--- title: "3.9.0 LTS GO/NO-GO checklist" lastUpdated: 2026-10-10 --- # 3.9.0 LTS GO/NO-GO checklist The owner's decision gate at the end of **3.8.59** (ROADMAP Phase 2): is the code that becomes the v3 LTS line (`stable/v3`, npm `latest` for the whole v4 cycle) ready to be cut as **3.9.0**? The cut itself is described in [RELEASE_CHECKLIST.md → 3.9.0 LTS cut](./RELEASE_CHECKLIST.md#390-lts-cut-rehearsed-in-3858) and the branch/channel model in [RELEASE_STRATEGY.md](./RELEASE_STRATEGY.md) and the [ROADMAP](../../ROADMAP.md) (Phase 3). How to use it: - Run every command against the **3.8.59 release tip** (or the 3.9.0 release PR), not a feature branch. "Green" means the command exits 0 with no new allowlist entry and no baseline moved upwards. - Paste the evidence (CI run URL, command output excerpt, or commit SHA) in the **Evidence** column. An empty cell is a NO-GO. - A NO-GO is not a failure of the rail: fix, re-run the row, and decide again. ## Rail gates Only the gates of the 3.8.x rail. G3–G10 belong to the v4 phases (modular platform) and are not part of the LTS decision. | Gate | What must hold | How to prove | Evidence | | ---- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | -------- | | G0 | PRs to `release/**` (the `quality.yml` lane) run the same ratchets and security gates as PRs to `main` | `Gate / Quality` green on the 3.9.0 release PR: `gh pr checks `; locally `npm run quality:ratchet` | | | G1 | `check:known-symbols` is registry-aware (no regex false negatives on registered strategies/executors) | `npm run check:known-symbols` | | | G2 | Every god-file slice left file size and quality metrics at or below baseline (no own-growth without the owner's explicit approval) | `npm run check:file-size` and `npm run quality:ratchet` on the tip; every change to `config/quality/quality-baseline.json` in the cycle (`git log -p origin/main..HEAD -- config/quality/quality-baseline.json`) lowers a number or links the owner's approval | | | G11 | omni-queue lands the release PRs: `config/merge-queue/config.json` passes omni-queue's validator (queue label, `checksTimeoutMinutes`), its `bases` manage the release branch, `mode` is `live` (shadow lands nothing), and its label exists; `--admin merge` is not used (the Mergify `release` queue G11 checked before was retired on 2026-11-19, see the `.mergify.yml` header) | `npm run release:dry-run-lts-cut -- --from ` shows `✓ merge-queue` (reads `config/merge-queue/config.json` at the tip + its label) and `✓ release-ruleset` (the `release/*` ruleset keeps `deletion` + `non_fast_forward`); no `--admin` merge in the cycle | | | G12 | `Gate / CI` and `Gate / Quality` are the required status rollups and fail when any job they need fails | `gh pr checks ` shows both rollups green; a deliberately red job on a scratch PR turns its rollup red | | | G13 | The golden sets that pinned behavior before the `combo.ts` / `chatCore.ts` decomposition still pass | `node --import tsx/esm --test tests/unit/g13-combo-chatcore-golden.test.ts tests/unit/executor-map-golden.test.ts tests/unit/provider-translate-path-golden.test.ts` | | | G14 | `no-restricted-imports` boundaries hold (no `localDb.ts` barrel import outside `src/lib/db/`, no `open-sse/executors/**` in `src/app/**`) | `npm run lint` and `node --import tsx/esm --test tests/unit/eslint-import-boundaries.test.ts` | | ## Closing battery The same battery closes every rail version; for the LTS it runs on the final tip. Run the unit and Vitest suites **twice in a row** — a flake is a NO-GO until it is explained. | # | Item | How to prove | Evidence | | --- | ----------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | -------- | | 1 | Lint and typecheck | `npm run lint && npm run typecheck:core && npm run typecheck:noimplicit:core` | | | 2 | Unit and Vitest (disjoint runners, both required) | `npm run test:unit && npm run test:vitest` (twice) | | | 3 | Coverage at or above the baseline (floor 60/60/60/60) | `npm run test:coverage && npm run quality:ratchet` | | | 4 | Cycles, file size, complexity, dead code | `npm run check:cycles:ratchet && npm run check:file-size && npm run check:complexity && npm run check:cognitive-complexity && npm run check:dead-code` | | | 5 | Known symbols, provider consistency, generators clean | `npm run check:known-symbols && npm run check:provider-consistency && npm run gen:provider-reference && git diff --exit-code docs/reference/PROVIDER_REFERENCE.md` | | | 6 | E2E provider journey and Playwright | `npm run test:integration` (includes `tests/integration/provider-journey.contract.test.ts`) and `npm run test:e2e` | | | 7 | Build and smoke of the artifact that ships | `gh workflow run preview-artifact.yml -f pr_number=` (build once, `check:pack-artifact` + `check:pack-boot`, attested), or locally `npm run build:release && npm run check:pack-artifact && npm run check:pack-boot` | | | 8 | VPS canary with live smoke (Hard Rule #18) | Deploy the attested tarball to the VPS (192.168.0.15), then `curl -fsS http://192.168.0.15:/api/monitoring/health` and one live request per critical route (`/v1/chat/completions`, `/v1/messages`, `/v1/models`) | | | 9 | CHANGELOG consolidated, cycle issues triaged | `npm run check:changelog-integrity && npm run check:docs-sync`; every issue referenced by the cycle is closed or re-pointed | | | 10 | Characterization tests still green | `node --import tsx/esm --test "tests/unit/**/*.characterization.test.ts"` | | ## Cut readiness | Item | How to prove | Evidence | | ------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ | -------- | | Release branch green | The release branch exists (`git ls-remote --heads origin ` is not empty) AND `gh issue list --repo cheaper-inference/OmniRoute --state open --search "Release branch not green: in:title"` is empty — no issue for a missing branch is not evidence | | | 3.8.58 rehearsal done and rolled back | Fork rehearsal log of `node scripts/release/dry-run-lts-cut.mjs --execute ...` and of `--execute --rollback` (see the checklist) | | | Dry-run of the real cut is READY | `npm run release:dry-run-lts-cut -- --from <3.9.0-tip>` exits 0 and prints `RESULT: READY` | | --- GO / NO-GO: ______ (owner, date)