--- name: atc-workflow description: Use when planning an ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) campaign end to end — running the year backward from the early-June deadline through the two review rounds, the rebuttal, conditional-acceptance shepherding, the post-acceptance artifact evaluation, and the ACM Open Access camera-ready for the November Hong Kong conference. --- # ATC Workflow Plan the campaign backward from the deadline. ATC 2026 — the first **ACM SIGOPS** edition of the former **USENIX ATC** — runs on a calendar and a review structure that both changed in the transition: an **early-June 2026** submission deadline (AoE; 1 vs. 10 June unresolved across renderings — 待核实), a **two-round, extended-abstract** review, **conditional acceptance with shepherding**, a separate **artifact-evaluation** track, and the conference in **Hong Kong, 15-18 November 2026**. Reopen the SIGOPS call for the exact dates before committing to any of the offsets below. ## The arc (backward from the deadline) ```text [T-0 Submission] paired upload: 2-page extended abstract + full paper on atc26.hotcrp.com [Round one] two reviewers judge each extended abstract; below-bar papers cut early [Round two] 3-4 reviewers read the full paper of survivors [Rebuttal] ~1 page: correct factual misreadings; note prior-submission changes if any [Decision] conditional accept / reject [Shepherding] a PC shepherd signs off required revisions before final acceptance [Artifact evaluation] separate post-acceptance AEC track -> Available / Functional / Reproduced [Camera-ready] de-anonymize, satisfy shepherd, ACM Open Access metadata + production checks [Nov 15-18] present at the Hong Kong conference; talk video/slides per the venue norm ``` ## Backward plan from the June deadline - **T-10 to T-8 weeks:** lock the system and freeze the experiments. On a systems paper the testbed and measurements are the long pole; leave prose churn for later. Pin environments now (`atc-reproducibility`) — provenance cannot be reconstructed at the deadline. - **T-6 weeks:** full-paper draft complete against `atc-writing-style`; baselines and honest costs in place per `atc-experiments`. - **T-3 weeks:** write and stress-test the **two-page extended abstract** — the round-one decision surface. Have someone read *only* the abstract and tell you the problem, contribution, testbed, and result. If they cannot, fix it. - **T-2 weeks:** build the anonymized, runnable artifact and the claim-to-experiment map. - **T-1 week:** double-blind sweep on the final PDF, abstract, and artifact; fill HotCRP fields and conflicts; confirm the exact AoE deadline day. - **T-0:** upload both the extended abstract and the paper; re-download and read cold. ## Between submission and decision - **Round one is silent from your side** — there is no action between upload and the round-one cut; the abstract is your entire round-one argument. Do not start major new experiments hoping to swap in a stronger paper mid-cycle. - **If you advance to round two,** prepare for the rebuttal: keep a running list of the measurements and clarifications a skeptical reviewer would ask for, so the ~1-page window is spent well (`atc-author-response`). ## After a conditional accept - Treat the **shepherd's required revisions as binding**. Make each change or explicitly justify declining it; the shepherd holds final acceptance until satisfied. - Start the **artifact-evaluation** package immediately: the AEC track has its **own post-acceptance deadline**, independent of the camera-ready (`atc-artifact-evaluation`). De-anonymize and archive the artifact in a DOI-issuing repository for the Available badge. - Prepare the **camera-ready**: de-anonymize the paper, fold in the shepherd's changes, and complete **ACM Open Access** metadata (`atc-camera-ready`). Budget for the transition **APC** (subsidized for 2026; exact figure per the ACM/SIGOPS terms). ## Calendar reconnaissance ```text [Deadline] confirm the exact early-June AoE day on the SIGOPS call (1 vs 10 June — 待核实) [Conference] Hong Kong (Hyatt, Shatin), Nov 15-18, 2026 — plan travel/visa early for HK [Rotation] under SIGOPS, ATC rotates Asia/Europe/North America; next-year location differs [Artifact] find the AEC submission date on the call for artifacts (separate from camera-ready) [Backup] if rejected, line up OSDI/NSDI/EuroSys/FAST dates via atc-topic-selection ``` ## Reverify each cycle - The exact deadline day, notification/rebuttal dates, and camera-ready date. - Whether the two-round extended-abstract model and the reviewer counts persist. - Artifact-evaluation timing and the badge set; the Deployed Systems lane (**待核实**). - ACM Open Access / APC terms; template file (USENIX vs. ACM) (**待核实**). ## Output format ```text [ATC workflow stage] planning / drafting / abstract-hardening / submitted / round two / rebuttal / shepherding / artifact / camera-ready [Critical path] the long-pole task (usually testbed + measurements, then the extended abstract) [Deadline set] submission (early June AoE), rebuttal, shepherd sign-off, artifact, camera-ready [Next action] the single most schedule-critical step, with a date [Risk] the item most likely to slip (provenance pinning / abstract self-containment / shepherd changes) ```