WEBVTT 1 00:06:52.110 --> 00:06:53.850 Ansgar Dietrichs: Hello, hello, hello, everyone. 2 00:07:33.280 --> 00:07:38.210 Ansgar Dietrichs: I see, we already live on… the YouTube? 3 00:07:38.990 --> 00:07:40.329 Ansgar Dietrichs: Hello, Dua. 4 00:07:40.760 --> 00:07:45.089 Ansgar Dietrichs: Everyone listening? But let's give it a minute for people to come in still. 5 00:08:05.080 --> 00:08:09.560 Ansgar Dietrichs: It's so silent in here, without Justin already being on the call. 6 00:08:09.680 --> 00:08:12.460 Ansgar Dietrichs: At the beginning of the call, with a cheery good morning. 7 00:08:15.790 --> 00:08:17.020 Barnabas: Do we have music? 8 00:08:20.620 --> 00:08:24.829 Ansgar Dietrichs: If you want to share music, we don't have music on the stream or anything. 9 00:08:26.580 --> 00:08:28.190 Barnabas: I think Bendgar is covered. 10 00:08:59.930 --> 00:09:07.679 Ansgar Dietrichs: Just to check already, I would wait for a little bit longer, but do we already have Rahul on the call, who's supposed to kick us off with an update? 11 00:09:17.930 --> 00:09:19.660 Ansgar Dietrichs: Seems that we do not. 12 00:09:32.550 --> 00:09:36.800 Will Corcoran: I see him on the call. Rahul, are you able to speak? 13 00:09:38.240 --> 00:09:39.399 Rahul (EF): Yeah, hey. 14 00:09:41.020 --> 00:10:00.749 Ansgar Dietrichs: Nice, perfect. Hi, Rahul. Yeah, I think then, with that, just, you know, like, then I'll have some opening comments briefly, but I, wanted to anyway wait for people to trickle in, but I think now we have waited enough time, so… Hello, everyone, welcome to ACD 249. We're coming up on around ACD in two weeks. ACDE. 15 00:10:00.750 --> 00:10:05.880 Ansgar Dietrichs: Today, we have two… 16 00:10:06.290 --> 00:10:24.770 Ansgar Dietrichs: quite separate, but both quite impactful discussions. One of them will be on the path forward for Glamsterdam, the hard fork that is a little bit delayed right now, waiting for final decisions there, and then the other one will be for Hegota, where there's also now some questions around potential re-evaluation of the 17 00:10:24.900 --> 00:10:42.479 Ansgar Dietrichs: exact scope of the hard fork. So we will start with, Glamsterdam, and there, Rahul wanted to start with giving a quick update to what's been happening, and I think you have some slides, is that right? Or something to screen share? 18 00:10:42.840 --> 00:10:49.740 Rahul (EF): Yeah, but it's easier to just… talk, yeah, based on… 19 00:10:49.860 --> 00:10:59.590 Rahul (EF): We have reached out… so, Ethereum Foundation, Chain Security, DDOB combined have reached out to at least 50 companies that have confirmed 20 00:10:59.740 --> 00:11:06.460 Rahul (EF): impact on Glamsterdam's repricing, and I suggest mid-January. 21 00:11:06.640 --> 00:11:10.200 Rahul (EF): to be the earliest we should go live on mainnet, because… 22 00:11:10.380 --> 00:11:14.540 Rahul (EF): All of the highs and most of the mediums have said they would be ready by then. 23 00:11:15.110 --> 00:11:16.180 Rahul (EF): 4 minutes. 24 00:11:23.950 --> 00:11:26.080 Rahul (EF): And that's spec change. 25 00:11:31.510 --> 00:11:46.189 Ansgar Dietrichs: Sounds good, thank you. So then basically, yes, just to contextualize a little bit for people listening, so the, idea is that because, there were… there were… there was this kind of group of… 26 00:11:46.270 --> 00:11:58.629 Ansgar Dietrichs: Impacted contracts found relatively close to when we were already in the Glamsterdam fork rollout process with the first, testnet, already forked. The idea was to, to pause 27 00:11:58.630 --> 00:12:07.480 Ansgar Dietrichs: Wait until we have a very good understanding of both the full scope of affected, projects, but also have had time to talk with all of them. 28 00:12:07.480 --> 00:12:08.340 Ansgar Dietrichs: Mmm… 29 00:12:08.340 --> 00:12:20.669 Ansgar Dietrichs: understand, basically, like, what the ability is to react to this. That is specifically what you talked about just now, having talked to them, because one of the options forward, one of the paths forward, would be to 30 00:12:20.670 --> 00:12:34.419 Ansgar Dietrichs: continue with the rollout in the shape that the fork is as of right now, just basically at a somewhat delayed pace. We were originally looking at having the mainnet fork already in December. Now, of course, that's no longer an option, so now talking about 31 00:12:34.420 --> 00:12:53.920 Ansgar Dietrichs: January or February. As you said, mid-January is what people say is basically the very earliest by which they could be ready. Again, this is all assuming we would decide to go forward as is. There's still a discussion about potential changes to the hard fork, we can get to that in a second. But is that a fair summary? And also about, 32 00:12:54.380 --> 00:13:00.710 Ansgar Dietrichs: Can you… can you confirm that you have, basically, that there's been outreach to all of the major affected, projects? 33 00:13:01.500 --> 00:13:04.770 Rahul (EF): I confirm it's a good summary, and yeah. 34 00:13:05.030 --> 00:13:11.049 Rahul (EF): Of the three highs, all 3 have either fixed or will fix by mid-December. 35 00:13:11.270 --> 00:13:15.150 Rahul (EF): The mediums will go anywhere from next week till… 36 00:13:15.330 --> 00:13:18.809 Rahul (EF): 10th of Jan is what they've confirmed to us so far. 37 00:13:22.330 --> 00:13:30.380 Ansgar Dietrichs: Sounds good. Okay, so then, basically, I was thinking, I do want to give room 38 00:13:30.380 --> 00:13:43.749 Ansgar Dietrichs: on the call, if there is, the need for some extended discussions on… discussion on the topic, of course, but I think there was also some good, conversation on ACDT earlier in the week. 39 00:13:43.840 --> 00:14:02.980 Ansgar Dietrichs: I think the situation is quite nuanced, because there are some options for making potential changes to the hard fork. The problem is that it's a pretty nuanced trade-off space where there's no easy solution. It's not just, like, a simple oversight that could easily be fixed. It's pretty core to the nature of the fork. 40 00:14:02.980 --> 00:14:07.229 Ansgar Dietrichs: That, that, that basically some, some contracts would be affected. 41 00:14:07.230 --> 00:14:25.220 Ansgar Dietrichs: There are… there's still… there were some considerations around very minimal changes that could slightly shift, which… which projects will be… will be affected, but, the… kind of the concern is that any changes, both kind of modifying or removing the EIP, will cause quite significant delays in the rollout, and so the question is. 42 00:14:25.220 --> 00:14:32.739 Ansgar Dietrichs: And that already kind of, like, bleeds a little bit into our Heikota discussion in a second, kind of in front of this backdrop of… 43 00:14:32.770 --> 00:14:44.440 Ansgar Dietrichs: wanting to… to basically, like, start the PQ transition on the EL in particular for Ethereum relatively soon, do we have the time for such major delays for making changes? And so, the… 44 00:14:44.520 --> 00:14:54.150 Ansgar Dietrichs: intention, the hope was that we could move forward with the fork as is, just basically at a slower pace, so that people have time to mitigate. 45 00:14:54.220 --> 00:15:03.360 Ansgar Dietrichs: my intention would be, and this is basically the draft… the proposal that I would have for how we basically move forward here, is I would not want to make a decision on this today. 46 00:15:03.360 --> 00:15:16.099 Ansgar Dietrichs: Because I do think, there's still some continued conversations about this happening. What I do think is, the next step, if we were to move forward, basically the next step in the critical path would be the… 47 00:15:16.100 --> 00:15:24.109 Ansgar Dietrichs: rollout of the Hoodi test network, and so my proposal would be that we today basically pencil in a… 48 00:15:24.110 --> 00:15:34.169 Ansgar Dietrichs: a date. I was looking at the week of December 14th, which would be, like, the last, I think, responsible kind of moment this year that we could have the Hoodi fork. 49 00:15:34.520 --> 00:15:39.840 Ansgar Dietrichs: This would, of course, already, to some extent, pre-commit us to the path of actually rolling, 50 00:15:39.900 --> 00:15:54.299 Ansgar Dietrichs: glamps them out without changes. So the idea would be we would for now only pencil in the date, and then over the next two weeks, confirm that we are all actually aligned on rolling the hard fork out without changes. That means we would have two more ACDE ACDTs. 51 00:15:54.300 --> 00:16:02.919 Ansgar Dietrichs: To discuss this, we would also have time on ACDC to get an acknowledgement from the CL side as well, and then we would make the final call in two weeks on ACDE. 52 00:16:02.920 --> 00:16:18.179 Ansgar Dietrichs: the go-no-go decision, basically, for Hoodi. And then if we do… if we do go ahead with Hoodi, that would basically lock us into the path of rolling out Lambda without changes. So this would be my proposed path that would give us two more weeks to just confirm with all the stakeholders that this is an acceptable path. 53 00:16:18.370 --> 00:16:19.185 Ansgar Dietrichs: M… 54 00:16:20.170 --> 00:16:31.169 Ansgar Dietrichs: I was looking, I think, kind of like, in that week, if we wanted to retain the two-week buffer between making a final decision on a fork date and the rollout, that would mean we would have to do it 55 00:16:31.170 --> 00:16:47.610 Ansgar Dietrichs: Thursday of that week of the 14th, at the earliest, I think that's the 17th. Maybe we can do one day earlier or something to have it on a Wednesday, to have it be a bit less squished towards the end of the week or something, but I think we could pick a date offline, like a candidate date, and discuss on ACDT. 56 00:16:47.610 --> 00:16:59.430 Ansgar Dietrichs: the specific epoch and everything. But for now, I just wanted to basically ask whether people generally feel aligned on this course of action, to basically, like, try to pencil in a date and move forward. 57 00:16:59.550 --> 00:17:04.419 Ansgar Dietrichs: Or whether there's pushback, whether people would want to approach it a different way. 58 00:17:07.720 --> 00:17:10.250 Ansgar Dietrichs: So now would be the time to speak up. 59 00:17:16.530 --> 00:17:17.859 Ansgar Dietrichs: Yes, Justin? 60 00:17:19.040 --> 00:17:28.330 Justin Florentine (Besu): So, in lieu of needing more time for applications to get ready to handle it, do we not want to try to use that time to correct the spec? 61 00:17:32.460 --> 00:17:50.700 Ansgar Dietrichs: So, yeah, I forgot about this, sorry, I saw your comment on the agenda as well, with the basic position on this. I actually wanted to follow up on this. So, the problem is that correcting this back, obviously, is not… like, there is no way of going forward with the EIP that does not con… that does not 62 00:17:50.790 --> 00:18:05.830 Ansgar Dietrichs: affect the majority of those found contracts. There are some modifications that are proposed that would help a subset. I think… I don't have the exact numbers in mind, I think it's, like, 20-20%-ish, 20-30% of the affected contracts could potentially be 63 00:18:05.880 --> 00:18:22.990 Ansgar Dietrichs: be helped, but we don't know what the number would be of new affected contracts with a change mechanism, so it could be that in the end, the total number affected would actually be higher, so we could shift around the affected contracts a bit, but there is no way of fixing, basically, just because it's inherent to the, kind of, to any form of scaling. 