# Problem Statement Examples — Industrial Northfield Automation builds retrofit control systems for legacy production lines. These statements were written during NFA-500 discovery. The industrial twist: the person who feels the pain is rarely the person who signs. A problem statement written from the buyer's chair produces a cost-reduction pitch; written from the technician's chair it produces something a team can actually design against. --- ## Example 1: Good Problem Statement (NFA-500 discovery) **Problem Framing Narrative:** **I am:** A maintenance technician at a mid-sized parts manufacturer - Responsible for keeping four production lines running across two buildings - On call nights and weekends; I am the person who gets phoned at 2am - Comfortable with wiring and mechanics, less so with software and network configuration **Trying to:** - Get a stopped line running again as fast as possible, without making it worse - Know whether the fault is the controller, a sensor, the wiring, or the machine itself **But:** - The controller shows a single fault light with no indication of which input tripped - Diagnosing means pulling the panel and testing points one at a time with a meter - If I guess wrong and swap the controller, I lose two hours re-commissioning it **Because:** - The controller was designed when a fault light was the state of the art - Diagnostic information exists inside the device but was never surfaced anywhere a person can see - Nobody who designed it has ever stood at a panel at 2am with production waiting **Which makes me feel:** - Anxious — every minute of guessing is a minute the line isn't producing - Undermined — I am good at this job and the tool makes me look slow - Resentful of the "upgrade" that made diagnosis harder than the machine it replaced --- **Why this works:** - **The "because" names a design failure, not a user failure.** "Nobody who designed it has stood at a panel at 2am" is the whole insight, and it points directly at what to change. - **The feeling is specific and true to the role.** "Undermined" is the one that matters — a tool that makes a competent person look slow gets worked around, then blamed. - **It doesn't smuggle in a solution.** No mention of a display, an app, or an LED. The team stays free to solve it. - **It gives you a testable success condition** without stating one: the tech knows which input tripped without pulling the panel. --- ## Example 2: Bad Problem Statement (same situation) **Problem Framing Narrative:** **I am:** A plant operations manager **Trying to:** - Reduce unplanned downtime costs **But:** - Our controllers lack modern diagnostics **Because:** - The technology is outdated **Which makes me feel:** - Frustrated --- **What breaks:** - **Wrong person.** The operations manager experiences downtime as a number on a report. The technician experiences it as a 2am phone call and a meter in their hand. Only one of those produces design insight. - **"Lack modern diagnostics" is a solution wearing a problem's clothes.** It names an absent feature rather than a blocked job, so the team builds "diagnostics" without knowing what question the tech is actually trying to answer. - **"The technology is outdated" explains nothing.** Outdated how? The mechanical design is fine. It's the information design that fails. - **"Frustrated"** is the default emotion nobody learns anything from. - The whole thing could describe any industrial product from the last forty years — which means it describes none of them well enough to act on. --- ## Example 3: Good Problem Statement (the buyer's problem, stated honestly) The operations manager *does* have a real problem — it's just a different one, and worth writing separately rather than blending in. **I am:** A plant operations manager responsible for output on four lines **Trying to:** - Commit to delivery dates I can actually hit - Decide whether to fund a controls refresh this year or defer it again **But:** - I can't tell whether our downtime is a controls problem, a maintenance-staffing problem, or a machine-age problem - Every vendor tells me their box will fix it, and I have no way to check **Because:** - Downtime is logged as a duration and a line number, with no fault-level detail - The people who know what actually happened fix it and move on — the knowledge never reaches a system **Which makes me feel:** - Exposed — I'm defending a capital request with anecdotes - Skeptical of vendors, including the ones telling the truth --- **Why keeping these separate matters:** Blending them produces a mushy statement serving neither. Separated, they point at two different things to build — fault-level diagnostics on the unit for the technician, and downtime attribution the manager can take to a budget meeting. The second is what actually sells the first.