit:** confirm the IPSN lineage over MobiSys/MobiCom/INFOCOM/RTAS, and pick IP vs SPOTS (`ipsn-topic-selection`). - **Evidence lock:** freeze the testbed, ground-truth reference, baselines, energy/latency measurement setup, and the dataset/firmware artifact contents. - **Deployment window (if applicable):** schedule field time early — a bridge, building, or wildlife deployment cannot be redone in the final week and is weather/permit-bound. - **Registration/abstract:** submit real title, abstract, authors, track, and conflicts by the earlier cutoff. - **Submission:** upload the anonymized PDF and dataset/firmware link on HotCRP. - **Rebuttal (if offered):** correct misreadings and supply any measured number a reviewer flagged. - **Decision:** archive reviews, rebuttal, and every submitted version. - **Acceptance:** prepare the **dual ACM/IEEE** camera-ready, pursue the **Best Research Artifact Award** and ACM badges, register, and present. ## Backward plan from the submission deadline | Weeks out (heuristic) | Sensor-systems milestone | |---|---| | 12+ | Track chosen; testbed and ground-truth reference decided; deployment permits/weather scheduled | | 10 | Hardware/firmware frozen; power-measurement harness built and validated | | 8 | Data collection / deployment complete; raw traces, energy logs, and calibration archived | | 6 | Analysis done; accuracy/energy/latency budgets computed; baselines run under equal conditions | | 4 | Full draft on the ACM template (two-column, ≤12 pp); artifact assembled and anonymized | | 3 | Internal mock review by a sensor-systems reader; check the IP/SPOTS framing holds | | 2 | Limits hardened, related-work delta sharpened, page budget met | | 1 | Double-blind sweep on PDF, board photos, scope screenshots, testbed names, dataset links | | 0 | Register/track-select by the earlier cutoff, then paper + artifact link on HotCRP | These offsets are planning heuristics only — anchor every one to the current CPS-IoT Week / successor Important Dates page. ## The merger and calendar reality - IPSN's last standalone edition was **IPSN 2024** (Hong Kong). The live target is the next **SenSys** edition at CPS-IoT Week; SenSys 2026 (Saint Malo) had a **13 Nov 2025** paper deadline, so the next edition's deadline is **待核实** — confirm before planning. - **Deployment lead time is the hidden critical path.** Unlike a software paper, a sensing paper's schedule is bounded by physical access (a bridge closure window, a field season, a hardware fabrication run). Missing the deadline often costs a full year *and* a deployment window. ## Failure modes by stage - **Testbed still moving at week 4** forces last-minute measurement nobody has audited — the classic evidence-realism reject. - **Leaving anonymization to the final week** is how a lab-logo board photo or a named testbed leaks identity under double-blind review. - **Skipping the mock review** forfeits the one chance to hear "your baseline is simulated" or "you never report energy" from a friend instead of a reviewer. - **Treating the rebuttal as decisive** — it is narrow; the measured evidence in the paper carries the argument. - **Assuming IPSN still runs** — check the successor venue before anything else. ## Coordination notes - Assign one owner for the **artifact/dataset/firmware release** and another for the **double-blind sweep** (including hardware imagery); shared ownership is how both slip. - Archive the exact submitted PDF, artifact, raw traces, and calibration — the rebuttal and camera-ready must quote them precisely, and the artifact award needs them. ## Output format ```text [Current stage] idea / evidence / deployment / writing / submitted / rebuttal / accepted [Venue + track] successor (SenSys) edition + IP/SPOTS, with the next deadline (or 待核实) [Critical path] [Risk register] [Owner map] person or role> ```