--- name: percom-workflow description: Use when planning an IEEE PerCom project timeline from venue fit through paper registration, the September submission, the early-rejection gate, the bounded rebuttal, the IEEE Xplore camera-ready, and in-person presentation, with backward-planning offsets for a human-subjects sensing paper and honest handling of the single-annual-deadline cycle. --- # PerCom Workflow Use this as the project-management skill for a PerCom submission. Replace every date with the current official timetable and work backwards from the HotCRP **registration** cutoff — which precedes the paper deadline by about a week. PerCom runs a **single annual deadline** feeding one review round with a **bounded rebuttal** and an **early-rejection gate**; there is no journal-style revision, so plan for the paper to be complete at submission. PerCom is an IEEE Computer Society conference: it has **no standing editor-in-chief** and **no APC** in the open-access sense. Rotating leadership is the per-edition General and TPC (Program) Co-Chairs (PerCom 2027 full roster **待核实** as of 2026-07-09), and the cost model is IEEE registration with at least one author presenting **in person**. ## Milestones - **Venue fit:** confirm PerCom over ACM UbiComp/IMWUT, MobiCom, SenSys, or IPSN, and confirm the paper is ready this cycle (`percom-topic-selection`). - **Data collection lock:** IRB/consent secured, subjects recruited, sensing protocol frozen — the long pole for a human-subjects paper. - **Evidence lock:** freeze claims, cross-subject splits, baselines, metrics, limitations, and the dataset contents. Nothing can be added in the rebuttal. - **Registration:** submit real title, abstract, authors, topics by the earlier registration deadline (PerCom 2027: 4 Sep 2026). - **Submission:** upload the anonymized PDF and the open-data plan (PerCom 2027: 11 Sep 2026 AoE). - **Early-rejection gate:** notification (~20 Nov 2026) either early-rejects or invites a rebuttal. - **Rebuttal (if invited):** answer explicit reviewer questions from existing evidence, anonymously (~26 Nov 2026). - **Decision:** accept/reject (~18 Dec 2026); archive reviews, rebuttal, and every submitted version. - **Acceptance:** prepare the IEEE Xplore camera-ready (PDF eXpress, eCopyright, ORCID), deposit the de-identified dataset, register, and present in person. ## Backward plan from the submission deadline | Weeks out (heuristic) | Human-subjects sensing milestone | |---|---| | 16+ | IRB/consent approved; recruitment and data collection begun (the long pole) | | 12 | Data collection complete; labeling protocol run with annotator agreement | | 10 | Claims fixed; cross-subject (LOSO) splits and baselines chosen | | 8 | Experiments complete; F1/event-level results with per-subject spread computed | | 6 | Analysis done; limitations drafted alongside results; dataset de-identified | | 4 | Full draft in the IEEEtran 9+1 template; artifact assembled and anonymized | | 3 | Internal mock review by a ubicomp reader ("is this within-subject only?") | | 2 | Limitations hardened, related-work delta sharpened, 9-page budget met | | 1 | Double-blind sweep on PDF and dataset link; open-data plan final | | 0 | Registration by its earlier cutoff, then paper + dataset link on HotCRP | These offsets are planning heuristics only — anchor every one to the current Important Dates page, never to a previous cycle's calendar. Note the **16-week IRB/collection pole**: human-subjects data cannot be rushed in the final month. ## Cycle reality: one shot per year, gated early PerCom runs one annual research deadline. As of 2026-07-09, PerCom 2026 (Pisa) has concluded, so the live next target is **PerCom 2027** (Goa; deadline 11 Sep 2026). Two planning consequences: - **There is no revision cycle.** A paper that is not complete — especially one lacking cross-subject evidence — cannot be rescued in the rebuttal; it will likely be early-rejected. Finish the evaluation before submitting. - **Missing the annual deadline costs roughly a year** at PerCom; ACM **IMWUT** has rolling quarterly deadlines and a revise cycle, so a paper that needs another round of experiments may be better routed there than held for a year — factor that into routing rather than idling. ## Failure modes by stage - **IRB or recruitment slipping** pushes data collection into the final month and forces a within-subject-only evaluation — the classic PerCom early-reject in the making. - **Discovering at week 3 that the split was within-subject** is fatal with no time to recollect; design the LOSO split at week 10. - **Leaving the anonymized dataset to the final week** is how a testbed name, a re-identifying photo, or an owner string leaks identity under double-blind review. - **Skipping the mock review** forfeits the one chance to hear "your evaluation is within-subject" from a friend instead of a reviewer — and there is no revision to fix it. - **Treating the rebuttal as a revision** and planning to "add the experiment then" — the process neither expects nor permits it. ## Coordination notes - Assign one owner for IRB/consent and the dataset, and another for the double-blind anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF, dataset, and (later) rebuttal — the discussion must quote them precisely and stay anonymous. ## Output format ```text [Current stage] idea / IRB+collection / evidence / writing / registration / submitted / rebuttal / accepted [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```