--- name: usenixsec-review-process description: Use when reasoning about how a USENIX Security Symposium cycle actually decides — early-reject notifications, multi-round reviewing, the retirement of Major Revision in favor of shepherd-approval acceptances, resubmission restrictions between cycles, and what each notification email means for planning. --- # USENIX Security Review Process USENIX Security reviews in two annual cycles, each a self-contained pipeline from registration to notification. The '26 cycle mechanics below were read from usenix.org pages on 2026-07-08 (via search renderings; direct fetch 403'd), with the '25 reviewing-model page as documented history. The '27 mechanics under chairs Adam Doupé (Arizona State) and Andrei Sabelfeld (Chalmers) are only partially posted — treat everything here as one venue-generation's snapshot. ## The cycle pipeline, with '26 dates as the worked example | Stage | Cycle 1 ('26) | Cycle 2 ('26) | What is happening | |---|---|---|---| | Registration | Aug 19, 2025 | Jan 29, 2026 | HotCRP record frozen; bidding data set | | Submission | Aug 26, 2025 | Feb 5, 2026 | Format/policy screening begins | | Early reject | Oct 7, 2025 | Mar 17, 2026 | Bottom of the pool exits after first-round reads | | Final notification | Dec 4, 2025 | May 14, 2026 | Accept / shepherd-approval / reject | | Finals due | Jan 15, 2026 | Jun 11, 2026 | Shepherding + Phase-1 AE complete | The '25 model (last fully published) shows the shape inside those windows: two first-round reviews; online discussion; survivors gain two more reviews in round two; authors respond; the committee discusses to a decision. Expect roughly that structure until the current cycle's reviewing-model page says otherwise (待核实 for '27). ## The decision vocabulary changed — don't plan on 2025 rules Through '25, USENIX Security ran an Accept / **Invited Major Revision** / Reject scheme, where a major revision returned to the same reviewers in a later cycle. **The '26 CFP retired major revisions.** The current outcomes: - **Accept** — proceed to camera-ready and mandatory artifact-availability check. - **Accepted on Shepherd Approval** — the committee wants the paper conditional on changes a two-week shepherding pass can hold: clarifications, explicit limitations, calibrated claims. Not a lane for new experiments. - **Early reject / reject** — out of the cycle. Whether and when the work may return is governed by per-year resubmission restrictions; the '26 CFP delegated restrictions on its Cycle-2 rejects to the '27 chairs. **Always check the current restriction text before queuing a resubmission** — this is the venue's most frequently misremembered rule. Strategic consequence: the paper must be finished at submission. The old major-revision safety net — submit at 85% and repair through revision — no longer exists; its replacement (shepherding) fixes prose, not evidence. ## What reviewers here weigh Beyond ordinary top-venue novelty/rigor screens, this committee applies filters that surprise authors from adjacent fields: 1. **Ethics adequacy is a gate, not a score.** Weak Ethical Considerations content can trigger required revisions mid-review or sink the paper regardless of technique (the ethics guidelines page is explicit that expectations bind). 2. **Threat-model realism.** An attack needing implausible attacker position, or a defense evaluated only against non-adaptive adversaries, loses reviewers who ask "who does this actually affect?" 3. **Openness posture.** Since the Open Science policy, a vague availability story is a review-visible weakness, not a post-acceptance detail. 4. **Measurement validity.** Vantage-point, time-window, and ground-truth skepticism is a house specialty. ## Reading each email ```text Early reject → 4 reviews were not spent on you; the pool's bottom tier. Diagnose fit and framing, not just polish. Consider usenixsec-topic-selection before re-targeting. Reject (final) → full reviews attached; mine them for the resubmission and check the current cross-cycle restriction before re-queuing. Shepherd approval → acceptance-in-waiting; scope the change list within 48h (see usenixsec-author-response). Accept → the artifact clock is already running (see usenixsec-camera-ready). ``` ## Confidentiality and conduct Submissions are confidential to the committee; reviewer identities are hidden; contacting reviewers or attempting to identify them is out of bounds. Conflicts declared at registration drive assignment — fabricating conflicts to dodge a skeptical expert is chair-level misconduct at USENIX as elsewhere. ## Reverify each cycle - The current reviewing-model description, response phase, and round structure. - Decision categories and shepherding window ('27 待核实). - Resubmission restrictions between cycles and across years. - Early-reject and notification dates for the live cycle. ## Output format ```text [Cycle position] stage now + next date that matters [Decision model] outcomes in force this cycle (verified on: ) [Exposure] ethics gate / threat-model realism / openness / measurement validity [Plan] action per possible outcome, with resubmission-restriction check ```