--- attribution: crown-copyright collection: infrastructure-project consideration: nationally-significant-infrastructure-projects dataset: infrastructure-project description: An application for a infrastructure development end-date: '' entity-maximum: '11999999999' entity-minimum: '11100000000' entry-date: '2023-09-13' fields: - field: applicant-organisation - field: decision-date - field: decision-maker - field: description - field: documentation-url - field: end-date - field: entity - field: entry-date - field: geometry - field: name - field: notes - field: organisation - field: point - field: infrastructure-project-type - field: infrastructure-project-decision - field: prefix - field: reference - field: start-date licence: ogl3 name: Infrastructure project paint-options: '' phase: beta plural: Infrastructure project prefix: '' realm: dataset replacement-dataset: '' start-date: '' themes: - development typology: geography version: 1.0 wikidata: '' wikipedia: '' --- The boundaries shown are used to inform the [Environmental Impact Assessment](https://www.gov.uk/guidance/environmental-impact-assessment) (EIA). This information is used by the [Planning Inspectorate](https://www.gov.uk/government/organisations/planning-inspectorate) (PINS) to identify the consultation bodies. These site boundaries may change.