--- name: ase-workflow description: Use when planning an ASE (IEEE/ACM Automated Software Engineering) research-track campaign backward from the deadline, through abstract registration, the double-anonymous submission, the early-rejection gate, rebuttal, the criteria-bound revision round, artifact evaluation, and the camera-ready in both IEEE Xplore and the ACM Digital Library. --- # ASE Workflow Run the ASE year backward from the deadline. ASE is an annual conference (dual IEEE/ACM sponsored) whose research track has an **early-rejection gate**, a **rebuttal**, and a first-class, criteria-bound **Revision** outcome; plan for all three. Every date below is a one-cycle snapshot — reopen the current Important Dates page first (see `resources/official-source-map.md`). ## Anchor dates (ASE 2026 snapshot — verify each cycle) - **Research submission:** 26 March 2026. **Notification:** 25 May 2026. **Conference:** Munich, Germany, 12-16 October 2026. - The **abstract-registration deadline** preceding the full-paper deadline is **待核实** — confirm it; it is a hard gate. - As of 2026-07-09 the ASE 2026 notification has passed. The next *submission* target is **ASE 2027** (host/dates **待核实**). Reverify before planning. ## Backward plan from the deadline ```text T-16 wk Route with ase-topic-selection: ASE research vs. NIER/Tools vs. FSE/ISSTA/journal. T-14 wk Lock the automation and the subject systems; freeze what the tool does and what it runs on. T-10 wk Build evidence (ase-experiments): real subjects, fair tool baselines, ablation isolating any learned component. Pin provenance now (ase-reproducibility) — it cannot be retrofitted. T-6 wk Draft to the ASE arc (ase-writing-style) against the worked example; write related work delta-first (ase-related-work). Keep to 10 content pages + 2 reference pages. T-3 wk Assemble the anonymized artifact and the mandatory Data Availability Statement. T-1 wk Register the abstract before its (earlier) deadline. Double-anonymous sweep (ase-submission) on tool names, repos, PDF metadata. T-0 Submit on ase26.hotcrp.com in the mandated template (ACM acmart sigconf for 2026). ``` ## After submission — the review timeline ```text [Reviews + early-rejection gate] uniformly negative scores -> early reject, no rebuttal. [Rebuttal] if you reach it, at least one reviewer saw value; move the borderline reviewer with facts and small checkable numbers. [Outcome] Accept / Revision / Reject. [Revision round] meet every stated criterion; return the revised paper + a point-by-point summary-of-changes, re-checked against the criteria. [Camera-ready] de-anonymize, apply the extra content page, finalize IEEE/ACM metadata; the paper is indexed in BOTH IEEE Xplore and ACM DL. [Artifact evaluation] on its own deadline: target Available and Reusable badges. [Presentation] at least one author presents at ASE. ``` ## Track fork (decide early, they have separate deadlines and sites) - **Research Papers** — the full technique/tool contribution (this workflow). - **NIER** — a bold early idea (4 pages) on its own HotCRP (`ase2026-nier.hotcrp.com`). - **Tools and Datasets** — a usable tool/dataset (≤4 pages) demo-oriented. - **Journal-First** — TSE/TOSEM/EMSE work accepted after 1 Jan 2025, presented at ASE. - **Industry Showcase / Doctoral Symposium / Workshops** — separate calls and timelines. ## Risk register (ASE-specific) | Risk | When it bites | Mitigation | |---|---|---| | Missed abstract registration | Days before the full deadline | Register title/abstract/authors/conflicts a week early | | Wrong template | Camera-ready or desk-check | Confirm IEEE-two-column vs. ACM `acmart` on the current call *before* drafting | | Over 10 content pages | Final week | Freeze the body early; the 2 reference pages do not absorb text | | Missing Data Availability Statement | Desk check | Draft it at T-3 wk, after Conclusions, inside the 10 pages | | Early-rejected | At the gate | Make the first three pages and the evaluation table land immediately | | A revision criterion ignored | Revision re-check | Ledger every criterion in the summary-of-changes | | Artifact not ready | Post-acceptance | Stage the DOI-archived, documented tool before the AE deadline | ## Parallelizable vs. sequential - **Parallel:** artifact packaging can proceed alongside writing; provenance pinning must happen at data-collection time regardless. - **Sequential:** venue routing → evidence → writing → anonymity sweep → submission; and reviews → (early-rejection gate) → rebuttal → revision → camera-ready → artifact evaluation. ## Output format ```text [Target cycle] ASE 20XX, submission , notification , conference [Track] research / NIER / tools-and-datasets / journal-first [Milestones] [Gate readiness] abstract registered? template correct? 10+2 respected? Data Availability present? [Post-submission plan] early-rejection risk / rebuttal targets / revision-criteria readiness / artifact ```