--- name: aistats-workflow description: Use when planning an AISTATS project timeline from venue fit through abstract submission, full-paper upload, supplementary material, review release, author-reviewer discussion, decision, camera-ready, PMLR publication, registration, presentation, and artifact release, with backward-planning offsets for theory-plus-experiments papers. --- # AISTATS Workflow Use this as the project-management skill for an AISTATS submission. Replace all dates with the current official timetable and work backwards from OpenReview cutoffs. AISTATS is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge. The rotating leadership is the per-edition General Chairs and Program Chairs (2026 General Chairs: Emtiyaz Khan and Yingzhen Li; Program Chairs: Arno Solin and Aaditya Ramdas, verified 2026-06-22), and the cost model is registration fees, not APCs — PMLR proceedings are open-access with no author fee. Conference organizers rotate yearly, so re-check the current CFP and organization page rather than carrying a name forward. ## Milestones - Venue fit: confirm the contribution is genuinely at the AI, ML, and statistics interface. - Evidence lock: freeze theorem statements, assumptions, experiments, simulations, baselines, reproducibility checklist, and supplement contents. - Abstract deadline: submit real title, abstract, authors, subject areas, and conflicts. - Full-paper deadline: upload anonymous PDF and required OpenReview fields. - Supplement deadline: upload anonymized appendix/code/data if current cycle allows or requires separate supplementary material. - Review release: triage correctness, statistical validity, novelty, clarity, and reproducibility concerns. - Discussion period: draft concise anonymous text-only clarifications; avoid forbidden links or unsupported new results. - Decision: archive reviews, discussion, meta-review, decision, and submitted versions. - Acceptance: prepare PMLR camera-ready files, registration, in-person presentation, and public artifact release. ## Backward plan from the paper deadline | Weeks out (heuristic) | Theory-plus-experiments milestone | |---|---| | 8+ | Theorems proved, assumption set frozen | | 6 | Simulations designed against each theorem | | 4 | Real-data runs complete, seeds logged | | 3 | Full draft sitting in AISTATS two-column format | | 2 | Internal mock review by a statistics-minded reader | | 1 | Checklist pass, anonymity sweep, supplement assembly | | 0 | Abstract then full paper on OpenReview; supplement by its own cutoff | These offsets are planning heuristics only — anchor every one of them to the current official timetable, never to a previous cycle's calendar. ## Failure modes by stage - Theory still moving at week 3 forces last-minute theorem edits nobody has verified — the classic AISTATS correctness reject in the making. - Leaving format conversion to the final week surfaces overflow late, because two-column math is far tighter than a one-column working draft. - Skipping the mock review forfeits the only chance to hear "your experiments violate Assumption 2" from a friend instead of a reviewer. - Building the supplement after the paper deadline under time pressure is how anonymity leaks ship. ## Coordination notes - Assign one named owner for the reproducibility checklist and another for the anonymity sweep; shared ownership is how both slip. - Archive the exact submitted PDF, supplement, and checklist, since discussion-phase replies must quote them precisely. ## Output format ```text [Current stage] idea / experiments / writing / abstract / submission / supplement / discussion / accepted [Next official deadline] [Critical path] [Risk register] [Owner map] person or role> ```