--- name: red-workflow description: Use when mapping the end-to-end lifecycle of a Review of Economic Dynamics (RED) manuscript — from confirming dynamic/quantitative scope, through the current Elsevier Guide's USD 195 fee and ScienceDirect/Editorial Manager submission, the single-anonymized two-reviewer process, the code-first data/code archive plus Option C data statement, to the revise-and-resubmit. Orchestration; it routes to the other red- skills rather than drafting content. --- # RED Manuscript Workflow (red-workflow) ## When to trigger - Starting a paper aimed at the **Review of Economic Dynamics** and wanting the full path - Unsure which RED-specific step comes next or which sibling skill to open - Sanity-checking that nothing RED-specific (fee, code archive, single-anonymized norms) is missed ## The lifecycle (RED-specific) 1. **Scope check** — Is the question dynamic and quantitative, studied through a dynamic model (theoretical, computational, or empirical)? RED's scope is defined by method/lens, not subfield. → `red-topic-selection` 2. **Position** — Place the paper in the dynamic-economics / SED literature. → `red-literature-positioning` 3. **Frame the contribution** — What is the marginal quantitative/dynamic advance? → `red-contribution-framing` 4. **Identification / model logic** — Assumptions and regularity conditions (theory), or causal design (empirical). → `red-identification-strategy` 5. **Analysis** — Calibration, moment-matching, estimation, numerical solution discipline. → `red-data-analysis` 6. **Exhibits** — IRFs, moment tables, model-vs-data figures. → `red-tables-figures` 7. **Write** — RED house style, author-year references, ≤250-word stand-alone abstract, 1–6 keywords. → `red-writing-style` 8. **Stage replication** — Build the data/code archive early; RED's policy is code-first. → `red-replication-and-data-policy` 9. **Understand review** — Desk screen, single-anonymized, ≥2 reviewers when sent out; plan around fast-review norms without assuming a guaranteed decision date. → `red-review-process` 10. **Submit** — Pay the USD 195 fee (USD 100 all-student), submit via ScienceDirect / Editorial Manager. → `red-submission` 11. **Revise** — Response-to-referees after an R&R; resubmissions are fee-exempt. → `red-rebuttal` ## Anti-patterns - Treating RED like a generalist top-5 venue and ignoring its method-defined scope - Forgetting the per-submission fee gates the review (no fee paid → no review) - Leaving the replication archive or Option C data statement to the accepted stage when the policy expects code-first discipline ## Router diagnostics Ask these questions before choosing the next skill: - Is the dynamic mechanism unclear? Use `red-topic-selection` or `red-contribution-framing`. - Is the model disciplined by too few moments or free parameters? Use `red-data-analysis`. - Are assumptions, existence, uniqueness, or accuracy weak? Use `red-identification-strategy`. - Are exhibits static or uninformative about dynamics? Use `red-tables-figures`. - Is the archive missing a run-all path, seeds, or runtime? Use `red-replication-and-data-policy`. The right RED route is usually the step that makes the dynamic model more auditable. ## Stage-gate tracker Keep one block per project and tick gates as they clear: ```text RED PIPELINE — [paper short title] G1 scope: dynamic mechanism named; model class chosen [date/✓] G2 positioning: lineage map written; closest model identified [ ] G3 discipline: calibration table complete; every target sourced [ ] G4 computation: solver chosen; accuracy check passing [ ] G5 exhibits: mechanism figure + fit table drafted [ ] G6 archive: run-all reproduces exhibits; readme.txt drafted [ ] G7 manuscript: abstract ≤250w; author-year refs; 1–6 keywords [ ] G8 submission: fee path decided; ScienceDirect upload checked [ ] G9 review: desk cleared; reviewer-clock expectations logged [ ] G10 revision: point-by-point reply; archive re-run and re-sent [ ] ``` Gates G3–G6 are where RED differs most from a generalist target: they exist because SED-community referees re-derive calibrations and sometimes re-execute code. ## Sequencing rules specific to RED - Build the archive (G6) **in parallel with** the analysis, not after acceptance — the data/code policy bites before final acceptance, and retrofitting seeds and execution order into months-old solver code is the classic schedule killer for simulation-heavy papers. - Do not draft the introduction before G2 and G3 exist; an intro written without a lineage map and a calibration table tends to over-claim and gets rewritten after the moments come in. - Budget compute as a project resource: a global-solution model whose counterfactual takes days to run limits how many referee experiments a two-round revision can absorb. ## Failure-mode router | Observed failure | Gate | Skill | |---|---|---| | Headline number moves when the grid is refined | G4 | `red-identification-strategy` | | Untargeted moments badly missed | G3 | `red-data-analysis` | | Reader cannot restate the mechanism after the intro | G1/G2 | `red-contribution-framing` | | Archive fails a clean-machine rerun | G6 | `red-replication-and-data-policy` | ## Output format ```text [Current stage] idea / model / calibration / estimation / writing / submission / review / R&R [Dynamic bottleneck] scope / mechanism / calibration / computation / archive / response [Next RED skill] [Hard blocker] [Next action] ``` ## Supplementary resources - [`../../resources/official-source-map.md`](../../resources/official-source-map.md) — official RED URLs behind every fact - [`../../resources/external_tools.md`](../../resources/external_tools.md) — Dynare, Julia/SSJ, FRED and reproducibility tooling