64 00:18:22.990 --> 00:18:26.229 Ansgar Dietrichs: So then the question, yeah, that I would have for you from the BeSU side. 65 00:18:26.230 --> 00:18:34.580 Ansgar Dietrichs: Is that what you're talking about? Basically, like, is it about, like, fine… like, fine-tuning who is affected? Or are you… were you talking about something else? 66 00:18:34.580 --> 00:18:50.150 Justin Florentine (Besu): It's… yes, I think it is about that. It is about fine-tuning. So, for example, you know, I think it's… we think it's reasonable that if people are hard-coding gas pricing, that that's not something that we should, you know, that is not a form of backwards compatibility that we should be worried about. 67 00:18:50.190 --> 00:19:01.969 Justin Florentine (Besu): However, changing the gas accounting and breaking things like try, catch, and solidity is more concerning, and I do think that those developers are a little bit in a different… 68 00:19:01.980 --> 00:19:14.130 Justin Florentine (Besu): level of guilt to be mean about it. And we should maybe try a little bit harder to try and support those forms of backwards compatibility. 69 00:19:14.360 --> 00:19:24.899 Justin Florentine (Besu): I don't know if that clarifies our position here, but it does seem to me that, you know, we have a little bit of time. The time pressure that I see here. 70 00:19:25.330 --> 00:19:39.830 Justin Florentine (Besu): I understand we're trying to hit deadlines, and we're trying to get ready for PQ, but Hegota is already well underway, and we're working in parallel. And I don't know how much of Hegota actually depends on Glamsterdam, that we have to, you know. 71 00:19:39.830 --> 00:19:53.209 Justin Florentine (Besu): we have to be worried about impacting the Hegota's schedule by delaying Glamsterdam, you know, maybe a couple weeks, so we could research to try and fix this. I don't see the delay being massive. 72 00:19:53.690 --> 00:19:55.709 Justin Florentine (Besu): Does that clarify our position? 73 00:19:56.280 --> 00:20:09.259 Ansgar Dietrichs: Yeah, yeah, it does. I think that's a reasonable position. I've mostly heard otherwise, preference voice to basically move forward as is, but I think this is a reasonable alternative path, so I would ideally want to invite other 74 00:20:09.460 --> 00:20:19.669 Ansgar Dietrichs: core developers to speak up, and so that we can discuss this. I think this would be basically the primary alternative path that we could choose to go down on. 75 00:20:19.960 --> 00:20:21.409 Ansgar Dietrichs: Lukasz? 76 00:20:22.890 --> 00:20:35.030 Łukasz Rozmej: So, I proposed some changes that fixed that, like, 3 weeks ago, or even more. I don't have a preference, because I'm also, like. 77 00:20:36.770 --> 00:20:48.730 Łukasz Rozmej: understand that the timelines are not in our favor, and I'm not sure if we did all the due diligence to see what would potentially… anything else would break, right? 78 00:20:48.970 --> 00:20:52.759 Łukasz Rozmej: So, that's definitely something that is… was not… 79 00:20:53.030 --> 00:20:55.690 Łukasz Rozmej: At least I don't know if it was done. 80 00:20:55.870 --> 00:21:11.270 Łukasz Rozmej: But yeah, there is also option to leave it as is for Glamsterdam and fix it for… in Hegota, potentially, that we can also discuss, but I don't know. So those are my comments. 81 00:21:13.550 --> 00:21:32.869 Ansgar Dietrichs: Yeah, sounds good. And by the way, just to mention already, to flag it, I think on next ACDT on Monday, separately, there's also the intention to discuss, in some sense, what can we learn from how this went, not ideally here with Glampsadam, and how can we do better in the future. I also have some thoughts on this, so I think that's actually a very, very important 82 00:21:33.030 --> 00:21:36.820 Ansgar Dietrichs: topic anyway, so anyone there interested should come to the call on Monday. 83 00:21:36.970 --> 00:21:41.680 Ansgar Dietrichs: But yeah, for today, of course, the question is, what do we do with Glamsterdam itself? Luis? 84 00:21:44.550 --> 00:21:59.479 Luis Pinto: Yeah, I think especially because there is no gas opcode for states, it might be hard to kind of fix that at the language level, at solidity level. 85 00:22:00.030 --> 00:22:07.350 Luis Pinto: So, I wonder, maybe, should we consider moving the refunds to the end, at this stage? 86 00:22:07.930 --> 00:22:09.270 Luis Pinto: And, I mean… 87 00:22:09.420 --> 00:22:19.189 Luis Pinto: Of course, there's upgradeable contracts, but I think a mutability is also a good property in Ethereum. 88 00:22:20.380 --> 00:22:24.189 Luis Pinto: That, we might not want to, 89 00:22:25.450 --> 00:22:29.870 Luis Pinto: get to waste, or just, not worry about it. 90 00:22:31.510 --> 00:22:32.840 Luis Pinto: Vdf. 91 00:22:35.040 --> 00:22:41.650 Ansgar Dietrichs: Sounds good. And then, Justin, by the way, I see that you have your hand still raised, is that most… is that from the old comment, or… Okay, perfect. 92 00:22:41.770 --> 00:22:43.250 Ansgar Dietrichs: Toni, then? 93 00:22:45.040 --> 00:23:01.410 Toni Wahrstaetter: Yeah, just adding to the discussion, I think we should be very mindful with spec changes. It's, of course, not impossible to do, but as soon as we go for spec changes, there's, of course a long tail of additional analysis that needs to be done, because every spec change could, again. 94 00:23:01.510 --> 00:23:14.930 Toni Wahrstaetter: break new invariants that we are not aware of breaking yet. And if I remember correctly, at the beginning, when the spec changes from Lukas were considered, there were people already looking into potential 95 00:23:15.120 --> 00:23:21.280 Toni Wahrstaetter: Issues with those, and it feels like there were… there were already some Obvious ones. 96 00:23:21.420 --> 00:23:28.509 Toni Wahrstaetter: So I would just be very mindful with the spec change path, especially since we've just heard that most 97 00:23:28.840 --> 00:23:36.720 Toni Wahrstaetter: applications are ready by mid-January, at least, of those that we have already heard back from. 98 00:23:37.320 --> 00:23:40.650 Toni Wahrstaetter: And maybe that would be the less invasive option here. 99 00:23:45.740 --> 00:23:46.580 Ansgar Dietrichs: Yeah. 100 00:23:49.340 --> 00:23:56.379 Ansgar Dietrichs: Right. From my side, I mean, obviously, like, I don't want to steal this too much. I am a little bit concerned that any spec change, I think. 101 00:23:56.830 --> 00:24:10.589 Ansgar Dietrichs: What really is a bit dangerous is spec change and then rushing through a new rollout with these changed specs, because then we, in some sense, at very risk of repeating the glamps-up mistakes of not finding out, or finding out too late that new contracts are affected. 102 00:24:11.050 --> 00:24:11.820 Ansgar Dietrichs: M… 103 00:24:13.080 --> 00:24:28.540 Ansgar Dietrichs: But yeah, so, I mean, I… but I do… I mean, it does sound like there's at least, like, a significant amount of people that are not yet convinced that we should go ahead with Glamsterdam without changes, let me put it this way. We've had three separate people speak up. And then my question would be… 104 00:24:28.540 --> 00:24:33.139 Ansgar Dietrichs: about next steps, though. Like, my thinking was by penciling in Hoodi, we would… 105 00:24:33.950 --> 00:24:37.860 Ansgar Dietrichs: Give us two more weeks to just make the decision, and then we can just… there's no cost in… 106 00:24:38.010 --> 00:24:50.939 Ansgar Dietrichs: deciding to not go ahead with Hoodi, right, this year? Like, we would just not do the releases, so it's not the same as, like, the initial emergency cancellation of the Hoodi fork. We would basically just wait with the decision of even making the releases. 107 00:24:50.940 --> 00:25:14.569 Ansgar Dietrichs: That way we still have the option. If in two weeks we feel we have the confidence that we actually don't want to make changes, we still have the option to get it out this year, and then have full flexibility for timing next year. I personally think this could be a good way to do, just to leave us the option open, and then over the next two weeks, for example, we could also say we have a specific short-term workstream to try to, like, come up with a specific candidate change to the EIP. 108 00:25:14.570 --> 00:25:21.660 Ansgar Dietrichs: That we could then have a look at and say, what would be the complexity, what would be the impact analysis, is this worth doing or not? 109 00:25:21.680 --> 00:25:35.010 Ansgar Dietrichs: So my idea, my proposal would be to still basically go ahead with this penciling in of a unchanged Hoodi fork date, but yeah, I would be curious how people feel about this. Lukasz? 110 00:25:36.800 --> 00:25:39.600 Łukasz Rozmej: So for me, what would be… 111 00:25:40.070 --> 00:25:59.879 Łukasz Rozmej: very useful, is to do a bit of analysis on some proposed spaces. Like Toni said, there was a bit, but I didn't remember reading any write-up on it. So, having a better picture, what would be pros and cons of doing the spec changes. So, pros are pretty… 112 00:25:59.880 --> 00:26:14.679 Łukasz Rozmej: self-explanatory from the… what the spec change tries to achieve, but I would definitely like to have a better view of the cons and potential breaking of other things, some write-up around it on the… 113 00:26:14.680 --> 00:26:20.889 Łukasz Rozmej: Most consider spec changes, that would give us the full picture, which 114 00:26:21.040 --> 00:26:23.889 Łukasz Rozmej: there is this blind spot that I currently have. 115 00:26:29.650 --> 00:26:34.650 Ansgar Dietrichs: Yeah, so I think that is a good question, like, how do we basically concretely structure the work, 116 00:26:34.770 --> 00:26:40.260 Ansgar Dietrichs: over these next two weeks to… or, like, over the next week to come to a final decision. Let's… yeah, Ivan? 117 00:26:41.720 --> 00:26:56.759 Iván | ethrex: Thank you, Ansar. Just wanted to point out that I agree with Barnabas' comment in the chat. I think two weeks from now, for a decision on Hoodi would be too late. I think it would be better to take that decision in ACDC. 118 00:27:06.700 --> 00:27:18.180 Ansgar Dietrichs: Yeah, I'm not necessarily comfortable pushing this decision onto Ben, and the… I mean, Ben, you know, you're on the call, maybe you can speak up, like, just because this obviously, like, requires a lot of context, like, that would mean we'd have to invite all the… 119 00:27:18.180 --> 00:27:29.319 Ansgar Dietrichs: EL quote Devs to come on to next ACDC call if we want to make a decision there. We could also otherwise pick, say, if… I don't know, middle ground could be the ACDT call in between, so in 10 days or something. 120 00:27:29.320 --> 00:27:35.070 Ansgar Dietrichs: Mmm… But yeah, okay, I'm… it's a reasonable point. Dragan? 121 00:27:36.930 --> 00:27:40.110 Dragan Rakita: Hello. In general, my… 122 00:27:40.320 --> 00:27:48.780 Dragan Rakita: My point is, we don't have a silver bullet for any kind of two-dimensional gas that we want to introduce. 123 00:27:49.340 --> 00:27:57.370 Dragan Rakita: So any kind of change is going to break some kind of contract from the past, and that's not something that we can 124 00:27:57.620 --> 00:27:58.370 Dragan Rakita: Skip. 125 00:27:59.330 --> 00:28:01.810 Dragan Rakita: It sucks, but it's there. 126 00:28:02.060 --> 00:28:08.599 Dragan Rakita: But because of that, I think we should lean on shipping the current spec, it's good enough. 127 00:28:09.500 --> 00:28:20.930 Dragan Rakita: Because any kind of changes we want to introduce is going to introduce delays, and not or any gains from the specification side, from the protocol side. 128 00:28:21.870 --> 00:28:26.819 Dragan Rakita: Additionally, what I would like to see are… 129 00:28:27.700 --> 00:28:34.059 Dragan Rakita: We need to think about these kind of changes in the future, because this is not going to be the last one. 130 00:28:34.360 --> 00:28:40.840 Dragan Rakita: What I would like to see in the future is to have a list of the guidelines. 