--- name: siggraph-workflow description: Use to plan a SIGGRAPH or SIGGRAPH Asia Technical Papers campaign backward from the deadline, covering the two annual cycles, the form-then-upload two-step submission, the rebuttal window, the Technical Papers Committee decision, conditional-accept second-stage revision, TOG camera-ready, and the in-person presentation. --- # SIGGRAPH Workflow SIGGRAPH runs on **two cycles a year** and a compressed single-round calendar with a journal-grade tail. Planning backward from the right deadline — and knowing which of the two conferences you are targeting — is the highest-leverage move. Dates below are the SIGGRAPH 2026 / SIGGRAPH Asia 2026 snapshots from `resources/official-source-map.md`; reopen the live Important Dates page for your cycle first. ## The two cycles | Cycle | Deadline (approx.) | Conference | 2026 instance | |---|---|---|---| | SIGGRAPH (North America) | ~January | Summer | SIGGRAPH 2026, Los Angeles, 19-23 Jul 2026; form 15 Jan, upload 23 Jan 2026 (22:00 UTC) | | SIGGRAPH Asia | ~May | December | SIGGRAPH Asia 2026, Kuala Lumpur, 1-4 Dec 2026; Stage-2 paper 12 May, upload 13 May 2026 | | TOG direct | rolling | (no conference talk) | ScholarOne, outside the conference cycle — less common | A rejected paper is typically revised against the reviews and resubmitted to the *next* cycle, so the two deadlines form a natural half-year rhythm. Pick the cycle whose deadline your results can credibly meet — a rushed submission to the nearer deadline usually loses to a finished one at the next. ## Backward plan from the upload deadline ```text T-0 Complete submission: PDF (or MD5) + supplemental video + representative image on Linklings T-1wk Submission form locks title/abstract/topics/ALL co-authors (earlier hard deadline) T-2wk Freeze results; render the final results video; clear rights on every frame/figure T-4wk Final comparisons + timings on stated hardware; ablations complete T-8wk Draft complete in acmart (>=2.16); teaser figure locked; internal reviews T-12wk+ Method + implementation stable; baselines reproduced; scene set assembled ``` The two immovable graphics-specific costs are the **results video** (allow real production time) and **faithful baseline comparisons** (allow time to build and run others' code). Neither compresses well in the last week. ## After submission ```text Reviews released -> you see the full set Rebuttal window (~6 weeks post-deadline): <=1000 words, text only, address factual errors Technical Papers Committee meeting: conditional accept / reject + track (Journal vs Conference) [If conditional] make every required change -> second-stage committee verification Camera-ready: TOG metadata, rights/DOI, final video, permanent code archive Presentation: at least one author presents in person at the conference ``` ## Milestone checklist - [ ] Cycle chosen (SIGGRAPH vs SIGGRAPH Asia) and its exact UTC cutoffs confirmed on the live page. - [ ] Track intent chosen (dual-track vs Journal-only) — see `siggraph-submission`. - [ ] Baselines reproduced and running before the writing freeze. - [ ] Results video scoped and scheduled as a real production task. - [ ] Submission form completed (authors locked) before its earlier deadline. - [ ] Rebuttal plan ready the moment reviews land — see `siggraph-author-response`. - [ ] Conditional-accept change list tracked to the second-stage review. - [ ] Camera-ready TOG apparatus and permanent archive prepared — see `siggraph-camera-ready`. - [ ] Presenter and travel confirmed for in-person presentation. ## Reverify each cycle - Both conferences' exact dates and UTC cutoffs, and whether the year runs the usual two editions. - The rebuttal window and length, the acmart revision, and the Conference-track page budget. - Whether review is single-blind or anonymized this cycle (**待核实** for 2026 wording). ## Output format ```text [Target cycle] SIGGRAPH 20XX (Jan) / SIGGRAPH Asia 20XX (May) / TOG-direct [Countdown] weeks to form deadline / upload deadline [Critical path] video production + baseline comparisons on track? yes/no [Post-submission] rebuttal plan / conditional-accept list / camera-ready readiness [Blockers] ```