--- name: frc-preliminary-design description: "Use for preliminary design of the whole robot: compare architectures, establish a shared top-down assembly layout, check motion and review weight and loaded-voltage budgets." --- # Preliminary design of the whole robot **Pre-read the current strategic narrative before sketching or revising the layout.** Read it end to end. Walk through the opening, repeated cycles, endgame, partner-dependent objectives and fallbacks that it calls for. Name the project narrative file in the review and record how each objective is represented, remains open, or was explicitly scoped out and why. Revisit this list at handoff. A subsystem experiment can cover a narrower question while the whole-robot review retains the other objectives. For every placed member, write its **purpose** (the job it performs) and **rationale** (the requirement, interface, constraint or tradeoff that earns it space here). Include supports, controls, game pieces and service gauges. Use its placed ID in the [review presentation](references/presentation.md) so selecting it reveals both explanations. When lifting or tipping a game piece, test retention separately from the animated path. At each change of support, project gravity into the holder frame, identify contacts that can push back, and sweep the entire piece toward a possible exit. Repeat with grip or power removed, including the worst loaded angle. Record a restraint, measured friction and preload, or an open retention finding. Use a free-piece simulation or load test to check dynamic capture, slip and release. [Contact and load evidence](../../docs/loaded-transfer.md) When a successful transfer might justify removing a part, [isolate its contribution](../../docs/preliminary-design.md#isolate-the-cause-of-a-successful-transfer) under nominal and adverse conditions. Identify which motions were imposed and where load could change the result. During preliminary design, use a top-down assembly layout. Share one moving layout, its checked clearance, complete weight estimate and loaded-voltage range before distributing detailed CAD. [Engineering detail and exit criteria for the three phases](../../docs/design-phase-detail.md) Build the review inside the season project or active iteration. Present it with the plugin's [stock preliminary design review](references/review-layout-template.md): one page for every season that reads a standardized, validated review scene. Supply the project's content as `presentation` data in the layout, not as page markup. Trace each moving group to a frame attachment, actuator, usable travel and service path before distributing its datum. Commit the project-relative launcher, local assets, data and evidence so another designer can run the same review after cloning. Keep the static review publishable from main, show the latest issue by default and preserve earlier releases at stable `?release=` links. Name and number the design: the release ID is its version, `MAJOR.MINOR`, and a short name in words stands for the architecture, given once with `stage.py 1.0 --design-name "NAME"`. The major number changes only when the team starts over or selects a different architecture, which also takes its own name. The minor number changes only when a revision is accepted as effective. Everything else is a draft: after an edit, rerun the check in the same release folder and stage the same ID, which revises the in-progress version in place and counts the draft. Drafts do not consume numbers; a new number is only for a new effective baseline or a new architecture. A design reads "NAME 1.0 · effective" and work toward the next baseline reads "NAME 1.1 · draft 3 · in progress". Use the name and version in titles, links and the README still caption. Keep an existing ID that is not a version, or [rename it cleanly](../../docs/design-publication-migration.md#rename-a-release-to-a-version). [Name and number a design](../../docs/design-publication.md#name-and-number-a-design) Preserve existing viewer controls and replay links during migration. A superseded project presentation can be issued as a labeled historical review with its known limitation and successor. Each release identifies itself as preliminary design, with a design status of in progress or effective (or, later, superseded or withdrawn). It need not be detail-ready, but it deploys only with a layout-checked receipt and a declared mission-task case that plays a represented narrative objective. Commit the release's check inputs: the project's CI reruns the layout check from them on every push. On a combined season site it stays secondary to the latest detailed design. [Publish a preliminary design release](../../docs/design-publication.md#publish-a-preliminary-design-release) Use the [presentation reference](references/presentation.md) to commission the interaction and physics checks. Start with the alliance role, scored event, reserve time and fallback. Walk one identifiable