131 00:28:41.180 --> 00:28:50.680 Dragan Rakita: to think about patterns or templates that Solidity or the developers use, and make… proper, or… 132 00:28:50.900 --> 00:28:56.029 Dragan Rakita: Core developer-approved patterns that they can reuse throughout the code. 133 00:28:56.200 --> 00:28:59.249 Dragan Rakita: And be assured that those patterns are not going to break. 134 00:28:59.900 --> 00:29:08.809 Dragan Rakita: For example, gas observability of any kind is going to be broken probably multiple times in the future. This is not something that we can… 135 00:29:09.070 --> 00:29:17.029 Dragan Rakita: We can change, because different constraints are going to… make us To change the gas constants. 136 00:29:17.920 --> 00:29:28.840 Dragan Rakita: So having pattern that allows you to limit amount of gas, but not access that hard-coded value is going to be a lot easier for the… anybody to use. 137 00:29:29.770 --> 00:29:33.179 Dragan Rakita: So yeah, in general, I think we should ship 8.7 as is. 138 00:29:33.920 --> 00:29:35.649 Dragan Rakita: And, yeah, that's it. 139 00:29:37.370 --> 00:29:38.100 Ansgar Dietrichs: Thank you. 140 00:29:38.310 --> 00:29:57.860 Ansgar Dietrichs: I have a question for those people in favor of taking seriously these ideas of making small modifications. What I'm a little bit worried about is timelines here, in the sense that it took us 4 weeks, even after the auditors had already flagged these extra class of vulnerabilities, to do a proper second round of impact analysis. 141 00:29:58.340 --> 00:30:12.180 Ansgar Dietrichs: I'm a bit worried that, like, say, if we have a candidate change, I mean, for one, it will take us probably, like, say, a week or two to have a candidate, a specific agreed-upon candidate change to the EIP, and then I would expect another 4 weeks or so of impact analysis, so… 142 00:30:12.530 --> 00:30:23.950 Ansgar Dietrichs: what is the information basis that we want to make the decision for Hoodi on, basically? Like, I don't think by the time we can maybe lock in the decision, like, in a week or in two weeks, I don't think we will know. 143 00:30:24.030 --> 00:30:32.869 Ansgar Dietrichs: what, say, an alternative change would mean in terms of impacted contracts, so we will have to make that decision under uncertainty. 144 00:30:35.450 --> 00:30:37.479 Ansgar Dietrichs: Does it mean that just… 145 00:30:37.910 --> 00:30:43.580 Ansgar Dietrichs: The Hoodi this year is completely out of the question, because we just want to wait until we have all of this analyzed, and so we… 146 00:30:44.260 --> 00:30:48.200 Ansgar Dietrichs: Basically, like, wait… Until we have that? 147 00:30:48.540 --> 00:30:57.419 Ansgar Dietrichs: Data, like, mid… mid-January or something, and then… and then, basically, will we end up 148 00:30:57.830 --> 00:31:01.009 Ansgar Dietrichs: What will change between now and when we have to make a decision? 149 00:31:18.320 --> 00:31:19.040 Ansgar Dietrichs: Maureen. 150 00:31:20.460 --> 00:31:31.419 Mario Vega: Yeah, I feel like, it seems like we… having a spec change at this point looks like a better option to somebody, but I feel like we are reacting on incomplete information. 151 00:31:32.050 --> 00:31:37.419 Mario Vega: Right? So, we are… on new spec changes, we are at the spot where we were 152 00:31:37.720 --> 00:31:56.849 Mario Vega: months ago, right? So, what's gonna happen a few weeks ago if we decided to go with inspections, when we realized we didn't have enough information and this new option is worse, right? Just because we acted on incomplete information. I think this is… this is a dangerous route that we are planning to take, so… 153 00:31:56.980 --> 00:32:07.969 Mario Vega: Yeah, it's true that we don't have the full analysis of the other situations, but I don't feel like, we should wait on them, in my opinion. That's just my opinion. 154 00:32:16.030 --> 00:32:17.040 Ansgar Dietrichs: And Marius? 155 00:32:17.990 --> 00:32:20.270 Marius van der Wijden: Hmm. Yeah, so I think the… 156 00:32:20.750 --> 00:32:28.200 Marius van der Wijden: there's… there's a few spec changes that we have considered, right? I think the… one… 157 00:32:28.390 --> 00:32:34.620 Marius van der Wijden: That is the most likely is to remove the… or, like, the… 158 00:32:34.760 --> 00:32:39.620 Marius van der Wijden: the most voted for, I would say, is to remove the refunds within the transaction. 159 00:32:39.860 --> 00:32:43.180 Marius van der Wijden: And just to… Kind of give… 160 00:32:43.660 --> 00:32:53.670 Marius van der Wijden: An idea why this is not a great change is, right now, with the current gas, you can do about 160 state rides 161 00:32:53.840 --> 00:32:55.910 Marius van der Wijden: Per transaction. 162 00:32:56.720 --> 00:32:59.059 Marius van der Wijden: In the 16 million gas limit. 163 00:32:59.190 --> 00:33:05.360 Marius van der Wijden: So, if we… if you have a… if you only do the refunds at the end of the transaction. 164 00:33:05.710 --> 00:33:14.790 Marius van der Wijden: You would need to massively increase the amount of gas that you send to a contract, because you're not getting gas back if you are 165 00:33:15.190 --> 00:33:17.440 Marius van der Wijden: Refunding the, 166 00:33:17.910 --> 00:33:28.380 Marius van der Wijden: the, the state inside of the transaction. So if you are writing a bunch of slots and then clearing them again, you will only get the refund at the end of the transaction. 167 00:33:28.590 --> 00:33:38.229 Marius van der Wijden: And, there's different ways of doing that. You can either give the full refund, or you can only give 80% of the refund. 168 00:33:38.390 --> 00:33:44.149 Marius van der Wijden: That, again, has, has other… Other problems, but… 169 00:33:45.160 --> 00:33:58.770 Marius van der Wijden: what we would be breaking is the invariant that if you have… if you do some storage, and then you clear storage, you get something back within… within the transaction call. And there's a bunch of contracts that 170 00:33:59.080 --> 00:34:04.390 Marius van der Wijden: Rely on that behavior, because they are setting a bunch and clearing a bunch of storage. 171 00:34:04.500 --> 00:34:11.589 Marius van der Wijden: So, yeah, I think… That is, like, kind of the intuition why this, which is, like, the… 172 00:34:11.730 --> 00:34:19.150 Marius van der Wijden: From my opinion, this is, like, the most re… would be the most reasonable change to do to the spec, but even that has… 173 00:34:20.139 --> 00:34:20.880 Marius van der Wijden: Yeah. 174 00:34:21.060 --> 00:34:23.159 Marius van der Wijden: Significant drawbacks. 175 00:34:23.310 --> 00:34:27.429 Marius van der Wijden: That we don't fully understand yet. 176 00:34:27.590 --> 00:34:32.399 Marius van der Wijden: That is why we… kind of… said that… 177 00:34:33.760 --> 00:34:36.580 Marius van der Wijden: We would like to just keep the spec as is. 178 00:34:45.949 --> 00:34:49.299 Ansgar Dietrichs: Thank you. Yeah. 179 00:34:50.149 --> 00:34:51.119 Ansgar Dietrichs: So… 180 00:34:52.589 --> 00:35:04.299 Ansgar Dietrichs: I mean, while I think the situation is a bit unclear in terms of what actually we will do here, but in some sense, at least the decision-making process is in some sense relatively simple. Like. 181 00:35:04.889 --> 00:35:22.469 Ansgar Dietrichs: there really is only two paths. There's the path where we wait until we fully understand a candidate change, with all of its implications and whatnot. This will take until January, and we basically then make the assessment. We might still then go ahead with the old version of Glamsterdam, just… 182 00:35:22.469 --> 00:35:32.099 Ansgar Dietrichs: basically, like, from that point onwards, then doing Hoodi, then doing mainnet, so then we are basically, like, looking at late February, maybe early March for mainnet. Or potentially, at that point, then. 183 00:35:32.189 --> 00:35:39.179 Ansgar Dietrichs: committing to changes, which would then result in, like, a April or May mainnet rollout. 184 00:35:41.439 --> 00:35:59.179 Ansgar Dietrichs: So that's… that's one version, where we basically wait until January to make these decisions. The only alternative path for this is one where we, within the next one or two weeks, agree that there's just too much uncertainty down that other path, and we will just go ahead with the Glamsterdam shape as is, and… 185 00:35:59.479 --> 00:36:05.209 Ansgar Dietrichs: and basically then still do Hoodi this year, so that the delays can be limited. 186 00:36:05.339 --> 00:36:10.139 Ansgar Dietrichs: In that sense, we don't lose anything if we… 187 00:36:11.099 --> 00:36:21.519 Ansgar Dietrichs: If we for now, continue on that path, because, you know, that means that in a week, or depending on what day we choose as the decision point for this branch. 188 00:36:21.679 --> 00:36:28.949 Ansgar Dietrichs: we can still then always choose to say, okay, no, let's… let's wait until January, but at least that way we keep our option open. So I think… 189 00:36:29.189 --> 00:36:30.369 Ansgar Dietrichs: That seems like… 190 00:36:30.909 --> 00:36:50.509 Ansgar Dietrichs: for now, just the approach to take. So, as in, we pick now what day we will make the decision on a potential Hoodi this year still. So, is that next ACDC, or is that next the ACDT after, or the ACDE after? So we have to agree on that date, and then we will see. And then we will, at that point, then decide whether to 191 00:36:50.689 --> 00:36:52.589 Ansgar Dietrichs: basically wait until January or not. 192 00:36:52.759 --> 00:37:05.169 Ansgar Dietrichs: So in that sense, I think the decision here is pretty simple. The more important question is, how do we make sure that work happens now at the fastest possible pace that allows us to then make that decision once we get to that point? 193 00:37:05.169 --> 00:37:13.179 Ansgar Dietrichs: That is a little bit more unclear. I worry that, by default, we will just be in the same position next week, and maybe even in the same position in January. 194 00:37:13.199 --> 00:37:24.259 Ansgar Dietrichs: So… yeah, my prompt would be a little bit, A, does it make sense? Then we need to just pick. I mean, it seemed like maybe people were actually leaning towards ACDC next week as this decision point. 195 00:37:24.359 --> 00:37:32.529 Ansgar Dietrichs: But also, how do we make sure that actually we move forward with at least exploring, seriously, aspect change? 196 00:37:33.599 --> 00:37:38.179 Ansgar Dietrichs: So, do we have… People that want to speak up on this? 197 00:37:48.149 --> 00:37:58.399 Ansgar Dietrichs: And by the way, like, I would also ask, is there anyone who'd be, basically, who'd be strongly in favor of already today saying, definitely new Hoodi this year, we will definitely wait until January? 198 00:37:58.399 --> 00:38:09.389 Ansgar Dietrichs: That, of course, would be the alternative. I don't see why we would need to already pre-commit to this today, why we couldn't wait for a week, but… but yeah, that would be the one prompt that I would have for anyone that wants to have that opinion. Barnabas? 199 00:38:11.880 --> 00:38:16.270 Barnabas: Yeah, so I would actually push to try to make a decision about this today. 200 00:38:16.620 --> 00:38:30.280 Barnabas: Because, we haven't heard any concrete proposals for spec change. We have, had, at this point, multiple weeks, close to a month, since the first issues, were raised. 