--- name: sigcomm-topic-selection description: Use when deciding whether a project is a strong ACM SIGCOMM fit, choosing the research versus experience track, identifying the networking-stack mechanism at the core of the contribution, and routing misfits to NSDI, MobiCom, CoNEXT, IMC, SIGMETRICS, or a systems venue before writing begins. --- # SIGCOMM Topic Selection Use this before writing, and before committing the single yearly deadline. SIGCOMM is the broad networking flagship: it rewards a contribution to the design, measurement, or analysis of networks and communication systems that is stated as a **mechanism or architecture** and proven under **realistic conditions**. Reopen the current CFP's topic list before final routing — emphasis drifts between editions. ## Fit test - Prefer SIGCOMM when the contribution is a networking-stack idea — a protocol, transport or congestion mechanism, routing or forwarding architecture, data-center or wide-area fabric, programmable-data-plane technique, network measurement result, or systems-for-networking design — with evaluation on a testbed, trace, or deployment. - The bar is a **principle that travels**, not a tuned deployment. A single-site tuning win with no generalizable mechanism reads as under-contribution here even if the numbers are good. - Both tracks live under this bar: **research** wants design novelty and depth; **experience** wants lessons only real operation at scale can teach. ## Where else the work might belong | Signal in the project | Better-fit venue | Why | |---|---|---| | Networked-systems build with heavy implementation, USENIX-style | NSDI | Design-and-implementation focus; two deadlines a year | | Mobile, wireless, or physical-layer / RF mechanism | MobiCom (or SIGMOBILE venues) | Over-the-air and device evidence is that community's core | | Solid networking result, but incremental for the flagship | CoNEXT | SIGCOMM's sister venue for strong but narrower contributions | | Pure Internet/traffic **measurement** with no new mechanism | IMC | Measurement-methodology venue; SIGCOMM wants measurement to motivate a mechanism | | Performance modeling / analysis as the contribution | SIGMETRICS | Analytical and evaluation-method emphasis | | OS/storage/distributed-systems core, networking secondary | OSDI / SOSP | Systems-first framing | ## The routing that trips people up SIGCOMM and NSDI overlap heavily, and authors agonize over the split. A workable heuristic: if the paper's spine is a **networking abstraction, protocol, or measurement-driven design argument**, it leans SIGCOMM; if the spine is a **built-and-deployed system whose value is in the engineering and implementation**, it leans NSDI. Neither is a rule — strong papers cross the line both ways — but the single SIGCOMM deadline means a misroute costs a year, so decide deliberately. IMC is the other frequent confusion: a measurement paper needs a **mechanism or a design implication** to be SIGCOMM rather than IMC. ## Vignette: where a congestion-control result goes A project proposes a new congestion signal and shows it cuts tail flow-completion time on a data-center testbed. SIGCOMM reading: strong fit — a transport **mechanism** with tail evidence under realistic traffic is the house genre (compare DCTCP and pFabric in the exemplars). Strip the mechanism and keep only a measurement of how badly today's schemes behave, and it drifts toward IMC; rebuild it as a fully implemented, deployed RPC stack whose contribution is the system, and NSDI becomes competitive. Same core, three homes. ## Sharpening moves before committing - Name the **mechanism** in one sentence: the protocol change, the architectural shift, or the measured invariant. If no mechanism exists, the SIGCOMM framing does not exist either. - Decide the **track** honestly and early; the experience track is a strength for real deployments, not a demotion. - Confirm the evaluation can reach **testbed, trace, or deployment** evidence, not simulation only; simulation-only fabric claims are a quiet fit failure at this venue. - Weigh the **one-deadline cost**: if the result is a year from convincing, plan the year rather than gambling the single February slot. ## Output format ```text [Fit] strong SIGCOMM / possible SIGCOMM / better elsewhere [Track] research / experience / n-a [Best venue] SIGCOMM / NSDI / MobiCom / CoNEXT / IMC / SIGMETRICS / other [Mechanism sentence] [Top rejection risk] [Next action] ```