piece through approach, capture, retention, transfer, placement and reset. Include the robot's position, occupied volume, time, controls and energy. Mark the operations that can overlap and the shared resources that prevent overlap. Before detailed CAD or purchase, name the premise most likely to invalidate the role. Set a modest work budget and a measurable stop condition for one nominal and one adverse test. Record the result, make a continue, revise or start-over decision, and commit the evidence. Mark common interfaces as provisional or verified with the loads, tolerances and changed conditions that reopen them. [Worked loaded-drivetrain decision](../../docs/whole-robot-comparison.md#decide-what-to-fix-before-detailing) For a greenfield review, start from the mission, field and game-piece geometry, legal envelope and operating requirements. Establish new frame, joint and mounting datums in the preliminary layout. Carry forward an earlier CAD interface only when the project explicitly selects it and records the reason. Qualify the new design against its own motion, weight and electrical budgets. Sketch competing allocations of these functions before choosing purchased mechanisms. Use a simple baseline. Try removing a transfer, reversing a path, using passive geometry or arranging parallel functions. A change in material or supplier alone provides little architectural contrast. State what each candidate deliberately gives up. Create one editable blockout per plausible architecture in the project. Show the same drivetrain, datum, field targets, loaded mass and CG bounds, power source, wiring and service envelope. Mark the parts sharing a port, volume, current budget or driver action. Name the owner, trigger, clearance, failure behavior and recovery for each interface, including returning to a known state after servicing. After conceptual design and role selection, own the [shared package layout checkpoint](../../docs/preliminary-design.md). Resolve the active issue, fixed geometry, loaded and simultaneous motions, park and service paths before dividing detailed Fusion work among subsystem designers. Record each premise’s scenario, accepted limit, evidence, owner phase and dependent interfaces. When rollers or a lip move the payload without a rigid carrier, [declare the contact transport](../../docs/preliminary-design.md#move-a-payload-by-contact-transport) and name the trial that established its path. Reopen layout for a lost clearance. Reopen the matched field rehearsal when a changed capability violates its accepted approach, timing or height. Hold affected detailing until the current issue passes the repeat. When the held premise is a delivery position, move the scoring step in the field profile, re-run the series and [replay its stand-off](../../docs/preliminary-design.md#resume-a-held-delivery-position). Replay every attempt at the station when the held premise names no single step. For intentional squeeze, [register the compressible game piece and its contacting surface](../../docs/preliminary-design.md#game-piece-compression). Compare the measured indentation and its motion bound with the specified allowance. Keep other pairs under their existing clearance checks. Trace both the support path from each moving load to the frame and its drive path from the actuator to the load. Include the occupied shafts, bearings, carriers, stops and mounts that govern clearance. Nothing floats: every robot solid touches, or is mounted to, a solid that traces to the frame, so fix a floating solid without being asked or label it an unmounted allowance with a reason. Read the `[attachment]` section after each check and clear it. [Nothing floats](../../docs/preliminary-design.md#nothing-floats) Before fixing a mechanism footprint, choose its [attachment stock, pattern and tool side](../../docs/attachment-design.md). Sketch the signed load into the chassis, compare two placements on actual supporting members and reserve room for bracket stock, fasteners, tools and the complete removal path at the worst permitted combination of offsets. At a meaningful CAD change or saved revision, [check the intended seats, loaded mass and CG, remaining reserve and worst concurrent voltage](../../docs/fusion-design-checkpoints.md). Record the controlling case and rerun the timed route if the change consumes its margin. Select one architecture for the review handoff. Animate every mission-critical interaction on that same revision with the project’s dimensioned field fixtures, finite game pieces and applicable rule observer. Derive the motion that decides the outcome from a phase-appropriate physical model. Show the actual result and the first failed requirement. [Field interactions and physics playback](references/presentation.md#field-interactions-and-physics-playback) **Keep it a blockout, and check in before going deeper.