201 00:38:30.460 --> 00:38:36.569 Barnabas: Lots of people are maybe not sold, or a couple of people might not be fully sold on, 202 00:38:37.010 --> 00:38:44.299 Barnabas: I'm sticking to this spec, but yeah, I just haven't heard any… Alternative proposals that, 203 00:38:45.040 --> 00:38:49.500 Barnabas: There are multiple people are pushing for, so… No. 204 00:38:55.350 --> 00:38:56.020 Ansgar Dietrichs: Yeah. 205 00:38:56.130 --> 00:38:59.510 Ansgar Dietrichs: Mmm… I… 206 00:38:59.720 --> 00:39:04.799 Ansgar Dietrichs: I think the only blocker there would be that, so far it didn't seem like we had… 207 00:39:05.100 --> 00:39:17.930 Ansgar Dietrichs: rough consensus among EL Devs to drop the expiration of spec changes and commit to going ahead as is. So, I think we would need to reach rough consensus if we wanted to lock that in already. 208 00:39:18.730 --> 00:39:19.830 Ansgar Dietrichs: Rahul? 209 00:39:21.810 --> 00:39:28.109 Rahul (EF): a non-technical input. A lot of apps have asked Hoodi dates and signaled that 210 00:39:28.370 --> 00:39:31.110 Rahul (EF): They would prioritize a bunch of their fixes. 211 00:39:31.440 --> 00:39:33.840 Rahul (EF): Based on when they find out Hoodi will happen. 212 00:39:34.100 --> 00:39:37.380 Rahul (EF): So the sooner… We can do that, the better. 213 00:39:42.960 --> 00:39:44.460 Barnabas: Yeah, maybe we can do a poll. 214 00:39:44.800 --> 00:39:46.420 Barnabas: like, Rahul suggested. 215 00:39:48.580 --> 00:39:51.629 Ansgar Dietrichs: I don't know if a poll… Let me show. 216 00:39:52.160 --> 00:39:53.600 Ansgar Dietrichs: If people want to do a poll. 217 00:39:55.080 --> 00:40:09.409 Ansgar Dietrichs: I think, in the meantime, I would… could we have someone from each client team briefly just voice their preferred path forward here? I think that would be really helpful. So I'll just go through. Do we have someone from GetH that could speak up on… 218 00:40:09.830 --> 00:40:13.190 Ansgar Dietrichs: What your preferred course of action would be right now? 219 00:40:19.170 --> 00:40:23.649 Marius van der Wijden: I… I only joined in the last 10 minutes. 220 00:40:23.900 --> 00:40:30.579 Marius van der Wijden: So I didn't get the full, discussion, but my preferred action would be to pencil in Hoodi. 221 00:40:30.820 --> 00:40:37.100 Marius van der Wijden: And, make sure we are not pushing timelines too much further out. 222 00:40:40.160 --> 00:40:48.009 Ansgar Dietrichs: Okay, thank you. Then, do we have someone from Besu? I mean, Justin, maybe? To give your latest, take? 223 00:40:48.280 --> 00:40:53.140 Justin Florentine (Besu): Yeah, I mean, if we're not making changes to the spec, there's no reason not to just schedule today. 224 00:40:56.920 --> 00:40:59.659 Ansgar Dietrichs: And you would, in principle, be… be okay with that? 225 00:41:01.520 --> 00:41:05.219 Justin Florentine (Besu): I mean, we still think that we should change the spec, but, like, you know… 226 00:41:05.590 --> 00:41:09.090 Justin Florentine (Besu): Doesn't seem like anybody else does, so that's… that's just the way it is. 227 00:41:09.660 --> 00:41:13.330 Justin Florentine (Besu): We're gonna, we're gonna, we're gonna continue doing what we always do. 228 00:41:18.300 --> 00:41:20.280 Ansgar Dietrichs: Sounds good. Then Nethermind. 229 00:41:23.130 --> 00:41:32.709 Łukasz Rozmej: We are fine scheduling. If someone would still want to do more analysis on that, we probably will… 230 00:41:33.290 --> 00:41:45.590 Łukasz Rozmej: I will focus a bit on that too, but if someone else has time, effort, and more expertise than me, yeah, that would be great to have a confirmation in two weeks that this is the correct stuff, but we are fine with scheduling. 231 00:41:48.250 --> 00:41:49.030 Ansgar Dietrichs: breath. 232 00:41:50.820 --> 00:41:52.060 Dragan Rakita: Can't schedule it. 233 00:41:52.310 --> 00:41:53.010 Dragan Rakita: Support. 234 00:41:54.250 --> 00:41:55.520 Ansgar Dietrichs: And ethrex? 235 00:41:57.320 --> 00:42:00.790 Iván | ethrex: Scheduling now, and no spec changes. 236 00:42:02.680 --> 00:42:11.220 Ansgar Dietrichs: Okay, then that does sound a bit, clearer in terms of rough consensus than I expected. That's… that's helpful. Then I do think, 237 00:42:11.830 --> 00:42:17.239 Ansgar Dietrichs: Obviously, there's some gradations of, oh, sorry, sorry, sorry, sorry, I'm so sorry. Erigon? 238 00:42:17.950 --> 00:42:27.850 Andrew Ashikhmin: Yeah, sorry, so, it's probably, like, I would really spend some effort on trying to… 239 00:42:28.270 --> 00:42:36.790 Andrew Ashikhmin: Make some spec changes to avoid breaking contracts that, I relate, 240 00:42:37.270 --> 00:42:43.019 Andrew Ashikhmin: relied on the invariants were breaking. I concur with the… 241 00:42:43.200 --> 00:42:51.910 Andrew Ashikhmin: I think that we are working on Hegota in parallel, so it should not delay Hegota much, so I think it's better 242 00:42:52.070 --> 00:43:03.889 Andrew Ashikhmin: to… You know, to preserve… As much as smart contract immutability as possible, rather than rush glimpse to them. 243 00:43:04.010 --> 00:43:04.730 Andrew Ashikhmin: No. 244 00:43:07.300 --> 00:43:12.559 Ansgar Dietrichs: Okay, well, then we're a bit back to less… less rough consensus. Ben, you have your end up as well? 245 00:43:13.040 --> 00:43:17.560 Ben Edgington: Just to note that there is in play a potential small change. 246 00:43:17.840 --> 00:43:29.169 Ben Edgington: a consensus-breaking change on the consensus layer, so I guess we might reserve the right to… to veto a Hoodi date, depending on that. Okay, Potuz says it's not small. 247 00:43:29.190 --> 00:43:41.680 Ben Edgington: So, yeah, I guess we discuss it next week, but whatever we decide today, it might get vetoed by, Consensus-layer next week. We'll have to see. 248 00:43:45.840 --> 00:43:48.660 Ansgar Dietrichs: I see. Okay. 249 00:43:50.490 --> 00:44:04.230 Ansgar Dietrichs: Yeah, but this is why I don't think decision today makes sense, anyway, that's why I think I'm back to penciling in. I know the penciling in is not great, because it doesn't give people full clarity. It did seem like… 250 00:44:05.390 --> 00:44:27.909 Ansgar Dietrichs: So, I would just… I understand not everyone loves this idea of the penciling in, because it's not full… it's not the full certainty of a full decision, but it's also maybe too much of a bias for people that want to open-endedly explore, so… but I think it strikes a good balance, because we did seem to have a majority opinion among client devs to just schedule now and move forward, but then we had Erigon speaking out against, and we had… 251 00:44:27.910 --> 00:44:44.520 Ansgar Dietrichs: Besu, at least, not, not super excited about that path, and we also, had been cautioning that there's at least some uncertainty still on the CL side as well. So my feeling is, all these factors taken into consideration, I think it would make sense if we say that we… 252 00:44:44.520 --> 00:44:49.570 Ansgar Dietrichs: Indicate… we basically have the intention to try to make a… 253 00:44:49.570 --> 00:45:07.719 Ansgar Dietrichs: Hoodi fork happen in the week of December the 14th, so I think that would be realistically December 16th or 17th, so some Wednesday or Thursday. And we make that decision in one week on ACDC, meaning that also everyone from the EL side, who 254 00:45:07.720 --> 00:45:16.819 Ansgar Dietrichs: would want to participate in a decision should be on that call. And in particular, I would say that's also an open call for anyone who is still 255 00:45:17.070 --> 00:45:21.600 Ansgar Dietrichs: Very much of the opinion that a spec change would be the right approach. 256 00:45:21.600 --> 00:45:38.439 Ansgar Dietrichs: to have a bit of a mini-sprint between now and next week. I think, to the extent that you could present a specific change that has widespread buy-in by the various core devs, that indeed it is mature, and already has, say, a 257 00:45:38.460 --> 00:45:48.020 Ansgar Dietrichs: actual, kind of, responsible amount of impact analysis behind it that shows that it would not, cause new issues. 258 00:45:48.020 --> 00:46:03.660 Ansgar Dietrichs: maybe with some auditor takes or something. I know this is a very tight timeline, but I think to the extent that you could basically create arguments for that a spec change would be realistic, I think now would be your opportunity to basically do that over the next week. Is that something that everyone feels okay with as a compromise? 259 00:46:04.220 --> 00:46:07.179 Ansgar Dietrichs: Leaving it at this, and moving forward now. 260 00:46:18.660 --> 00:46:24.820 Ansgar Dietrichs: I didn't necessarily see enthusiasm, but I would, just basically stick with this unless someone actively speaks up to Vito. 261 00:46:29.150 --> 00:46:44.330 Ansgar Dietrichs: Okay, so then the idea would be that next week on ACDC, there will be a decision on whether we will have a Hoodi fork this year still, which would then lock us in on the path of making no spec changes, 262 00:46:44.770 --> 00:46:49.110 Ansgar Dietrichs: And anyone from the ACDE side that wants to participate in this should be on that call. 263 00:46:52.350 --> 00:46:55.430 Ansgar Dietrichs: Mmm… And… 264 00:46:59.400 --> 00:47:00.430 Ansgar Dietrichs: Sounds good. 265 00:47:00.830 --> 00:47:05.879 Ansgar Dietrichs: Okay. Then I would leave the Lambda portion of the call at this. 266 00:47:06.070 --> 00:47:10.409 Ansgar Dietrichs: Anything, any last words regarding Lambda that someone wants to bring up? 267 00:47:16.990 --> 00:47:24.110 Ansgar Dietrichs: And maybe just as a last comment, you know, I think this is, of course, not ideal, that something like this happens so late into a fork process. 268 00:47:24.110 --> 00:47:37.269 Ansgar Dietrichs: also for all the app developers affected, and everyone, I think thank you very much for your patience working through this with us together, and again, please open invite next week's ACDT to discuss how we can make sure that future hard folks will 269 00:47:37.270 --> 00:47:42.009 Ansgar Dietrichs: run smoother. I think we owe that to the community and to everyone. 270 00:47:42.650 --> 00:48:00.340 Ansgar Dietrichs: Okay, then with that, that's the first half of the call done. Now we go into Hegota discussion. So there, specifically, the context is, most people will already be aware, especially, say, for example, if you were either in person at DEF CON, 271 00:48:00.340 --> 00:48:05.449 Ansgar Dietrichs: in… at the CodeF events, or you attended last week's 272 00:48:05.450 --> 00:48:22.519 Ansgar Dietrichs: ACDC, where Ben and Will gave a bit of a recap. So the idea, basically, is that there was quite a bit of discussion at DEF CON around the timelines of post-quantum, and in particular, any potential concerns we might have around 273 00:48:22.520 --> 00:48:39.959 Ansgar Dietrichs: AI math capabilities, maybe potentially down the road, weakening some of the mathematical underpinnings of our current free PQ, cryptography, and so there's some desire to basically just accelerate the PQ timelines. 274 00:48:39.960 --> 00:48:54.400 Ansgar Dietrichs: there is already an active discussion ongoing on the CL side, what that would mean, what that will mean, how to rearrange the fork scheduling. And now the question is on the ACDE side as well. 275 00:48:54.420 --> 00:48:55.200 Ansgar Dietrichs: what… 276 00:48:55.360 --> 00:49:03.670 Ansgar Dietrichs: implications, if any, does that have for how we want to approach Hegota? The good news is that, on the EL side, the 277 00:49:03.670 --> 00:49:20.809 Ansgar Dietrichs: scope of, like, the range of potential options that we have is more limited. We already are anyway working towards frames as the centerpiece of our next hard fork, which is the PQ platform that we're choosing to use. So in some sense, it's mostly about, like, how much can we do to potentially accelerate that. 278 00:49:20.910 --> 00:49:32.970 Ansgar Dietrichs: So that's the discussion I would want to start with. I actually, had a slide prepared. I don't know, Marc, could you share your screen with that slide? 