--- name: sigcomm-workflow description: Use when planning an ACM SIGCOMM project timeline around the single yearly deadline — venue fit, evidence lock, abstract registration and paper upload in February, the early-reject/rebuttal/one-shot-revision review pipeline, shepherd-run camera-ready, TAPS proceedings, artifact evaluation, and forward planning for the next edition. --- # SIGCOMM Workflow Use this as the project-management skill for a SIGCOMM campaign. The defining constraint is one main-track deadline per year feeding one August conference: there is no fall gate, so the plan is a year-long backward schedule from February, not a two-shot hedge. Replace every date with the current official timetable. SIGCOMM is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Committee Co-Chairs (the 2026 roster was not retrievable on 2026-07-09 — 待核实), and the cost model is registration, not APCs; proceedings publish through ACM TAPS into the ACM Digital Library. Chairs rotate yearly, so re-check the current organization page. ## Milestones - **Venue fit and track**: confirm a networking-stack mechanism and pick research vs. experience. - **Evidence lock**: freeze the testbed, traces, workloads, baselines, measurement methodology, and the tail metrics before writing hardens. - **Abstract registration**: real title, authors, topics, conflicts on HotCRP. - **Full-paper upload**: anonymous PDF, 12 single-spaced pre-reference pages, ACM template. - **Review release**: triage across correctness, novelty, evaluation realism, and clarity. - **Rebuttal**: for papers reaching the discussion phase, a concise anonymous reply. - **Decision**: accept, one-shot revision, or reject (early or formal). - **Revision** (if issued): resubmit ~a month later under a shepherd against the issue list. - **Camera-ready**: shepherd sign-off, TAPS final PDF plus source, de-anonymization. - **Artifact evaluation and presentation**: AEC badges, public release, August talk. ## Backward plan from the February paper deadline | Weeks out (heuristic) | Systems/measurement milestone | |---|---| | 14+ | Mechanism designed; testbed or trace pipeline standing and repeatable | | 10 | Core evaluation runs producing stable tails across repeated trials | | 7 | Baselines that fight back implemented and tuned fairly | | 5 | Full draft in ACM two-column format, figures counting against 12 pages | | 3 | Internal mock review by a networking-minded reader; break-point experiment added | | 2 | Reproducibility ledger and artifact skeleton assembled | | 1 | Anonymity sweep, HotCRP fields, abstract registered | | 0 | Full paper uploaded AoE; receipt re-read | These offsets are planning heuristics — anchor each to the current official timetable, never to a previous edition's calendar. ## The year has two halves, not one deadline Because the deadline is annual, the calendar after submission matters as much as before it. As of 2026-07-09 the SIGCOMM 2026 cycle is in its **live post-decision phase**: the February deadline passed, decisions issued, and the work now is camera-ready finalization, shepherd sign-off, artifact evaluation, and the August presentation — while the *next* edition's February deadline is already the horizon for new work. Plan both halves: the run-up to the single deadline, and the shepherd-to-proceedings tail that follows acceptance. ## Failure modes by stage - Evidence still moving at week 5 forces last-minute metric changes nobody has re-run — the classic evaluation-realism reject in the making. - Leaving ACM two-column conversion to the final week surfaces figure-driven overflow late, because figures count against the 12 pages. - Skipping the mock review forfeits the only chance to hear "your baseline is a straw man" from a friend instead of a reviewer. - Treating a one-shot revision as optional polish rather than a shepherd-graded contract is how a revision that dodged the issue list gets rejected. - Deferring the artifact until after acceptance loses the reproducibility evidence that a clean rebuild would have surfaced. ## Coordination notes - Assign one named owner for the reproducibility ledger and another for the anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF and every logged run, since rebuttal and revision replies must quote them precisely. ## Output format ```text [Current stage] idea / evaluation / writing / abstract / submission / rebuttal / revision / accepted [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```