{ "attributions": [ "Escala salarial del CCT 76/75 (UOCRA — CAMARCO/FAEC), según acuerdo homologado por la Secretaría de Trabajo", "Información obtenida del Portal de la Junta de Andalucía" ], "chapter": "Estructura de hormigón armado > Estructura resistente", "items": [ { "bom": [ { "factor": 1, "quantity": 2.86, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 1.03, "ref": "mt-ar-hormigon-elaborado-h-21-puesto-en-obra", "role": "material" }, { "factor": 1, "quantity": 0.8, "ref": "mt-ar-alambre-recocido-n-16-para-atado-de-armaduras", "role": "material" } ], "classification": { "path": [ "Estructura de hormigón armado", "Estructura resistente" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.574Z", "id": "wi-ar-columna-de-hormigon-armado", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 216796.7 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 220759.34 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 241262.74 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 252639.13 } ], "sources": [ { "code": "wi-ar-columna-de-hormigon-armado", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Columna de hormigón armado", "tags": [ "columna", "hormigón armado", "hºaº", "pilar" ], "text": "Columna resistente de hormigón armado H-21, de sección rectangular o cuadrada, incluidos hormigón elaborado, armadura elaborada y colocada, encofrado de fenólico, apuntalamiento, colocación, vibrado, curado y desencofrado. Medida por volumen neto de la pieza terminada. Rendimiento de oficial transcripto del APU del Colegio de Arquitectos de Salta (julio 2025); el rendimiento de ayudante que declara ese documento (0,40 h/m3) es inconsistente con el resto de su propia tabla y NO se carga hasta contrastarlo. La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado.", "unit": "m3", "updatedAt": "2026-09-08T09:15:59.059Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } }, { "bom": [ { "factor": 1, "quantity": 2.5, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 3, "ref": "mo-ar-ayudante-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 1.03, "ref": "mt-ar-hormigon-elaborado-h-21-puesto-en-obra", "role": "material" }, { "factor": 1, "quantity": 0.8, "ref": "mt-ar-alambre-recocido-n-16-para-atado-de-armaduras", "role": "material" } ], "classification": { "path": [ "Estructura de hormigón armado", "Estructura resistente" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.574Z", "id": "wi-ar-encadenado-horizontal-de-hormigon-armado", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 244270.14 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 251412.23 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 292949.25 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 307580.34 } ], "sources": [ { "code": "wi-ar-encadenado-horizontal-de-hormigon-armado", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Encadenado horizontal de hormigón armado", "tags": [ "encadenado", "hormigón armado", "hºaº" ], "text": "Encadenado horizontal de hormigón armado H-21 sobre mampostería, incluidos hormigón elaborado, armadura elaborada y colocada, encofrado, colocación y curado. Medido por volumen neto de la pieza terminada. La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado. Rendimiento de mano de obra transcripto del Análisis de Precios Unitarios del Colegio de Arquitectos de Salta (modelo CAS 3, sistema húmedo, julio 2025, publicación de descarga libre). El documento no declara la procedencia metodológica de sus rendimientos: nivel de verificación cross-check-secundario, pendiente de contraste.", "unit": "m3", "updatedAt": "2026-09-08T09:15:59.080Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } }, { "bom": [ { "factor": 1, "quantity": 3.43, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 1.7, "ref": "mo-ar-ayudante-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 1.03, "ref": "mt-ar-hormigon-elaborado-h-21-puesto-en-obra", "role": "material" }, { "factor": 1, "quantity": 1, "ref": "mt-ar-alambre-recocido-n-16-para-atado-de-armaduras", "role": "material" } ], "classification": { "path": [ "Estructura de hormigón armado", "Estructura resistente" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.575Z", "id": "wi-ar-losa-maciza-de-hormigon-armado", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 242831.76 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 249668.5 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 287639.77 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 303939.28 } ], "sources": [ { "code": "wi-ar-losa-maciza-de-hormigon-armado", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Losa maciza de hormigón armado", "tags": [ "losa", "maciza", "hormigón armado", "hºaº" ], "text": "Losa maciza de hormigón armado H-21, incluidos hormigón elaborado, armadura elaborada y colocada, encofrado de fenólico, apuntalamiento, colocación, vibrado, curado y desencofrado. Medida por volumen neto de la pieza terminada. En Argentina se dice \"losa\": el término español \"forjado\" no se usa. La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado. Rendimiento de mano de obra transcripto del Análisis de Precios Unitarios del Colegio de Arquitectos de Salta (modelo CAS 3, sistema húmedo, julio 2025, publicación de descarga libre). El documento no declara la procedencia metodológica de sus rendimientos: nivel de verificación cross-check-secundario, pendiente de contraste.", "unit": "m3", "updatedAt": "2026-09-08T09:15:59.114Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } }, { "bom": [ { "factor": 1, "quantity": 4.2, "ref": "mo-ar-oficial-cct-76-75", "role": "labor" }, { "factor": 1, "quantity": 1.03, "ref": "mt-ar-hormigon-elaborado-h-21-puesto-en-obra", "role": "material" }, { "factor": 1, "quantity": 0.8, "ref": "mt-ar-alambre-recocido-n-16-para-atado-de-armaduras", "role": "material" } ], "classification": { "path": [ "Estructura de hormigón armado", "Estructura resistente" ] }, "country": "AR", "createdAt": "2026-09-08T09:15:32.577Z", "id": "wi-ar-viga-resistente-de-hormigon-armado", "kind": "work_item", "prices": [ { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "A" }, "source": "cerp", "sourceCode": "BOM", "value": 233592.89 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "B" }, "source": "cerp", "sourceCode": "BOM", "value": 239412.15 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C" }, "source": "cerp", "sourceCode": "BOM", "value": 269522.04 }, { "currency": "ARS", "date": "2026-09", "edition": "2026-09", "kind": "computed_from_bom", "scope": { "country": "AR", "zone": "C-AUSTRAL" }, "source": "cerp", "sourceCode": "BOM", "value": 286228.63 } ], "sources": [ { "code": "wi-ar-viga-resistente-de-hormigon-armado", "edition": "2026-09", "matchedBy": "manual", "source": "cerp" } ], "summary": "Viga resistente de hormigón armado", "tags": [ "viga", "hormigón armado", "hºaº" ], "text": "Viga resistente de hormigón armado H-21, incluidos hormigón elaborado, armadura elaborada y colocada, encofrado de fenólico, apuntalamiento, colocación, vibrado, curado y desencofrado. Medida por volumen neto de la pieza terminada. Rendimiento de oficial transcripto del APU del Colegio de Arquitectos de Salta (julio 2025); el rendimiento de ayudante que declara ese documento (0,70 h/m3) es inconsistente con el resto de su propia tabla y NO se carga hasta contrastarlo. La forma de medición es por unidad ejecutada y la forma de pago por certificado de obra mensual del rubro ejecutado.", "unit": "m3", "updatedAt": "2026-09-08T09:15:59.159Z", "verification": { "findings": [], "lastCheckedAt": "2026-09-08T09:19:43.233Z", "status": "auto_ok" } } ], "version": "0.5.0" }