** These are guidelines. A preliminary layout uses one solid per functional volume, about 30 to 80 solids for a whole robot. Leave out fasteners, bearings, lines and brackets unless one is the risk being examined. Answer clearance questions to about 10 mm; a tighter fit becomes a listed interface with its allowance for detailed design. Keep mass and power as estimates by subsystem with a reserve. Run physics trials on the few interactions that decide the architecture. When the work is about to refine a path or clearance tolerance below 10 mm, or the layout is about to exceed 80 solids, stop and tell the user. Agree an extended budget before continuing: what extra detail is added, which question it answers, how much time or how many cases or solids it may use, and when it stops. This makes sure the work is not getting carried away. Continue once the budget is agreed, record it under `scopeGuidelines.extendedBudget` in the layout plan and check in again before going past it. A project may state its own figures under `scopeGuidelines` in the layout plan. Declare each case's `pathToleranceMm` in its stage and read the `[scope]` line the layout check prints: it gives the solid count and the finest tolerance in use and says when a guideline is passed. [Scope guidelines and the check-in](../../docs/preliminary-design.md#keep-the-layout-a-blockout) **Keep the loop fast.** Preliminary design is quick iteration, so [size the checks to the risk](../../docs/preliminary-design.md#size-the-checks-to-the-risk). Set a time budget of about ten minutes for the whole-cycle check and for a trial campaign, and let it set the case and trial counts. Rank the risks and write down the decision each trial could change before running it. Check the whole cycle at a coarse path tolerance and refine only a phase whose clearance is thinner than that tolerance. Use one nominal run, one control and brackets that stop at the first failure on each side; change one input at a time. After an edit to names, colours, explanations or grouping, rebuild the review with `preliminary-check ... --view-only`, which reuses the saved receipt's checked cases and refuses when the design, STEP, motion, control or budgets changed. Publish each in-progress increment as a draft of the same version. **Exit criteria for marking a preliminary design effective.** Work toward all three and judge them with the report, not by eye. (1) The whole mission cycle is checked for clearance, mass and loaded voltage: every narrative stage has a passing case (acquire, retain, transfer, deliver, reset, endgame, park, service), not a fragment. (2) Every mission-critical interaction passes a physics trial with a control, sensitivity brackets (a passing and a failing value) and a timestep check, and its mission animation is driven by that named trial, not by a prescribed path. (3) Every open risk is closed by a design change or recorded as a bench test with pass and fail numbers. Physical bench results are listed verification items and are not required. Run `node scripts/design.mjs effective-readiness PROJECT` and resolve each `not met` line before proposing the status change. [What to declare and how the report reads it](../../docs/preliminary-design.md#judge-readiness-to-be-marked-effective) Once a candidate is selected, [freeze its required articles and current functions](../../docs/article-functions.md) before opening a donor assembly. Give reused parts and fasteners a current interface and a planned physical site. Hand the approved roster to CAD with the architecture decision. Run the [whole-robot comparison](../../docs/whole-robot-comparison.md) against common nominal and adverse conditions. Inspect integrated execution records and score the same external outcome. Reject an infeasible resource schedule even when its independent subsystems pass. Keep unresolved constraints visible and carry the most discriminating next experiment forward. Hand the selected assembly, rejected alternative, interface datums and measured margins to mechanism CAD and controls. Use the student’s [saved role and refinement comparison](../../docs/whole-robot-comparison.md#test-a-refinement-against-the-selected-role) when revising an architecture. Read the actual window stock and role criterion. Show the before and after piece witnesses under the same peer setup, clock and source. If a shorter bench test addresses one interface, preserve that finding alongside the open full-robot requirement. When a role relies on a partner, [compare the complete alliance service chain](../../docs/alliance-completion.md) before selecting the robot architecture. Track the same piece from finite supply through delivery and reset on the match clock. Change partner availability and inspect which design completes more cycles. For a project with `iterations/active.json`, follow its active design root before recovering older records. After a decision to start over, use `frc-start-over` to preserve the evidence and open a fresh numbered design. [Design iterations](../../docs/design-iterations.md)