# Message House Example: Industrial **Offering:** NFA-500 retrofit controller (Northfield Automation) **Target:** maintenance and plant engineers at mid-size discrete-manufacturing plants running aging controllers; buyers are procurement and the plant manager **Context:** successor to the NFA-200; sold through 8 partners; connected-service tier is new **Why this example exists:** industrial buyers are technical and skeptical, so the *proof hierarchy* and role variants do most of the work. It also shows the foundation as hard facts. --- ```markdown ## Draft critique (first) Pillars as submitted: "Modular I/O," "Cloud connectivity," "Compact DIN-rail form factor." All three are on the data sheet. None names an outcome. ## Message House: NFA-500 **ROOF** > Upgrade the line without stopping it. | Pillar | Outcome | Traces to | Cover test | |---|---|---|---| | 1 | Swap the old controller in a shift, not a shutdown | Pain: "we can't give up a weekend of production" (win/loss, 6 of 8 lost deals) [FROM YOU] | Passes | | 2 | Hear about a fault before production does | Gain: maintenance planners want warning, not alarms [FROM YOU] | Passes | | 3 | Keep the programs and wiring you already trust | Pain: fear of re-validating a proven process [FROM YOU] | Passes | **Proof** | Pillar | Proof | Type | Source | |---|---|---|---| | 1 | Install time at three pilot sites with bracket kit | Measured pilot | `[NEEDS SOURCE]`: site reports not collected | | 2 | Warning lead time on bearing and thermal faults | Internal test | `[NEEDS SOURCE]`: method not written down | | 3 | Program import verified against NFA-200 libraries | Internal test | Test report T-114 [FROM YOU] | **Foundation:** UL 508A listed; CE conformity per declaration [no.] `[NEEDS SOURCE]`; ~120 NFA-200 sites in service; spare parts in 6 countries; service contracts through 2028 for the NFA-200 base. **Superlatives found:** "the most reliable retrofit controller." No comparative data. Removed. ## Variants | Role | Lead pillar | Wording | |---|---|---| | Maintenance engineer | 3 | "Your programs come with you." | | Plant manager | 1 | "A shift, not a shutdown." | | Procurement | 3 and foundation | "No re-validation. Parts and service in six countries." | | Distributor | 1, plus margin | "A retrofit your customers have been asking for, with a bracket kit that keeps install time predictable." | ## Words Use: "shift not shutdown," "your programs" (plant interviews). Avoid: "next-gen," "Industry 4.0," "seamless." ## Test plan Six plant engineers from lost-deal interviews. Ask what they heard, believe, doubt. If fewer than 4 repeat "without stopping," re-cut the roof. ``` ## What to learn from this - **Pillar 3 is a pain, not a feature.** "Keep what you trust" came from lost-deal interviews, not the data sheet. - **Only one proof point is real so far.** The house says so, which tells the team what to gather before the trade fair. - **Procurement gets the same pillars,** reordered, with the foundation doing the persuading.