--- name: iros-workflow description: Use when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar. --- # IROS Workflow Use this as the project-management skill for an IROS submission. Replace every date with the current official timetable and work backward from PaperPlaza cutoffs. IROS is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. It is **co-sponsored by IEEE RAS and the Robotics Society of Japan (RSJ)** — hence "IEEE/RSJ" — and the organizing committee rotates yearly between regions, so re-check the current CFP and committee page rather than carrying names or rules forward. The cost model is registration plus any per-page charge, and proceedings go to IEEE Xplore. ## The fall-venue rhythm (2026 shape) IROS is the **fall** IEEE-RAS mega-venue, the seasonal counterpart to ICRA's spring cycle. The 2026 edition ran a spring submission into an autumn conference: - Paper deadline in **early spring** (2026: March 2). - Video attachment a few days later (2026: March 5) — a distinct cutoff, not tied to the paper. - A long **summer review silence**, then notification in **mid-June** (2026: June 16). - **Camera-ready in July** (2026: July 10), then the conference in **late September/October** (2026: Sept 27 - Oct 1, Pittsburgh). Knowing you are on the fall calendar changes routing: a project that misses IROS's spring deadline has CoRL and the next ICRA as nearer alternatives than waiting a full IROS year. ## Milestones - Venue fit: confirm the contribution is an integrated intelligent system with credible robot evidence. - Evidence lock: freeze the platform, task distribution, trial protocol, baselines, and the video plan. - Paper deadline: upload the anonymous PDF (references counted in the page budget) and PaperPlaza fields. - Video deadline: upload the ≤ 60 s / ≤ 10 MB attachment by its own cutoff. - Review silence: nothing to do but keep the robot and logs intact for camera-ready. - Notification: triage reviews; there is traditionally no rebuttal, so plan camera-ready edits instead. - Camera-ready: de-anonymize, integrate meta-review asks, file the IEEE copyright form, register. - Presentation: at least one author presents in person; prepare the talk and any live/updated video. ## Backward plan from the paper deadline | Weeks out (heuristic) | Real-robot systems milestone | |---|---| | 10+ | Platform frozen; task distribution and success criterion defined | | 8 | Baselines implemented on the same hardware for a fair comparison | | 6 | Main trials run, resets logged, failures categorized | | 4 | Sim-to-real study complete; the gap is a number, not a hope | | 3 | Full draft in IEEE two-column format; references budgeted as content | | 2 | Video footage banked from real sessions; rough 60 s cut assembled | | 1 | Anonymity sweep across PDF, figures, and video; PaperPlaza PINs collected | | 0 | Paper uploaded; video by its separate cutoff | These offsets are planning heuristics only — anchor each to the current official timetable, never to a previous cycle's calendar. ## Failure modes by stage - Filming on deadline week produces worse footage and worse anonymity than banking clips all along. - Treating references as free space overruns the budget, because IROS counts them in. - Assuming a rebuttal exists wastes the notification window; IROS traditionally ships reviews with the decision, so the only lever is camera-ready. - Letting the robot get reconfigured before camera-ready makes a requested extra trial impossible. ## Coordination notes - Assign one named owner for the video and one for the anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF and video, since the camera-ready must trace to the reviewed version. ## Output format ```text [Current stage] idea / experiments / writing / submission / video / review / notified / camera-ready [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```