279 00:49:34.640 --> 00:49:35.789 marc | wolovim: Yep, just a moment. 280 00:49:44.660 --> 00:49:52.989 Ansgar Dietrichs: So, I was trying to follow a little bit, Ben's template from last week, of basically these, like, DEF CON levels of, 281 00:49:53.490 --> 00:49:55.350 Ansgar Dietrichs: Of… 282 00:49:55.350 --> 00:50:14.790 Ansgar Dietrichs: of urgency, of basically, like, depending on how urgent we think the situation is, we could take any of these rungs. Of course, this is just my attempt of sketching out different levels of reaction. In the end, we can choose something in between, or otherwise different, but I think this is a good decision basis, or, like, a discussion basis. 283 00:50:14.790 --> 00:50:22.080 Ansgar Dietrichs: And one last thing there is, a topic that comes up in this context as well is FOCIL, because FOCIL, of course, is 284 00:50:22.080 --> 00:50:30.529 Ansgar Dietrichs: the headliner on the CL side for Hegota, but it's at the same time not directly PQ-related, so there is some conversation around delaying it, potentially. 285 00:50:30.530 --> 00:50:48.880 Ansgar Dietrichs: I wanted to say it's totally fine for this to be part of our discussion here, but the decision-making process for FOCIL regarding Hegota will happen on the EL side. So, specifically, I would want to invite all the EL Devs to participate in that, so for the next two EL calls, so the one in one week and the one in three weeks. 286 00:50:48.880 --> 00:51:01.339 Ansgar Dietrichs: this is when there's the exploration of whether there should be changes to how we approach the shipping of FOCIL. Given that it affects both layers, please do participate in the next two ACDC calls as well. 287 00:51:01.370 --> 00:51:07.419 Ansgar Dietrichs: So, but for today, I wanted to… I think the decision that we need to do separately on our side is basically, like, how do we approach 288 00:51:07.740 --> 00:51:24.640 Ansgar Dietrichs: the EL scope, as a reminder, I think… I forget the exact number now, but I think we have, like, 19 or so, CFI'd or SFI EIPs on the EL side. That's, of course, a very, very big number. And so the question is, should we try to be… 289 00:51:24.670 --> 00:51:33.539 Ansgar Dietrichs: somewhat disciplined, restrictive in how many of those we end up SFI and shipping in the fork as a response. So the five levels that I prepared here would be just to briefly go through them. 290 00:51:33.540 --> 00:51:53.709 Ansgar Dietrichs: The simplest one, from bottom to top, the normal scope would be we just don't make any changes, we ship the normal amount, whatever that means, 10 to 15 EIPs out of those 20, maybe. Normal fork. Smaller scope would mean we are just more disciplined, we try to keep it low, but, you know, so meaning, like, maybe we are under 10 EIPs total. 291 00:51:53.710 --> 00:51:54.650 Ansgar Dietrichs: M… 292 00:51:54.770 --> 00:52:13.239 Ansgar Dietrichs: the next more restrictive step would be limiting ourselves to mostly the core frames bundle, so that is frames plus recent routes, plus, like, the other, kind of, core frames EIPs, and little to nothing else. 293 00:52:13.240 --> 00:52:14.859 Ansgar Dietrichs: The most… 294 00:52:15.620 --> 00:52:28.159 Ansgar Dietrichs: reasonably aggressive, I would say, option would be what's line 2 here, which would be really just the core frames EIP itself, nothing else, not even these privacy add-ons for frames. And then, if we wanted to 295 00:52:28.170 --> 00:52:35.969 Ansgar Dietrichs: to… if there is a reason for us to say we basically need to… to be as fast as humanly possible, basically, I don't think that's… 296 00:52:35.990 --> 00:52:54.349 Ansgar Dietrichs: super realistic, but I wanted to put it on for completeness. We could just ditch frames for now and have it just an enshrined PQ transaction type. I just wanted to list it for completeness' sake. So with that said, I would want to, for now, open the floor, and then afterwards, I have some specific next steps to propose in terms of how we make the decisions. Of course. 297 00:52:54.350 --> 00:53:04.040 Ansgar Dietrichs: This is not meant as a decision for today, I just wanted to start the discussion today. Any decisions regarding DFIs and so on would only be happening in two weeks. Lukasz, you have your hand up? 298 00:53:05.120 --> 00:53:16.969 Łukasz Rozmej: So, we at Nethermind have all the EIPs already implemented, at least some level, on the current level, so maybe some of them still have bugs, but they're there. 299 00:53:17.020 --> 00:53:41.679 Łukasz Rozmej: We would prefer not to reduce the scope of the fork, but, unless not to do it at this moment, but maybe, more… have a priority of EIPs, and for example, if the fork is ready to ship from the CL side, then just cut off at this point and move the other EIPs to the next fork. 300 00:53:41.850 --> 00:53:56.259 Łukasz Rozmej: That way, it would give us flexibility, while potentially shipping everything we want if, for example, CL is not ready yet, and we will just go through it. So that's kind of having best of both ways. 301 00:53:56.260 --> 00:54:02.169 Łukasz Rozmej: With a bit of, agreement on the, on the priority list. 302 00:54:04.500 --> 00:54:23.909 Ansgar Dietrichs: Sounds good. And so, basically, like, if I were to translate this, you're saying you would basically be more between, I don't know, 4 and 5, somewhere where you're saying, like, no need to massively downscope, just, of course, be willing to maybe cut off, if we are ready early to ship, maybe cut off, leave the other EIPs out, but in principle, try to work towards a mostly normal scope. Is that the 303 00:54:23.910 --> 00:54:24.740 Ansgar Dietrichs: Reasonable summary? 304 00:54:24.760 --> 00:54:34.929 Łukasz Rozmej: Yes, unless CLs tell us next week that they're ready to ship, then we might want to massively reduce the scope, but otherwise, you know, not. 305 00:54:35.730 --> 00:54:38.369 Ansgar Dietrichs: Okay. Ben, you had Yann up next? 306 00:54:39.300 --> 00:54:46.689 Ben Adams: Yeah, so there are a number… we haven't completed the PFI process, so we should probably… 307 00:54:47.690 --> 00:54:50.869 Ben Adams: at least do that, also. 308 00:54:51.180 --> 00:54:58.039 Ben Adams: I'm with Lukasz on… we don't necessarily have to reduce the scope, although maybe… 309 00:54:58.290 --> 00:55:00.360 Ben Adams: when we're looking at what's PFI'd. 310 00:55:01.000 --> 00:55:11.190 Ben Adams: after completing it, we should, so, like, are we… are we putting potential PQ additions in? That's… we haven't gone through that in the PFI, and there are a number of items still there. 311 00:55:13.480 --> 00:55:29.189 Ben Adams: And then, I think what's probably more important is, prioritizing what we land and what order to the DevNets, so that we have, you know, we do the PQ stuff first, as much as possible. 312 00:55:29.290 --> 00:55:37.900 Ben Adams: Obviously, if they're not ready to land, then maybe we learn some other things. But maybe that… the DevNet prioritization is what we should really focus on. 313 00:55:38.490 --> 00:55:49.250 Ansgar Dietrichs: Yeah, I, my intention was to block the last 20 minutes of the call today to talk about definite implications, if that makes sense, so that we first have the general discussion, and then from that we can go into what does it mean for the DevNets. 314 00:55:50.090 --> 00:55:51.840 Ansgar Dietrichs: Ivan? 315 00:55:53.230 --> 00:56:12.739 Iván | ethrex: Thanks. From the ethics side, we are between 3 and 4. We would like to either reduce the scope, or just to freeze it as we… as we are. I think that just freezing where we are at right now, we have mostly all the EPQ features we need, and also. 316 00:56:12.800 --> 00:56:23.849 Iván | ethrex: I would leave an open window for 80 to 888 forward-compatible solution for the PQ signatures enshrined in the protocol. 317 00:56:24.030 --> 00:56:28.780 Iván | ethrex: Yeah, I think… 318 00:56:29.190 --> 00:56:38.789 Iván | ethrex: it's not a problem implementing the rest of the EIPs, but I think we need to think on the testing side of things. 319 00:56:38.960 --> 00:56:41.360 Iván | ethrex: if we want to ship Hegota. 320 00:56:41.670 --> 00:56:47.990 Iván | ethrex: in the dates that we talked about, during the… during the Econ and in previous talks, 321 00:56:48.910 --> 00:56:55.719 Iván | ethrex: if we… if we cut now, we can start testing, finding edge cases. There's a couple of EIPs that need 322 00:56:55.970 --> 00:57:04.420 Iván | ethrex: the same care that we are taking now for 8037 and 8038 for users, for example, 8151. 323 00:57:04.610 --> 00:57:12.339 Iván | ethrex: And But… Yeah, I think that either cutting, freezing right now what we have. 324 00:57:12.750 --> 00:57:19.360 Iván | ethrex: path opening, leaving a window open for a 80-288 forward compatible solution, or… 325 00:57:19.730 --> 00:57:26.880 Iván | ethrex: give the opportunity to the already CFI EIPs to… to select a few of them that might be… 326 00:57:27.030 --> 00:57:32.239 Iván | ethrex: adding cool features to Ethereum. That's our point of view. 327 00:57:33.180 --> 00:57:37.100 Ansgar Dietrichs: Okay, so… To repeat, that's between 3 and 4, right? 328 00:57:39.300 --> 00:57:43.229 Iván | ethrex: Yeah, between 3 and 4, plus the potential PQ additions down there. 329 00:57:43.230 --> 00:57:46.179 Ansgar Dietrichs: Yes. Okay, perfect, thank you. Justin? 330 00:57:46.810 --> 00:57:52.620 Justin Florentine (Besu): I don't have to say much, because I think Ivan said most of our stance here, 331 00:57:52.840 --> 00:57:57.679 Justin Florentine (Besu): Hegota DevNet 2 shipped. I think that's a reasonable freezing point. 332 00:57:57.920 --> 00:58:06.519 Justin Florentine (Besu): I'd love to see the signature aggregation and some form of Sphinx be the next priority that we work on. 333 00:58:06.640 --> 00:58:10.059 Justin Florentine (Besu): And putting other stuff on… on pause. 334 00:58:12.920 --> 00:58:23.300 Ansgar Dietrichs: Okay, so that's also, that, I would say, leans even more to 3, right? It's, like, not between 3 and 4, more like 3, and then just, if we add something more, that's from the PQ side, not so… 335 00:58:23.300 --> 00:58:31.550 Justin Florentine (Besu): I would phrase it as 2 plus Sphinx and signature aggregation, but 3 is a… Reasonable. 336 00:58:33.250 --> 00:58:37.230 Ansgar Dietrichs: Yeah, just because I think the DevNet already basically includes the core frames bundle. 337 00:58:38.040 --> 00:58:39.460 Ansgar Dietrichs: Yeah, okay, sounds good. 338 00:58:39.740 --> 00:58:49.269 Ansgar Dietrichs: Okay, thank you. Do we have other, again, the idea is not to make decisions today, so today is just to have a baseline for… for the conversation, and 339 00:58:49.790 --> 00:58:52.000 Ansgar Dietrichs: But yeah, so any other takes? 340 00:58:52.210 --> 00:58:53.660 Ansgar Dietrichs: Kev, you have your hand up? 341 00:58:56.960 --> 00:59:11.320 Kevaundray Wedderburn: Yeah, maybe just double-clicking on Ivan's point, about 8151, and not repeating what happened with 8037. We did, like, a preliminary just scan of contracts that do depend on EC Recover. 