--- name: tacas-workflow description: Use when planning a TACAS (ETAPS) project timeline from category choice and venue fit through the EasyChair paper deadline, the mandatory tool-paper artifact deadline, the rebuttal window, notification, the voluntary post-acceptance artifact round, LNCS camera-ready, and presentation, with backward-planning offsets that account for TACAS's single annual round and its parallel paper+artifact review. --- # TACAS Workflow Use this as the project-management skill for a TACAS submission. Replace every date with the current ETAPS joint schedule and work backwards from the **EasyChair paper deadline** — remembering that for a **tool or tool-demonstration** paper a second, firm **artifact deadline** lands about two weeks later and its evaluation runs **in parallel with the PC**. TACAS runs a **single annual review round** on the shared ETAPS calendar (it does not use ESOP's two rounds), so missing the deadline costs roughly a year. TACAS is a conference whose proceedings are an open-access LNCS volume: it has **no standing editor-in-chief** and **no author-facing APC**. Rotating leadership is the per-edition **PC chairs** and the **ETAPS steering committee**; the cost model is registration, and ETAPS funds the gold open access centrally. Chairs rotate yearly — re-check the current TACAS page rather than carrying a name forward. ## The reported TACAS 2026 timeline (verify on the live page) - **Paper submission:** 16 Oct 2025 (AoE). - **Mandatory artifact** (regular tool + tool-demonstration): 30 Oct 2025. - **Rebuttal / author response:** 8-10 Dec 2025. - **Notification:** 22 Dec 2025. - **Voluntary artifact** (accepted research + case-study): 8 Jan 2026. - **Conference:** ETAPS 2026, Turin, 11-16 Apr 2026 (main conferences 13-16 Apr). As of 2026-07-09 the TACAS 2026 edition has already taken place, so the **live next target is TACAS 2027** (ETAPS 2027, Copenhagen, 10-15 Apr 2027). ## Milestones - **Venue + category fit:** confirm TACAS over CAV/VMCAI/FMCAD and pick the category (`tacas-topic-selection`) — this fixes the page limit, blind mode, and artifact obligation. - **Evidence + tool lock:** freeze the algorithm/tool, the benchmark set, the baselines, and the artifact contents. - **Submission:** upload the LNCS PDF via EasyChair; anonymize if it is a **research** paper. - **Mandatory artifact (tool/tool-demo):** submit the clean-VM artifact on its firm deadline; it gates acceptance. - **Rebuttal:** answer the reviews in the ETAPS response window. - **Notification:** archive reviews and every submitted version. - **Voluntary artifact (research/case-study):** if pursuing badges, submit after acceptance. - **Camera-ready + presentation:** prepare the LNCS camera-ready, complete Springer rights, register, and present. ## Backward plan from the paper deadline | Weeks out (heuristic) | Verification-tool milestone | |---|---| | 10+ | Category chosen; algorithm/tool feature-frozen; benchmark set and baselines chosen | | 8 | Experiments run; wall-clock/scalability logged on stated hardware; soundness argument drafted | | 6 | Comparison against the strongest baseline complete with equal budgets; results tables built | | 4 | Full draft in `llncs.cls` within the page limit; **artifact assembled in the clean VM** | | 3 | Internal mock review by a verification-literate reader; artifact dry-run on a fresh VM | | 2 | Tool/tool-demo: freeze the artifact for its post-paper deadline; research: anonymity sweep | | 1 | Final PDF check; EasyChair fields, category, conflicts complete | | 0 | Submit paper; then (tool/tool-demo) submit the mandatory artifact on its firm date | These offsets are planning heuristics only — anchor every one to the current ETAPS joint CfP, never to a previous cycle. ## Failure modes by stage - **Leaving the artifact to after the paper** for a tool/tool-demo paper — the mandatory artifact deadline is only ~two weeks out and a package that does not build on the ETAPS VM costs the paper. - **Experiments still moving at week 4** forces last-minute benchmark runs nobody has audited — the classic unfair-comparison or unreproducible-result reject. - **Anonymizing the wrong category** — stripping the tool name from a single-blind tool paper, or forgetting to anonymize a double-blind research paper. - **Treating the rebuttal as decisive** — it corrects misreadings and supplies a missing number; it does not rewrite the paper. ## Coordination notes - Assign one owner for the **artifact / clean-VM build** and another for the **paper**; for a tool paper these are two deadlines a fortnight apart and shared ownership is how the artifact slips. - Archive the exact submitted PDF and artifact — the rebuttal and camera-ready must quote them. ## Output format ```text [Current stage] idea / evidence / writing / submitted / rebuttal / notified / camera-ready / accepted [Category] research / case-study / regular tool / tool-demonstration [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```