--- name: sosp-workflow description: Use when planning a SOSP campaign across the annual cycle — back-scheduling from the spring abstract and paper deadlines, running the summer response and July notification, stacking the August camera-ready with artifact evaluation, and retargeting rejections across the SOSP/OSDI/EuroSys circuit. --- # SOSP Workflow Use this to place a project on the SOSP calendar and to decide what to do in the current phase. SOSP has been **annual since 2024** (the SIGOPS announcement is at `sigops.org/2023/sosp-is-going-annual/`), which changed campaign planning from a two-year bet into a rolling circuit. All dates below were checked 2026-07-08. ## The 2026 cycle as the template | Milestone (2026 cycle) | Date | Phase it opens | |---|---|---| | Abstract registration | March 27, 2026 (Apr 1 AoE window rendered in EDT on HotCRP) | Freeze title/authors/conflicts | | Full paper deadline | April 2, 2026, 7:59:59 AM EDT | Review | | Author response window | Announced with reviews, pre-PC-meeting | `sosp-author-response` | | Notification | July 3, 2026 | Camera-ready + AE (accepted) or retarget (rejected) | | Camera-ready | August 28, 2026 | Shepherded final version | | Conference | Sep 29 - Oct 2, 2026, Prague, Czech Republic | Talk, posters, workshops | As of **2026-07-08 the notification has just landed**: teams are either five days into the acceptance track or five days into retargeting. SOSP 2027 dates are unpublished (待核实 at `sigops.org` and `sosp.org`); the annual pattern implies a spring 2027 deadline, but never back-schedule against an implied date — only against a posted one. ## Accepted: three threads, two months July 3 to August 28 runs three deadline-bound conversations in parallel, and the standing failure is one person owning all three: 1. **Shepherd thread** — revision plan within days, agreed scope, 13th/14th page negotiation (see `sosp-camera-ready`). Owner A. 2. **Artifact thread** — sysartifacts registration opens days after notification; the evaluation window is interactive (see `sosp-artifact-evaluation`). Owner B. 3. **Logistics thread** — ACM rights form, registration, Czech-entry visas where needed, talk preparation. Owner C, earliest start wins on visas. ## Rejected: the retargeting circuit Annual SOSP plus annual OSDI plus the EuroSys/ATC/NSDI ring means a systems paper is rarely more than a few months from its next natural deadline. Retarget on a decision tree, not on grief: - Reviews attack **soundness** (evaluation holes, unisolated mechanisms): fix the evidence first; the next deadline is whichever one the new experiments make. - Reviews attack **fit or significance** but concede soundness: the paper may be right for a sibling with a different center of gravity — networked-systems framing to NSDI, storage framing to FAST, deployment/practitioner framing to ATC. - Reviews are **strong with one blocker**: an OSDI resubmission in the next window with a surgical fix and a cover-your-delta introduction paragraph is the highest expected-value move. Exact sibling deadlines shift every cycle (待核实 against each venue's current CFP before promising a date to co-authors). ## Back-scheduling the next submission ```text T-9 months problem locked; motivating measurement exists; skeleton design review T-6 months system runs end-to-end on one workload; claim list drafted T-4 months evaluation matrix frozen (sosp-experiments); baselines built and tuned T-10 weeks full experimental sweep begins; env capture automated (sosp-reproducibility) T-6 weeks complete draft; strict 15-minute read by an outside systems reader T-3 weeks evaluation freeze; figures one-command from logs T-10 days format compile, leak sweep, conflict list drafted (sosp-submission) T-6 days abstract registration T-0 upload; verify the HotCRP-held PDF, not the local one ``` The two intervals teams misjudge: baselines (building and fairly tuning someone else's system routinely costs a month) and the draft-to-freeze gap (a SOSP draft that first exists three weeks before the deadline reads like it). ## Cadence discipline for a group - Track the circuit in one shared calendar: SOSP, OSDI, EuroSys, ATC, NSDI, FAST, plus HotOS in odd rhythm for early-stage ideas — each with abstract and paper gates, refreshed from official CFPs each fall and spring. - One project, one primary venue bet, one named fallback — deciding the fallback *before* notification removes the week of post-rejection drift. - Never submit the same work to overlapping review cycles; systems venues share PC members and treat dual submission as an integrity violation. ## Output format ```text [Phase] where this project sits on the cycle today [Owners] shepherd / artifact / logistics threads assigned? [If rejected] soundness vs fit diagnosis -> named next venue + posted deadline [Back-schedule] T-milestones with dates against the next posted deadline [Calendar risk] the interval currently underestimated ```