342 00:59:11.660 --> 00:59:17.709 Kevaundray Wedderburn: And, yeah, I mean, I guess you already know, like, there's quite a lot that, potentially break, 343 00:59:17.930 --> 00:59:27.819 Kevaundray Wedderburn: If this is the case, and we do need them to migrate their contracts, then potentially we might not be able to get that into Hegota. So that's the only thing I'd say. 344 00:59:30.570 --> 00:59:33.229 Ansgar Dietrichs: Yeah, that's a really good point. 345 00:59:35.100 --> 00:59:36.160 Ansgar Dietrichs: Sounds good. 346 00:59:36.260 --> 00:59:55.679 Ansgar Dietrichs: So, you know, again, anyone else who wants to still speak about this? By the way, Justin, you still have Yannabe, but I assume it's just from before. Anyone else who is still techs, please also raise your hand still. Just to already then say, in terms of next steps, I was thinking to ask all client teams to… 347 00:59:56.280 --> 00:59:58.830 Ansgar Dietrichs: have a look. We can maybe in a second here already 348 00:59:58.980 --> 01:00:15.030 Ansgar Dietrichs: delete rows that clearly have no support, so, so far I've heard absolutely zero support for the, say, the top row, canceling frames and replacing it with enshrined PQ, so for example, that we can delete. But then for the options that have at least some interest, some support, 349 01:00:15.030 --> 01:00:24.219 Ansgar Dietrichs: Prepare a short, doesn't have to be formal, doesn't have to be long, like one paragraph, two paragraphs, client team position by the end of next week. 350 01:00:24.250 --> 01:00:32.520 Ansgar Dietrichs: So that people have a little bit of time to look at it, and then we can discuss it in two weeks on ACDE. I think that would be a helpful next step. 351 01:00:32.610 --> 01:00:38.499 Ansgar Dietrichs: But also, we still have some time for any discussion to happen now. So, Lukasz, you have your hand up? 352 01:00:39.240 --> 01:00:57.110 Łukasz Rozmej: It would be good to understand how do we feel, what's our estimate of how this affects timeline of Hegota, whichever do we do here? Because, for example, if we cut the scope, but then wait for CL to be ready, then, 353 01:00:57.110 --> 01:01:08.120 Łukasz Rozmej: we achieved nothing, and on the other hand, if EL is ready very soon, and we don't cut the scope and they are waiting for us, it's also suboptimal, so… 354 01:01:08.120 --> 01:01:15.449 Łukasz Rozmej: this needs, like, a proper, like, time analysis, where what would that give us, right? 355 01:01:16.250 --> 01:01:17.719 Łukasz Rozmej: That's… that's my point. 356 01:01:18.510 --> 01:01:20.350 Ansgar Dietrichs: And you summon Potus? Potus? 357 01:01:20.850 --> 01:01:27.019 Potuz: I think we can always, analyze whenever, independently on how you guys decide the scope. 358 01:01:27.020 --> 01:01:51.359 Potuz: If you decide a scope that is very fast on the EL, and we are working on PQ on the CL, and we see that it's going to take much longer, we are fine to just have a small fork on the CL side that would just start doing the pre-registration thing, because that's very small on our side. So we can fork with whatever Hegota and frames and all the PQ on the EL side is ready, and we just only… 359 01:01:51.360 --> 01:01:57.709 Potuz: take the port that consumes the PQ data on the SL side. That already gives us some security. 360 01:01:58.050 --> 01:01:58.669 Potuz: And it's easy. 361 01:01:58.670 --> 01:01:59.110 Łukasz Rozmej: Okay. 362 01:01:59.110 --> 01:02:00.010 Potuz: on the SL. 363 01:02:00.010 --> 01:02:17.020 Łukasz Rozmej: Okay, okay, so that's a very good argument for potentially, reducing the scope and moving some things into later forks, if we can get it… I don't know, what would the timeline would be if… let's say if we do Glamsterdam late January, then we can do it… 364 01:02:17.020 --> 01:02:20.530 Łukasz Rozmej: Late March, early April. 365 01:02:21.920 --> 01:02:23.080 Barnabas: No, we can't. 366 01:02:23.210 --> 01:02:25.950 Barnabas: We have multiple months of testing cycles. 367 01:02:26.180 --> 01:02:29.089 Barnabas: You would need to have, like, go out by… 368 01:02:29.530 --> 01:02:34.490 Barnabas: January in the first testnet for that. That's… It's impossible. 369 01:02:39.250 --> 01:02:46.540 Barnabas: We haven't even agreed on, like, actual signature schemes and stuff, so… that's… That's not possible. 370 01:02:55.170 --> 01:02:57.050 Ansgar Dietrichs: Yeah, but, I think, 371 01:02:57.180 --> 01:03:10.360 Ansgar Dietrichs: Potus, what you said, I think, is quite important to… just to highlight, right? Like, I think, because I here have, say, FOCIL, which is in some sense just a placeholder for, like, all the EL side decisions, of course, they will happen on ACDC, but I actually think, 372 01:03:10.530 --> 01:03:18.270 Ansgar Dietrichs: already with the Glamstadum decisions, but then also now with the Hegota decisions, actually, I think it would be very helpful for EL Devs to attend the next two 373 01:03:18.450 --> 01:03:26.750 Ansgar Dietrichs: ACDC calls as well, and we have a whole range of options. The EL could shift around. 374 01:03:26.940 --> 01:03:43.839 Ansgar Dietrichs: EIPs or not, or shift them around, we can decouple hard forks, or at least semi-decouple them by only having a minimal CL-side hard fork together with the EL. So we have quite a bit of flexibility, and we just need to make sure that we are aligned across layers. Greg, you have your hand up next? 375 01:03:44.840 --> 01:03:51.100 Greg Colvin: Yeah, I don't know if this is quite the right time. I'm speaking for myself. 376 01:03:51.350 --> 01:03:56.670 Greg Colvin: But I'm sure there must be other people affected, which is… 377 01:03:56.840 --> 01:04:04.070 Greg Colvin: anytime we pull an EIP out of a fork, which has happened to me. 378 01:04:04.520 --> 01:04:19.190 Greg Colvin: once, arguably twice, where a very similar EIP was literally removed from code that was ready to ship, and that code had to be retested. But… 379 01:04:19.360 --> 01:04:35.860 Greg Colvin: When it is removed this time, people reassured me it would be only 6 months. Of course, it's going to be well over a year. If it's removed this time, it gets moved supposedly 6 months, probably well over a year. 380 01:04:35.860 --> 01:04:42.230 Greg Colvin: I'm an old man, and these constant delays. 381 01:04:42.230 --> 01:05:05.860 Greg Colvin: simply make it impossible to plan my life. I waste… basically, if it's removed, I wasted a fair amount of my summer doing work, that actually won't need to be done for a year. So, I would much prefer that we just slide the fork. We slide them over and over again. 382 01:05:05.860 --> 01:05:17.449 Greg Colvin: The community's used to that. Just slide the fork on down so people can continue to expect that certain features are going to be in that fork. 383 01:05:17.450 --> 01:05:30.080 Greg Colvin: Instead of constantly being told, oh, we told you 2 years ago that you could count on this, but no, you can't count on that. It might be 3 years, it might be four. So… 384 01:05:30.270 --> 01:05:31.210 Greg Colvin: It's… 385 01:05:31.540 --> 01:05:42.409 Greg Colvin: It just gets silly. Nobody… nobody can make plans, and it hurts me personally. It hurts bad. So, I'll just leave it at that. 386 01:05:44.370 --> 01:05:54.520 Ansgar Dietrichs: Yeah, thank you, Greg, and I think that's a good, maybe, also, stand-in. I think we should keep in mind, you know, we have 20, or again, maybe it's 18 or 19 or something. 387 01:05:54.530 --> 01:06:04.580 Ansgar Dietrichs: CFI slash SFI EIPs. Each one has champions that are very passionate about the feature, of course, app developers that are very much looking forward to these features, so, 388 01:06:04.730 --> 01:06:22.439 Ansgar Dietrichs: the more we restrict our scope here, the more we leave these EIPs behind. Now, of course, they are only CFI anyway, so they are, for now, only considered, so it is perfectly normal for some of them to not make it into the fork, but still, of course, it's not a free decision, so I think that's really good to keep in mind, so thank you for that. 389 01:06:22.660 --> 01:06:25.279 Ansgar Dietrichs: Ben, you have your hand up next? 390 01:06:25.960 --> 01:06:31.870 Ben Adams: Yeah, just to follow up on Barnabas' point, if… if we can't… 391 01:06:32.130 --> 01:06:38.760 Ben Adams: If reducing the scope, we still can't actually bring it forward, then there's no point in reducing the scope. 392 01:06:38.980 --> 01:06:50.640 Ben Adams: You know, if we still have to decide on signature… the PQ stuff, if we have to decide on the signature schemes, we're doing Lean Sphinx, which isn't finalized. 393 01:06:50.750 --> 01:06:54.289 Ben Adams: then… All we're doing is putting a lot of… 394 01:06:54.450 --> 01:06:57.599 Ben Adams: Additional slack in without achieving anything extra. 395 01:07:01.120 --> 01:07:03.480 Ansgar Dietrichs: Yeah, that's sensible. Mislav? 396 01:07:04.580 --> 01:07:07.279 Mislav | Ethlabs: Yeah, I wanted to just, 397 01:07:07.430 --> 01:07:15.489 Mislav | Ethlabs: comment on, some… some… somebody mentioned here about, like, going with Lean Sphinx on the EL. I am, 398 01:07:15.700 --> 01:07:35.350 Mislav | Ethlabs: somewhat in conversations with wallets and other potential end users of, you know, frames, and it seems that there is appetite for, like, MLDSA and other potential signing schemes. Some even don't feel like a super big pressure on the PQ side. They might even want to have, 399 01:07:35.540 --> 01:07:41.970 Mislav | Ethlabs: like, pass keys for a while. I think for just product side of things. 400 01:07:42.060 --> 01:07:58.069 Mislav | Ethlabs: we should consider frames being, like, completely scheme agnostic, just that it, yeah, it can be verifier smart contracts, which can, you know, verify against arbitrary schemes. Maybe we ship, like, 5, 6, 7 canonical ones. 401 01:07:58.100 --> 01:08:09.749 Mislav | Ethlabs: they're generally not huge contracts, right? And then with 8288 and aggregation down the line, that all gets compressed into a single one, either way. But I think, yeah, for the intermediary part of things. 402 01:08:09.910 --> 01:08:24.020 Mislav | Ethlabs: seems that the internet is moving towards lattices, and I'm not a cryptographer, so I can't say whether or not, like, hashes are better or not, but just for the UX product's sake, we… this is something we might consider. 403 01:08:29.590 --> 01:08:31.540 Ansgar Dietrichs: Thank you. Potuz next? 404 01:08:32.040 --> 01:08:42.659 Potuz: Yeah, perhaps kind of orthogonal to that, but, I wanted to put a plus one on, on not… on actually shipping on Hegota one form of enshrinement of picky signatures. 405 01:08:42.779 --> 01:09:07.670 Potuz: Because we know that what's going to take the longest to upgrade is going to be the community, and there's a bunch of projects that, if we now commit to having this signature scheme, to making it cheap to validate, they can start upgrading right now. Like, think about rollouts, for example. They are already having their own plans on how they're going to do their PQ upgrade, and if they already have some commitment from L1 of what L1 is going to do. 406 01:09:07.670 --> 01:09:14.589 Potuz: And which forkids they're gonna do it, then they can adapt to that, and they can start, like, shipping even before us, before we do. 407 01:09:18.249 --> 01:09:19.309 Ansgar Dietrichs: Nico? 408 01:09:23.300 --> 01:09:29.450 Nico: just wanted to react to Mislav's comments. So, we did work on… MLDSA, 409 01:09:29.939 --> 01:09:41.679 Nico: And we had… we had two, two precompiled proposals for body schemes to be, enshrined as precompile, and we decided not to go with them. Our first realization was that 410 01:09:41.859 --> 01:09:47.529 Nico: it's actually becoming cheaper to do in the EVM. We optimize the bot, 411 01:09:48.210 --> 01:09:55.530 Nico: We optimized about the two schemes with native verifiers, so they became, around 1 million 412 01:09:56.260 --> 01:10:03.920 Nico: gas to do, and the general decision to not, CFI these, schemes. 