--- name: acmmm-workflow description: Use when planning the end-to-end ACM MM (ACM Multimedia) campaign calendar — from thematic-area scoping and track choice, through the April OpenReview abstract/paper/supplement chain, the June anonymous rebuttal, the July decision, the August camera-ready, and the November presentation in Rio, with the right skill invoked at each stage. --- # ACM MM Workflow Use this to run an ACM Multimedia submission as a scheduled campaign rather than a deadline scramble. The SIGMM calendar has a long gap between the April submission chain and the July decision, so the work clusters at the front and the back. ## The ACM MM calendar (2026 anchors, AoE) | Phase | 2026 date | What must be true | Skill | |---|---|---|---| | Scope + track choice | pre-March | Contribution is cross-modal; thematic area and track chosen | `acmmm-topic-selection` | | Draft + evidence | March | First page leads with the multimedia claim; ablations planned | `acmmm-writing-style`, `acmmm-experiments` | | Abstract | Mar 25 | Abstract registered in OpenReview | `acmmm-submission` | | Paper | Apr 1 | 6–8 sigconf pages, anonymous, final PDF | `acmmm-submission` | | Supplement | Apr 8 | Media/appendix package, anonymous, plays | `acmmm-supplementary` | | Rebuttal | ~Jun 4 | Anonymous response, small confirmatory results | `acmmm-author-response` | | Notification | ~early Jul | Decision + tier | `acmmm-review-process` | | Camera-ready | ~Aug 6 | De-anonymized ACM version, artifact released | `acmmm-camera-ready` | | Conference | Nov 10–14 | Registered; media-ready talk/poster | `acmmm-camera-ready` | Treat these dates as the 2026 snapshot; reopen the current site each cycle. Note the 2026 notification date was listed inconsistently (July 7 on the CFP vs. July 9 elsewhere). ## Front-loaded work (before April) The April chain is unforgiving because three deadlines land in eight days. Do the slow work early: - Lock the **thematic area and track** — they set format and blinding, and switching late is expensive. - Build the **cross-modal evidence**: matched baselines and the leave-one-modality-out ablation that proves the fusion matters. - Plan any **user study** now; recruiting raters cannot be done in the final week. - Draft so the first page already leads with the multimedia contribution. ## The three-deadline sprint ```text T-14d: freeze claims; media assets rendering from scripts T-7d: body fits 6-8 sigconf pages; references on overflow pages only Mar 25: abstract registered (do not miss the earliest deadline) Apr 1: paper PDF final, anonymous, metadata-clean Apr 8: supplement packaged, anonymous, media plays for a stranger ``` ## The long gap and the rebuttal Between April and June, prepare the confirmatory experiments a reviewer is likely to ask for (the missing baseline, the extra ablation) so the June rebuttal is a matter of *reporting* results, not scrambling to run them. ## Back end (July–November) - On acceptance, de-anonymize, complete ACM rights/CCS, and release the public artifact. - Register early and plan travel to **Rio**; visas and international logistics are the usual failure. - Build a presentation that **plays the media** — the seam between modalities should be seen/heard, not just described. - On rejection, use the reviews to re-target: MM Asia, ICMR, a workshop, or next year's MM. ## Risk register | Risk | Where it bites | Mitigation | |---|---|---| | Missing the abstract deadline | Mar 25 forecloses the paper | Register the abstract days early | | Wrong track blinding | Desk reject | Confirm the track call before formatting | | Fusion not shown to matter | Reviews / rebuttal | Run the leave-one-modality-out ablation pre-submission | | User study not recruited in time | Perceptual claim unbacked | Start recruiting before April | | Broken anonymous media link | Lost evidence in review | Test the mirror from a clean machine | | Rio travel/visa delay | Cannot present | Start visa paperwork at acceptance | ## Re-targeting after a rejection An ACM MM rejection is not the end of the work. Match the reviews to the next move: a retrieval-leaning paper can go to **ICMR**; a systems-leaning one to **MMSys**; a regionally scoped or earlier-stage result to **ACM Multimedia Asia** or a **workshop**; a matured version to the **ACM TOMM** journal or next year's ACM MM. Fix the decisive critique — usually the cross-modal-significance one — before resubmitting anywhere. ## Output format ```text [Current phase] [On track?] yes / at-risk: [Next deadline] [Active skill] [Risks] ```