--- name: mobisys-workflow description: Use when planning a MobiSys project timeline backward from the single early-December paper deadline through registration, two-round review with an early-reject cut, the rebuttal, notification, artifact evaluation, camera-ready, and the June conference — with device-experiment lead time built in and the one-deadline-per-year risk made explicit. --- # MobiSys Workflow Use this as the project-management skill for a MobiSys submission. Replace every date with the current official timetable and work backward from the one hard December cutoff on the `mobisys.hotcrp.com/deadlines` page. MobiSys is a conference, not a journal: no standing editor-in-chief, no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Chairs (2026 General Chairs: Fahim Kawsar and Cecilia Mascolo; Program Chairs 待核实). Committees rotate yearly — re-check the current organizing-committee page rather than carrying a name forward. ## The one-deadline calendar Unlike MobiCom and NSDI, which run two deadlines a year, **MobiSys runs a single paper deadline in early December feeding the following June conference**. There is no second gate this cycle to catch a slip. That single fact governs the whole plan: the device experiments must be finished, not started, before December. ## Milestones - Venue fit: confirm the contribution is a mobile/embedded *system* whose device behavior is the result (`mobisys-topic-selection`). - Evidence lock: freeze the system design and finish the on-device measurement campaign — energy, latency, memory, thermal, and any deployment/user study. - Paper registration: register title, abstract, authors, and conflicts on HotCRP before the registration cutoff that precedes the paper upload. - Paper deadline: upload the anonymous 12-page double-column PDF and required HotCRP fields. - Round-1 outcome: early-reject notifications go out; survivors proceed to round 2. - Round-2 reviews + rebuttal: read reviews, then draft a scope-limited rebuttal (`mobisys-author-response`). - Notification: archive reviews, rebuttal, and decision. - Acceptance: prepare the ACM camera-ready, artifact-evaluation submission, registration, and the June in-person talk and demo. ## Backward plan from the December deadline | Weeks out (heuristic) | Mobile-systems milestone | |---|---| | 12+ | System built; measurement harness and power instrument working end to end | | 8 | On-device runs complete on all target devices; energy/latency logged with provenance | | 6 | Deployment or user study done if the claim is a service | | 4 | Full draft sitting in the 12-page ACM double-column template | | 3 | Internal mock review by a systems reader; break-condition experiment added | | 2 | Anonymity sweep including device/trace giveaways; artifact package smoke-tested | | 1 | Numbers regenerated from logs so PDF and artifact cannot diverge | | 0 | Registration then paper on HotCRP before the UTC cutoff | These offsets are planning heuristics only — anchor each to the current official timetable, never to a previous cycle's calendar. ## Failure modes by stage - Starting device measurement in November forces single-device, single-run results that read as under-evaluated — the classic MobiSys evidence reject. - Leaving format conversion to the final week surfaces overflow late; the 12-page double-column budget is tighter than a working draft once figures are placed. - Skipping the mock review forfeits the only chance to hear "your energy boundary is undefined" from a colleague instead of a reviewer. - Building the artifact after the paper deadline forfeits the ACM badges, which need a working script-first package the AEC can run on its own machines (`mobisys-artifact-evaluation`). ## Coordination notes - Assign one named owner for the on-device measurement provenance and another for the anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF, supplement, and artifact commit, since rebuttal replies must quote them precisely and camera-ready must match the reviewed version. - Because a miss costs a full year, decide the go/no-go on evidence completeness by the four-week mark, not on deadline night. ## Output format ```text [Current stage] idea / building / measuring / writing / registration / submitted / rebuttal / accepted [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```