--- name: vldb-workflow description: Use when planning a VLDB project on the PVLDB rolling calendar, covering month-picking strategy, the volume-to-conference mapping and acceptance cutoff, budgeting a possible three-month revision, coordinating author caps across a group, and backward planning from the 25th-abstract / 1st-paper rhythm. --- # VLDB Workflow Use this as the project-management layer. PVLDB's defining freedom — a deadline every month — is also its trap: with no scarcity forcing quality, the calendar discipline must come from you. ## Know your volume geometry first On 2026-07-08 the live volume is **Vol 20**: deadlines April 1, 2026 through March 1, 2027, feeding VLDB 2027 (Athens, Aug 23-27, 2027). Vol 19 fed VLDB 2026 (Boston, Aug 31 - Sep 4, 2026) with a June 15, 2026 acceptance cutoff; acceptances after a cutoff roll to the next conference. Re-derive this geometry from the live guidelines whenever you plan — it resets every volume. ## Month-picking, done as arithmetic The right month is computed backward from what you want, not chosen by mood: | Goal | Computation | |---|---| | Present at the volume's conference | Cutoff month − 1.5 months (review) − 3 months (possible revision) − 1.5 months (re-review) ⇒ submit roughly **6 months before the cutoff** to keep the revision path open | | Accept-or-nothing, no revision slack | Cutoff − 1.5 months, accepting that a revise verdict rolls you past it | | No conference-year preference | The month your weakest experiment is actually fixed | | Thesis or job-market date | Decision date needed + 1 month safety, then backward as above | The month itself carries no difficulty signal — the review board is standing and the bar is flat. What varies is *your* readiness. ## One cycle, backward from the 1st ```text Day -21 go/no-go: evaluation complete? loss map measured? Day -14 internal builder-review (a colleague reads as Reviewer 2) Day -10 fixes from mock review; freeze the claim set Day -6 (25th) abstract registered in CMT — title and authors final Day -5..-2 full-text polish, artifact tag, fairness ledger check Day -1 PDF built on the volume template; local time of 5PM PT confirmed Day 0 (1st) submit hours early; Pacific afternoon, not local midnight ``` If the go/no-go fails, slide one month. That sentence is the whole advantage of this venue — use it instead of negotiating with your own evidence. ## Revision bandwidth is a scheduling object A revise verdict opens a three-month window that will collide with whatever else the group planned. Before submitting, name the two people who would own a revision and check their next quarter. A revision no one has time to execute converts positive signal into a rejection. ## Group-level calendar management - Track every member's live submissions against the two-per-month and twelve-per-year caps in one shared sheet. - Stagger related papers across months so a shared infrastructure fix does not block two deadlines at once. - Log every cycle's dates the moment reviews arrive: decision on the ~15th, revision due date, expected issue. Rolling venues punish loose bookkeeping with silent misses. ## Conference logistics tail Publication precedes presentation by months. After acceptance: registration, visa lead time for the conference country (Greece for Vol 20's VLDB 2027), and speaker assignment — obligations and pricing are cycle-specific (待核实 on the conference site). ## Output format ```text [Volume geometry] [Target month + rationale] [Go/no-go state] [Revision bandwidth] [Cap ledger] [Slip plan] ```