# Methodology The project emphasizes transparent baselines before complex models. Analysts should document the target variable, feature window, evaluation split, and uncertainty. | Component | Recommendation | |---|---| | Baseline | Start with simple ratings or historical averages. | | Features | Prefer interpretable features before adding complexity. | | Metrics | Use accuracy, log loss, Brier score, and calibration notes. | | Limitations | Explain missing data, tournament uncertainty, and model assumptions. |