--- name: ndss-workflow description: Use when planning an NDSS submission calendar — choosing between the summer and fall cycles, backward-planning from the AoE deadline through early-reject, rebuttal, notification, camera-ready, and the Seoul symposium, and placing NDSS honestly inside the security big-four retargeting year. --- # NDSS Workflow One symposium, two entrances. NDSS 2027 accepts papers through a summer cycle and a fall cycle, each a complete two-round review pipeline, both feeding the same week in Seoul (22-26 March 2027). Plan against the cycle you can actually win, not the one that arrives first. ## The 2027 skeleton (verified 2026-07-08; always recheck the live CFP) | Milestone | Summer cycle | Fall cycle | | --- | --- | --- | | Paper deadline (AoE / UTC-12) | May 6, 2026 — passed | **August 19, 2026** | | Early-reject notification + Round-1 reviews | June 12, 2026 | September 25, 2026 | | Rebuttal + interactive discussion | June 24-28, 2026 | October 8-10, 2026 | | Final notification | July 22, 2026 | November 4, 2026 | | Camera-ready (both cycles) | January 6, 2027 | January 6, 2027 | | Symposium (Seoul) | March 22-26, 2027 | March 22-26, 2027 | As of 2026-07-08 the summer cycle is between rebuttal and notification; the fall deadline is roughly six weeks out. Registration for Seoul opens in October 2026 (Internet Society announcement) — for many teams the 2027 edition also means visas and long-haul travel budgets that San Diego never required. Start that paperwork at acceptance, not at camera-ready. ## Backward plan from a fall submission ```text Aug 19 paper deadline (AoE) ── freeze everything Aug 12 full-draft freeze ── format, anonymity, ethics-section passes only Aug 05 internal red-team read ── someone plays the Round-1 reviewer Jul 29 evaluation freeze ── last new experiment; start writing results Jul 15 disclosure clock check ── vendor notifications sent early enough that "we disclosed" is true at submission time Jul 08 (today) go/no-go ── fit test done, adversary model written, headline experiment already running ``` The item teams misplace is the **disclosure clock**: responsible disclosure has latency measured in weeks, and the CFP expects reporting (or a concrete plan) for high-impact vulnerabilities. A finding made on August 10 forces an uncomfortable choice; a finding made in July does not. ## Choosing the cycle - Enter the **earliest cycle whose backward plan closes** with the evaluation *done*, not projected. A thin submission is worse than a late one here, because a rejection blocks major-overlap resubmission in the other 2027 cycle. - The rebuttal window is short and fixed (Oct 8-10 for fall). Check coauthor availability during those exact days before committing. - A **Major Revision** outcome converts the calendar: you get reviewer-specified revision tasks and a resubmission window (dates 待核实 — confirm on notification). Budget the post-notification month as working time, not celebration time. ## The big-four year, seen from the NDSS seat The four flagship deadlines interleave, and NDSS's late-summer fall deadline sits where papers rejected from the S&P and CCS spring/summer cycles and the USENIX Security year naturally land. Two honest rules for riding this calendar: 1. **Retargeting without revision is re-rejection.** Reviewer pools overlap heavily across the big four; a resubmission that ignores its previous reviews often meets the same people. Fold in the fixes, and re-frame for NDSS's networked-adversary lens rather than doing a logo swap. 2. **NDSS is a venue, not a fallback tier.** Its acceptance bar is a peer of the other three; a paper that was thin at S&P is thin here too. What legitimately changes is *fit* — protocol, web, DNS, and distributed-infrastructure work often reads better to an NDSS PC than it did wherever it bounced. ## Running the year - Track each paper as a state machine: `drafting → submitted → round-2 | early-reject → rebuttal → accept | minor-rev | major-rev | reject`, with an owner and a next-action per state. The review-process skill details what each state means. - On **early reject** (with Round-1 reviews in hand): route to the next venue on the routing table in `ndss-topic-selection`, after folding in the reviews. The same-edition door is closed; the 2028 door is not. - On **accept / minor revision**: fork immediately into camera-ready (January 6 is far but the artifact-evaluation opt-in is near — see `ndss-artifact-evaluation`) and logistics (registration, visas, who presents). - Keep the per-author six-submission cap visible on the group's board each cycle; it binds collaborations with many shared authors sooner than people expect. ## Output format ```text [Cycle chosen] summer / fall / next edition — one-line justification [Backward plan] table of dated freezes ending at the AoE deadline [Disclosure clock] green / yellow / red + earliest safe submission date [Rebuttal window] coauthors confirmed available? yes/no [Post-decision branches] accept / minor / major / reject → owner + next action each [Logistics] Seoul registration, visa lead time, presenter ```