{ "attributions": [ "Escala salarial del CCT 76/75 (UOCRA — CAMARCO/FAEC), según acuerdo homologado por la Secretaría de Trabajo", "Información obtenida del Portal de la Junta de Andalucía" ], "chapter": "Aislaciones > Capas aisladoras", "items": [ { "bom": [ { "factor": 1, "quantity": 0.4, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 0.25, "ref": "mo-ar-ayudante-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 0.015, "ref": "mt-ar-hidrofugo-inorganico-en-bidon-de-10-l", "role": "material" } ], "classification": { "path": [ "Aislaciones", "Capas aisladoras" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.573Z", "id": "wi-ar-azotado-hidrofugo-vertical", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 8030.22 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 8890.96 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 13726.44 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 15708.1 } ], "sources": [ { "code": "wi-ar-azotado-hidrofugo-vertical", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Azotado hidrófugo vertical", "tags": [ "azotado", "hidrófugo", "vertical" ], "text": "Azotado hidrófugo vertical de mortero de cemento 1:3 con hidrófugo inorgánico al 10 % del agua de amasado, de 1 cm de espesor, sobre paramento de mampostería, previo al revoque grueso en exteriores y locales húmedos. Medido por metro cuadrado de superficie efectivamente tratada. La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado. No se localizó rendimiento de mano de obra en ninguna fuente pública argentina para esta partida: no se carga mano de obra hasta conseguirlo. Ningún organismo público argentino publica rendimientos (los pliegos fijan la forma de medición, pero el análisis de precio lo presenta el oferente). RENDIMIENTO INCORPORADO EN SEPTIEMBRE DE 2026. Rendimiento de mano de obra transcripto de \"Coeficientes de Consumo\", material de la cátedra de Organización y Conducción de Obras de la Facultad de Ciencias Exactas y Tecnología de la Universidad Nacional de Tucumán, de descarga libre. ADVERTENCIAS DE LA FUENTE: el documento no lleva fecha ni encabezado institucional (el archivo está alojado en una carpeta de 2014 y sigue enlazado como material vigente del práctico), no declara la procedencia metodológica de sus coeficientes, y usa sólo las categorías Oficial y Ayudante, sin medio oficial. Nivel de verificación cross-check-secundario, pendiente de contraste. Corresponde al ítem \"Revoques — Azotado cementicio 2 cm\". SALVEDAD: el dosaje de la fuente no lleva hidrófugo, sólo cemento y arena, así que de ese ítem se tomó únicamente el rendimiento de mano de obra y no su composición de materiales, que en esta partida ya estaba curada con hidrófugo.", "unit": "m2", "updatedAt": "2026-09-08T09:15:59.016Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } }, { "bom": [ { "factor": 1, "quantity": 0.01, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 0.13, "ref": "mo-ar-ayudante-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 1.15, "ref": "mt-ar-film-de-polietileno-de-200-micrones", "role": "material" } ], "classification": { "path": [ "Aislaciones", "Capas aisladoras" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.574Z", "id": "wi-ar-capa-aisladora-horizontal-con-film-de-polietileno", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 2022.72 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 2195.97 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 3290.95 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 3533.82 } ], "sources": [ { "code": "wi-ar-capa-aisladora-horizontal-con-film-de-polietileno", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Capa aisladora horizontal con film de polietileno", "tags": [ "capa aisladora", "polietileno", "nylon", "barrera de vapor" ], "text": "Capa aisladora horizontal con film de polietileno de 200 micrones colocado bajo contrapiso, con solapes de 15 cm. Medida por metro cuadrado de superficie cubierta, sin descontar solapes. En obra el film se llama \"nylon\". La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado. Rendimiento de mano de obra transcripto del Análisis de Precios Unitarios del Colegio de Arquitectos de Salta (modelo CAS 3, sistema húmedo, julio 2025, publicación de descarga libre). El documento no declara la procedencia metodológica de sus rendimientos: nivel de verificación cross-check-secundario, pendiente de contraste.", "unit": "m2", "updatedAt": "2026-09-08T09:15:59.032Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } }, { "bom": [ { "factor": 1, "quantity": 0.45, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 0.45, "ref": "mo-ar-ayudante-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 0.02, "ref": "mt-ar-hidrofugo-inorganico-en-bidon-de-10-l", "role": "material" } ], "classification": { "path": [ "Aislaciones", "Capas aisladoras" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.574Z", "id": "wi-ar-capa-aisladora-tipo-cajon-en-primera-hilada", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 10906.31 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 12081.54 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 18849.77 }, { "currency": "ARS", "date": "2026-08", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 21342.77 } ], "sources": [ { "code": "wi-ar-capa-aisladora-tipo-cajon-en-primera-hilada", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Capa aisladora tipo cajón en primera hilada", "tags": [ "capa aisladora", "cajón", "hidrófugo", "ml" ], "text": "Capa aisladora tipo cajón, ejecutada con azotado hidrófugo de mortero de cemento 1:3 con hidrófugo inorgánico al 10 % del agua de amasado, envolviendo las tres caras de la primera hilada de mampostería. Medida por metro lineal de muro. \"Capa aisladora tipo cajón\" es un término argentino sin equivalente en catálogo español. La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado. Rendimiento de mano de obra transcripto del Análisis de Precios Unitarios del Colegio de Arquitectos de Salta (modelo CAS 3, sistema húmedo, julio 2025, publicación de descarga libre). El documento no declara la procedencia metodológica de sus rendimientos: nivel de verificación cross-check-secundario, pendiente de contraste.", "unit": "m", "updatedAt": "2026-09-08T09:15:59.033Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } } ], "version": "0.5.0" }