--- name: usenixsec-author-response description: Use when reviews arrive from a USENIX Security Symposium cycle and the authors must respond — writing the rebuttal that survives online PC discussion, handling required ethics-content revisions flagged mid-review, and working with a shepherd after an "Accepted on Shepherd Approval" decision. --- # USENIX Security Author Response USENIX Security gives authors two distinct speaking moments, and they obey different rules: the mid-review response to reviewers, and the post-decision exchange with a shepherd. This skill covers both. Mechanics shift per cycle — the '25 model was documented in detail on the reviewing-model page, the '26 model partially, and the '27 mechanics are 待核实 — so confirm the current instructions in HotCRP before drafting. ## Where the response sits in the pipeline In the '25 model (the last fully documented one): two reviews in round one; papers survive to round two if at least one reviewer sees a path to acceptance after online discussion; round two adds two more reviews; **then** authors respond; reviewers discuss again and decide. Two consequences follow: - By the time you respond, four reviewers have read the paper but the committee has not settled. The response's real audience is the discussion that follows it. - Papers cut at the early-reject notification never get a response window at all. There is no appeal lane inside the cycle; the recovery move is a revised resubmission (see `usenixsec-review-process` for the restriction rules). One more '25-documented pattern worth planning for: submissions with inadequate ethics discussions were flagged during review, and authors were **required** to supply revised ethics content in the response phase. Treat an ethics question in a review as a compliance demand, not an opinion to debate. ## Sorting the reviews before writing | Objection type | What it usually means at this venue | Response move | |---|---|---| | Threat model unrealistic | Reviewer rejects the attacker capabilities | Defend with deployment evidence, or narrow the claim explicitly | | Ethics gap / disclosure question | Compliance flag, possibly chair-visible | Answer completely; state disclosure timeline and vendor contact status | | Evaluation missing an adaptive attacker | Defense papers' most common kill | Present the adaptive experiment if it exists; commit precisely if it fits shepherding scope | | Overlap with concurrent work | Cycle collision, common with two cycles/year | Date the overlap, differentiate mechanism and evidence | | "Measurement may be artifact of vantage point" | Methodology doubt | Show cross-vantage or cross-time consistency numbers | Answer the compliance-shaped items first and fully; a brilliant technical rebuttal does not offset an unanswered disclosure question. ## Drafting rules that fit this venue - Number every point and quote the review fragment being answered; the discussion phase skims, and unanchored prose gets skipped. - Give evidence that already exists (a table row, an appendix reference, a number) priority over promises. Since '26 the largest change a paper can absorb after decision is a **two-week shepherding pass** — never promise revisions bigger than that window can hold. - Keep anonymity discipline: no identifying links, no "in our lab" phrasing. - If a reviewer misread, demonstrate the misreading with a page/section pointer and move on without scoring the point. ```text # Response skeleton (per review point) [R2.3] "the scanner may overload targets" Facts: Section 5.2 caps probe rate at 1 req/s/host; opt-out honored within 24h (Appendix: Ethical Considerations, para 2). Change offered: none needed — pointer only. [R1.4] "no adaptive attacker" Facts: new experiment, gradient-aware evader, detection drops 94%→81% (table below). Change offered: add as Sec 6.4 (~0.5 page); fits shepherding scope. ``` ## After the decision: shepherd mode "Accepted on Shepherd Approval" (the '26 outcome replacing major revisions) means the committee wants the paper but conditions publication on named changes — clarifications, limitation discussions, toned-down claims — that are unlikely to change enthusiasm. Working rules: 1. Convert the decision letter into a change matrix (request → edit → location) and send it to the shepherd before editing, so scope is agreed once. 2. Deliver inside the two-week window; the shepherd's sign-off is the acceptance. 3. Do not smuggle in new results the committee never reviewed; flag anything beyond the requested list explicitly and let the shepherd rule on it. 4. Track every edit against the camera-ready deadline for your cycle — shepherding and final-paper preparation overlap (see `usenixsec-camera-ready`). ## Reverify each cycle - Whether the current cycle includes an author response phase at all, its length, and its format (HotCRP field vs PDF) — '27 values 待核实. - The shepherding window length and whether "Accepted on Shepherd Approval" remains the intermediate outcome. - Any word/character limit on responses. ## Output format ```text [Phase] mid-review response / shepherd exchange [Compliance items] ethics or disclosure questions + answers drafted: yes/no [Point map] review point → evidence → offered change (within shepherding scope?) [Risk] points conceded or narrowed, and the wording [Next deadline] response or shepherd deadline, camera-ready implications ```