413 01:10:04.750 --> 01:10:17.559 Nico: is that we consider that hash-based cryptography is the most conservative option, and is the most reliable one in the future. In the future, we are not completely sure of all the 414 01:10:17.930 --> 01:10:23.860 Nico: Mathematic assumptions that are, that are used for… 415 01:10:24.060 --> 01:10:39.139 Nico: lattice-based cryptography, so we decided to create the entire lean VM and lean roadmap around hash-based cryptography. So we would be enshrining one, or maybe 416 01:10:39.630 --> 01:10:47.490 Nico: several, hash-based programs, we… we did not to… to enshrine, lattice-based with. 417 01:10:49.250 --> 01:10:56.900 Nico: And for hardware support and tooling, we are lucky that actually inside MLDSA, you need to do 418 01:10:57.170 --> 01:10:59.869 Nico: You need to do a hash, 419 01:11:04.520 --> 01:11:05.390 Nico: Yeah. 420 01:11:05.390 --> 01:11:08.199 Ansgar Dietrichs: thank you, Nicole. 421 01:11:08.370 --> 01:11:11.309 Ansgar Dietrichs: Mmm… Next up, Dragan. 422 01:11:12.810 --> 01:11:21.049 Dragan Rakita: Yeah, I wanted to say something similar. I think, Sphinx as a choice is a good one for next few years. 423 01:11:21.300 --> 01:11:28.460 Dragan Rakita: Because uncertainty that they are bringing, if the thing is going to break, what exploits are going to be found. 424 01:11:28.660 --> 01:11:35.909 Dragan Rakita: I think being more secure, or being more sure on the cryptography is important. 425 01:11:36.080 --> 01:11:49.740 Dragan Rakita: I do think in a few years after that, even NIST is now standardizing new PQ signatures, or cryptography that's probably going to have better properties with smaller signatures. 426 01:11:49.990 --> 01:11:54.240 Dragan Rakita: I would assume in a few years that we are all going to use those kind of things. 427 01:11:54.520 --> 01:12:01.369 Dragan Rakita: But for now, zync seems like the best option, and frames in general should support everything around it. 428 01:12:02.120 --> 01:12:07.980 Dragan Rakita: But yeah, I think wallets in general are going to have a hard time 429 01:12:08.420 --> 01:12:15.719 Dragan Rakita: Fitting all that into their software that basically needs to support, now, multiple signatures and everything around that. 430 01:12:18.770 --> 01:12:23.800 Ansgar Dietrichs: Thank you. And Nico, you still have your hand up, but I assume that was from before. Matt, you're next? 431 01:12:26.040 --> 01:12:30.099 lightclient: Yeah, I was just gonna say, like, this is one of the reasons why we… 432 01:12:30.760 --> 01:12:35.389 lightclient: listed the MLDSA EP is fairly high on our tier list. 433 01:12:35.610 --> 01:12:40.080 lightclient: Like, we still also believe that hash… the hash-based cryptography is a good… 434 01:12:40.220 --> 01:12:55.529 lightclient: baseline assumption. But I think, like, what we saw with the, you know, choosing the K1 curve, like, we're doing a similar thing here with Lean Sphinx. Like, Lean Sphinx is not a standardized crypto scheme. We're choosing some of our own parameters for it. 435 01:12:55.740 --> 01:13:07.610 lightclient: And it's not going to have the same, like, industry support broadly as something as, like, NIST standardized MLDSA. And so eventually, after a lot of work, we did standardize, you know, R1. 436 01:13:07.770 --> 01:13:24.690 lightclient: because of these types of pressures. So, in this way, I don't see why we wouldn't just support MLDSA, which has, like, tons of tailwind and industry support, even if we tell people that maybe we won't support MLDSA as a first-class aggregatable signature scheme. 437 01:13:24.880 --> 01:13:26.749 lightclient: In the foreseeable future. 438 01:13:26.850 --> 01:13:42.400 lightclient: I don't see why we wouldn't give people options. Like, our ultimate goal is we want people to be PQ safe, and giving people more options feels like it would increase the likelihood that, you know, a high percentage of our users would switch to something that's positive. 439 01:13:44.040 --> 01:13:46.040 Nico: The reason… Yeah. 440 01:13:46.380 --> 01:13:52.550 Nico: The reason behind, like, not enshrining too much is that it slows down syncs for… 441 01:13:59.330 --> 01:14:03.079 Ansgar Dietrichs: I think, Nico, you might have some connection issues, at least for me, you're cutting out occasionally. 442 01:14:08.880 --> 01:14:16.780 Ansgar Dietrichs: Matt, then, could you clarify when you say, like, basically, would this have been an argument for reconsidering, 443 01:14:16.870 --> 01:14:29.259 Ansgar Dietrichs: CFI decision for the ML DSA precompile concretely, or are you just arguing for keeping the frames logic kind of, like, signature type agnostic? Or what specifically would be the proposal? 444 01:14:30.170 --> 01:14:32.589 lightclient: I mean, obviously, like, we want the frames… 445 01:14:32.890 --> 01:14:44.210 lightclient: you know, signature type to be agnostic. That's an important design goal, and so that's… nothing will change there. And I'm not asked to say reopen MLDSA discussion. Like, people DFI'd it. 446 01:14:44.300 --> 01:14:51.650 lightclient: If others feel that it's worthwhile looking at that, then sure, we can do that. But I think that this… 447 01:14:51.710 --> 01:15:09.259 lightclient: I don't like this way that we're talking about this stuff, as if, like, you know, the hash-based Lean Sphinx is the only solution. Like, our ultimate goal is we want our users to be secure, and I think that that means we should just give them as many options as possible, whether it be EL DSA, whether it be Lean Sphinx, Sphinx… 448 01:15:09.520 --> 01:15:15.360 lightclient: I think, you know, the big fear I have is that we're using a non-standard 449 01:15:15.600 --> 01:15:22.590 lightclient: crypto scheme, and we're going to force all of our users to use this, and it doesn't have the industry support that things like MLDSA has. 450 01:15:22.720 --> 01:15:25.900 lightclient: So, whether it's MLDSA or something else, like, we should not… 451 01:15:26.010 --> 01:15:34.849 lightclient: be overly fixated on this, you know, one scheme being the end-all, be-all solution for every user in Ethereum. There are so many different types of users with different constraints in different countries. 452 01:15:37.420 --> 01:15:54.840 Ansgar Dietrichs: Yeah, I think in the interest of time, we have, like, 5 more minutes for this segment. I would, for now, like, try to ask to… I mean, I see Antonio signed up, so maybe I can, like, also have you briefly respond to this. I assume you want to respond to the cryptography side of it, but then otherwise, after that, keep it to the questions around… 453 01:15:54.930 --> 01:15:57.880 Ansgar Dietrichs: Fork scoping, specifically. But yeah, Antonio, you can briefly. 454 01:15:57.880 --> 01:16:04.310 Antonio Sanso: Well, I just, like, would want to say this, like, well, one thing's actually, like, 455 01:16:04.890 --> 01:16:08.180 Antonio Sanso: I… tell you, like, to… 456 01:16:08.360 --> 01:16:18.239 Antonio Sanso: give me… to do a leap of faith, and really, like, at the moment, I will really skip the Lattice discussion. I'm in the interest of your time, I mean. 457 01:16:20.100 --> 01:16:26.580 Antonio Sanso: Give me a leap of faith, do a leap of faith, and really, let's not talk about Lattice for now, because… 458 01:16:27.860 --> 01:16:32.450 Antonio Sanso: let's wait a few more weeks. I mean, in my opinion, like, we should really focus on… on… 459 01:16:32.810 --> 01:16:39.909 Antonio Sanso: On, hash, and in a few weeks, it's gonna be more clear why we want to really focus on hash. 460 01:16:40.200 --> 01:16:49.400 Antonio Sanso: In terms of, like, the other things, I'm not, of course, being part of any client, but if it will be me, I will really, like. 461 01:16:49.400 --> 01:17:03.289 Antonio Sanso: try to close as much as possible with the post-quantum story, so, like, be post-quantum. We do it, done, and dusted, and then, like, we add all the other things. But again, again, I'm really, really biased. 462 01:17:05.610 --> 01:17:06.630 Antonio Sanso: That's basically it. 463 01:17:06.630 --> 01:17:09.020 lightclient: It's not… it's not just… 464 01:17:09.020 --> 01:17:09.700 Ansgar Dietrichs: Can we… 465 01:17:09.700 --> 01:17:10.800 lightclient: versus, like. 466 01:17:10.800 --> 01:17:27.640 Ansgar Dietrichs: I'll now wrap it up. Matt, I want to cut in, just because it's a good conversation, it's an important conversation for Ethereum, but I think on today's call, like, we can have a separate call where we then discuss, like, as I said, that's where I listed it as a potential future decision. Is there some way in which we want to enshrine Lean Sphinx or something like this? 467 01:17:27.640 --> 01:17:41.909 Ansgar Dietrichs: We can discuss this on a future call, but I would for now really keep it to the question of how do we feel about how restrictive we want to be with the initial… with the Hegota scope as we ship it. And so I think all of this is a bit now off to the side of that conversation. 468 01:17:43.390 --> 01:17:44.620 Ansgar Dietrichs: If that's okay with you. 469 01:17:46.920 --> 01:17:49.300 lightclient: Just gonna say something, but I guess we can call it. 470 01:17:49.980 --> 01:17:52.560 Ansgar Dietrichs: You can… maybe you put it in chat instead. 471 01:17:53.430 --> 01:17:54.589 lightclient: And we did. 472 01:17:54.990 --> 01:18:12.220 Ansgar Dietrichs: Very good. Okay, so then I would say, if that's okay with everyone, I would cut that discussion here. I think this was good contributions. I think right now, I saw, basically, the main questions around… there was a little bit of support for even level 2, meaning, like. 473 01:18:12.550 --> 01:18:29.769 Ansgar Dietrichs: dropping some of these framed companion EIPs even, but I thought that that was a bit of an outlier position, so I think primarily support seemed to have been between option 3, which would basically be sim… close to what we have today on the DevNets, plus possibly going towards 4, meaning allowing for a few extra EIPs. 474 01:18:29.770 --> 01:18:45.970 Ansgar Dietrichs: And then there was some Nethermind push for, for, like, basically, like, why… basically, like, if we can't, if we can't make it a very fast fork, maybe we should continue just down the normal path of 5. So, so that's basically the design space currently that we have, the option space, and so I would then… 475 01:18:46.060 --> 01:19:05.170 Ansgar Dietrichs: ask all clients, and I'll put this on Discord and also on the agenda for the call in two weeks, if you could please just, again, one paragraph is enough, just that every client has a position on this written down, that's agreed upon within the team, by the end of next week. I think that would be really helpful, so that then on 476 01:19:05.260 --> 01:19:21.710 Ansgar Dietrichs: the call in two weeks, for example, we could at least, I mean, obviously, TBD, how the conversation goes, but at least we are, in principle, then in a position to start making, DFI decisions for EIPs that will not make the cut for Hegota. On that point specifically, like, do we have a process thing you want to bring up there, Ben? 477 01:19:22.470 --> 01:19:28.599 Ben Adams: Yeah, so we still have a number of PFI EIPs, and I'd like to… 478 01:19:29.050 --> 01:19:35.430 Ben Adams: officially go through those to… even if it's just to DFI them, but rather than… 479 01:19:35.770 --> 01:19:46.950 Ben Adams: sort of leaving them in limbo as they are at the moment, or sweeping them away, saying, oh, we're gonna cut the fork a little bit. So, all these things which we've not mentioned get cut. 480 01:19:47.230 --> 01:19:50.360 Ben Adams: I feel that's not the right process. 