--- name: ipsn-writing-style description: Use when revising an IPSN-lineage paper for a real sensing problem on the first page, a load-bearing information-processing or platform contribution, ground-truth methodology, energy/latency/accuracy budgets, honest deployment reporting, double-blind wording, and disciplined use of the ≤12-page ACM two-column budget. --- # IPSN Writing Style Use this when revising the main paper. IPSN papers are read by sensor-systems and information-processing reviewers, so they need a **real sensing problem on the first page** and evidence measured on **real hardware against ground truth**. The failure this skill prevents is a technically fine paper that reads like an offline ML result, or a hardware report with no measured trade-off. ## Revision rules - **Lead with the sensing problem and its physical budget:** the phenomenon being sensed, why current sensing/processing is inadequate, the contribution (an estimator/inference method and/or a platform), the real-hardware evidence, and the energy/latency/accuracy budget that makes it deployable. - **Make the information processing load-bearing (IP track).** State the estimator, inference, or learning method precisely enough to re-implement, and tie it to a quantity that matters (error bound, joules, bits, latency) — not just "accuracy improved." - **Make the platform reusable and measured (SPOTS track).** Give the MCU/SoC, sensor, radio, and toolchain, and justify design choices with measured power, timing, and robustness — a datasheet is not a contribution. - **Pair every claim with proportional, real-hardware evidence** — a measured energy number, a ground-truth-referenced accuracy, a deployment yield — not adjectives. - **Report deployments honestly.** Yield, synchronization error, packet loss, and energy as *measured*; an idealized deployment reads as a tell. - **Respect the ≤12-page ACM two-column budget** as a design constraint; a paper that only fits by cutting the measurement setup or the limits is over-scoped. - **Maintain double-blind** in self-citations, tool/testbed names, board photos, acknowledgements, funding, and dataset links. ## Sensor-systems paper skeleton | Section | Job it must do | Common failure | |---|---|---| | Intro | Sensing problem, inadequacy, contribution, real-hardware evidence preview, budget — first page | Leads with a model/technology trend, not a sensing problem | | Background | The modality, the platform constraints, why this is hard physically | Motivation by assertion; no physical grounding | | Method / System | The estimator/inference (IP) or the platform/tool (SPOTS), reproducibly | Method too thin to re-implement; platform under-specified | | Evaluation | Each claim answered with measured, ground-truth evidence | Simulation or offline accuracy standing in for on-device/in-field results | | Energy/latency budget | Joules, memory, timing as measured on the real platform | "Feasible on embedded devices" with no numbers | | Limits / threats | Site-specificity, generalization, calibration drift, bounded | Generic paragraph untethered from this system | | Related work | Delta-first against the sensing literature | Citation catalog with no contrast | ## Sentence-level rewrites | Draft pattern | IPSN-safe rewrite | |---|---| | "Our method significantly improves accuracy." | "reduces localization error to X m (95% CI ...) vs on " | | "It is energy-efficient." | "consumes X µJ per inference on at , measured on an instrumented rail (Table 2)" | | "We deploy it in the real world." | "deployed nodes for ; packet yield Y%, sync error < Z µs (Fig. 4)" | | "Runs in real time on embedded devices." | "end-to-end latency X ms on ; fits footprint" | | "The model detects the event well." | "detection rate D at F false alarms/hour on hand-labeled field audio, per site" | ## Energy/latency/ground-truth discipline ```text [Energy] joules or µJ per operation, measured (rail/shunt/instrument named), not estimated [Latency] end-to-end timing on the real SoC/MCU at a stated clock; number of runs [Footprint] RAM/flash used vs available; where the model/pipeline had to shrink [Ground truth] the reference (labels, co-located instrument, surveyed positions) and its own error [Limits] site-specificity / calibration drift / generalization -> stated next to the result ``` ## Vignette: compressing a deployment paper A draft with a long system tour, six figures, and a thin evaluation: keep the system description at the level needed to reproduce, the two figures that carry the energy and yield story, a per-site false-alarm table, and a limits subsection; move the full protocol and secondary plots to the artifact with forward references. The test of a good cut: a reviewer should be able to answer "what was measured, on what hardware, against what ground truth, and how well did it hold up?" from the body alone. ## Output format ```text [Writing diagnosis] clear / under-motivated / over-claimed / evidence-mismatched / over-scoped [First-page fix] [Claim audit] measured evidence -> on real hardware / ground truth? yes/no> [Budget check] [Anonymity edits] ```