481 01:19:50.360 --> 01:20:03.640 Ansgar Dietrichs: would you be strongly opinionated that you want to do this on this call? Like, in the interest of time, I would, in some sense, prefer to right now talk about DevNet scopes first. Basically, would you specifically… are you asking that we do this today? 482 01:20:04.150 --> 01:20:12.659 Ben Adams: Oh, no, no, I mean, we can do it next time. But I mean, I don't think we should just say everything's DFI'd that we haven't talked about. That seems wrong. 483 01:20:12.970 --> 01:20:27.610 Ansgar Dietrichs: Yes. No, I totally agree. So, like, I will also make sure that for the call in two weeks, that I'll make sure we are well prepared in terms of, yeah, very explicitly looking at everything that needs decisions, and nothing will just be a silent decision. I definitely agree with you there. 484 01:20:28.420 --> 01:20:46.070 Ansgar Dietrichs: Okay. Then, I think this is a good, stopping point here. Maybe we can keep the slide on screen for a second, Marc, just because I think it's still helpful. I had two more agenda points. One was the DevNet. 485 01:20:46.070 --> 01:20:48.819 Ansgar Dietrichs: I had before that, just briefly, a… 486 01:20:48.820 --> 01:20:52.530 Ansgar Dietrichs: Quick, frame Transaction update, so basically, like, the… 487 01:20:52.530 --> 01:21:00.810 Ansgar Dietrichs: A summary of the breakout, and a quick discussion of the, of the proposal by, 488 01:21:00.930 --> 01:21:16.380 Ansgar Dietrichs: Ivan, about minimal Lean Sphinx, maybe if we could do this still in a concise way, that could be helpful in framing our discussion for the DevNets then. Like, Matt, would you be willing to give a very quick update of what was discussed on the breakout call? 489 01:21:23.830 --> 01:21:32.410 lightclient: Sure. So, for the most part, we just talked about some discussions that happened in Mumbai. 490 01:21:32.920 --> 01:21:35.660 lightclient: A handful of things that we're still looking at changing. 491 01:21:35.820 --> 01:21:41.250 lightclient: in the spec for frames. These are things that, like, we're considering. 492 01:21:42.090 --> 01:21:51.770 lightclient: Number one is… try to become more forward compatible with 8288. Today, we have this signature list, whereas 8288 493 01:21:52.180 --> 01:21:56.389 lightclient: It has this, like, frame mode mechanism for… 494 01:21:56.670 --> 01:22:02.720 lightclient: you know, defining what the dependencies are. So we're looking at how can we maybe… 495 01:22:02.880 --> 01:22:08.929 lightclient: Change the signature list or remove the signature list so that it works better in this, like, 8288 world. 496 01:22:09.640 --> 01:22:18.599 lightclient: And then the other primary thing that we're looking at a bit is the hashing scheme for frames. 497 01:22:18.780 --> 01:22:21.140 lightclient: Obviously, we want frames to be… 498 01:22:21.300 --> 01:22:29.119 lightclient: the last transaction type we need to ship for at least a long time on the execution layer. And, you know, the… 499 01:22:29.650 --> 01:22:37.399 lightclient: Tree root-style hash has been proposed for transactions for a long time, and so it's… 500 01:22:37.400 --> 01:22:50.540 lightclient: something that Etan is going to write a PR in the next couple weeks to propose. The ultimate takeaway is that, you know, there's these big, big pieces and then a couple small pieces we're looking at. We want all of these spec changes to happen. 501 01:22:50.670 --> 01:23:06.029 lightclient: by the end, or, you know, yeah, before we all go off for the holidays, essentially. So, sometime halfway through December, we want frames to basically be in a place that it's kind of spec complete, modulo, the small changes that happen through testing and implementation. 502 01:23:06.320 --> 01:23:10.209 lightclient: So that's kind of the result of the breakout at this point. 503 01:23:12.530 --> 01:23:26.050 Ansgar Dietrichs: Awesome, and I saw, yeah, I mean, I think you probably mentioned it, I saw from Ivan Ivan, sorry, I don't know which way to pronounce this, that there was the comment on the agenda as well. Would you want to briefly talk about this? But, yeah. 504 01:23:26.970 --> 01:23:27.830 Ansgar Dietrichs: Briefly. 505 01:23:27.830 --> 01:23:37.290 Iván | ethrex: Thank you. Yes, as I commented in the Frames breakout, I was working on a solution for having 506 01:23:37.420 --> 01:23:48.340 Iván | ethrex: Lean Sphinx native on top of frames, while keeping the interface compatible with 8288, with no aggregation, with no prover, with no proofs. 507 01:23:48.490 --> 01:24:06.379 Iván | ethrex: But the design is made to support this in the future. So, I had a slide for this, but I don't want to just keep your screen off, so it's okay. But my idea was to introduce this EIP that I'm writing. I posted in the chat in an earlier message, earlier message. 508 01:24:06.380 --> 01:24:09.720 Iván | ethrex: I'm still working on it. I'll be adding specs 509 01:24:09.720 --> 01:24:20.339 Iván | ethrex: this week, and the next one. For now, it's just an abstract and a motivation. I encourage everyone to take a look at it. The PR is there. 510 01:24:20.550 --> 01:24:27.149 Iván | ethrex: And yeah, my idea is to propose it for Hegota next ACDE. 511 01:24:29.670 --> 01:24:36.120 Ansgar Dietrichs: Sounds good. Yeah, and thank you for your consideration and keeping it short and without the slides, just because we want to still talk about the DevNets. 512 01:24:36.120 --> 01:24:50.649 Ansgar Dietrichs: And yes, normally, of course, we are way beyond, kind of, scope changes for Hegota edition-wise, but this is one of those topics where, as we discussed, and as is on the slide, like, we… of course, anything that's directly PQ-related is something we would consider. 513 01:24:50.720 --> 01:24:53.790 Ansgar Dietrichs: So that makes sense, and everyone should have a look. Thank you. 514 01:24:53.830 --> 01:25:06.200 Ansgar Dietrichs: That then, I think, is the context from FAMS side to talk about DevNets now. So just as a recap, where we left it off before DevCon was that there was some conversation around having a shared 515 01:25:06.220 --> 01:25:17.309 Ansgar Dietrichs: CL EL, DevNet, even, even maybe already before Devcon. In the end, we decided against that. So for now, we still have the, the EL only. 516 01:25:17.310 --> 01:25:33.360 Ansgar Dietrichs: DevNet, DevNets, and the scope there, I actually… I should probably know this, I'm a little bit, unsure about the very exact list of EIPs there, but it is basically roughly the core frames bundle, plus… plus a little bit extra. 517 01:25:33.360 --> 01:25:40.280 Ansgar Dietrichs: So, reasonably close to what option 3 on the slide here would be, the con shape. Now. 518 01:25:40.580 --> 01:25:59.849 Ansgar Dietrichs: in the past, like, when we talked about next DevNets and how to progress, there was the intention of basically progressively starting to add more and more EIPs from the list priority ranking that we had, in the light of us now having uncertainty around how much beyond the current scope of the DevNets would we even want to go. 519 01:25:59.850 --> 01:26:04.359 Ansgar Dietrichs: Of course, we could also still consider kicking out individual EIPs again that are already on the DevNet, but 520 01:26:04.360 --> 01:26:23.290 Ansgar Dietrichs: But especially, like, say, going beyond the scope, there was some desire to stop adding… to stop basically moving to next DevNets and keep adding EIPs, and instead focus on taking the current scope of the DevNets and hardening it, and basically get that… that set of EIPs already towards something that's closer to production readiness. 521 01:26:23.290 --> 01:26:34.030 Ansgar Dietrichs: So this would be my question for today, for now. Basically, the decision we should make is, are we… basically, should we progress right now towards the next batch edition of EIPs? 522 01:26:34.030 --> 01:26:45.239 Ansgar Dietrichs: Or should we at least say before… until we've made final decisions about what scope we are working towards here, should we basically pause at the current scope level of DevNets and 523 01:26:45.240 --> 01:26:52.819 Ansgar Dietrichs: and work on hardening. Yeah, I would open this up for discussion. We should just make a decision for at least 524 01:26:52.900 --> 01:26:55.030 Ansgar Dietrichs: For our expectation for the next week or two. 525 01:26:55.790 --> 01:26:57.569 Ansgar Dietrichs: Anyone who wants to speak up on this? 526 01:26:59.690 --> 01:27:17.910 Ansgar Dietrichs: And sorry, also, because I see in chat from Stefan, the… yes, the context here, of course, is now that, given that right now, at least, there's also now uncertainty from the CL side about, about scope, that would be another reason to maybe hold off from a cross-layer, DevNet if it might not actually be. 527 01:27:17.940 --> 01:27:21.289 Ansgar Dietrichs: the… the scope we're working towards in the end. Ben? 528 01:27:22.140 --> 01:27:24.729 Ben Adams: Yeah, so… explicitly… 529 01:27:25.080 --> 01:27:32.079 Ben Adams: just to bring up FOCIL, do we, like, hold on that one? Because that needs coordination with CL. 530 01:27:34.230 --> 01:27:36.089 Ansgar Dietrichs: Yeah, so that would be at least… 531 01:27:36.230 --> 01:27:41.820 Ansgar Dietrichs: My proposal to not consider a cross-layer DevNet until the decision there is final. 532 01:27:45.960 --> 01:28:00.020 Ansgar Dietrichs: Basically, that's one. One side… it's really kind of two decisions. One, do we want cross-layer or not? Or at least want to wait with cross-layer or not? And the other one is, do we want to wait with further EL side EIPs, or do we want to go ahead with adding further EL side EIPs? 533 01:28:00.410 --> 01:28:01.290 Ansgar Dietrichs: Mmm… 534 01:28:01.540 --> 01:28:09.349 Ansgar Dietrichs: So maybe then let's go through them one by one. So in terms of cross-layer, would anyone here right now want to speak up? Feels like… feels strongly that we should… 535 01:28:09.500 --> 01:28:12.879 Ansgar Dietrichs: As the next step, work on a cross-layered FNET? 536 01:28:14.900 --> 01:28:17.900 Ansgar Dietrichs: Well, I assume that's not why the hands are raised, but yeah, Barnabas? 537 01:28:19.050 --> 01:28:28.330 Barnabas: Yeah, I would propose against, making the decision today, and I would just propose that we do a Hegota necessary scoping without any FOCIL, just… 538 01:28:28.510 --> 01:28:30.039 Barnabas: Strictly ERCOP. 539 01:28:32.440 --> 01:28:36.200 Ansgar Dietrichs: Okay, so you're basically arguing against a cross-layered FNET, is that, is that right? 540 01:28:36.380 --> 01:28:37.390 Ansgar Dietrichs: Okay. 541 01:28:37.870 --> 01:28:39.769 Ansgar Dietrichs: And, Ivan? 542 01:28:41.150 --> 01:28:45.539 Iván | ethrex: Yes, I agree with most of what's been told. 543 01:28:45.790 --> 01:28:58.080 Iván | ethrex: We should wait for ACDC decision on FOCIL to think on the cross-layer DevNet, and also I would focus on gardening for the next DevNet. 544 01:29:00.210 --> 01:29:13.429 Ansgar Dietrichs: Yeah, sounds good. So then, I think on the cross-layer, it seems like we are in agreement. No, let's hold off for now from cross-layer DevNet until we have more clarity from the CL side. So that's decision one. And then, yes, for the second decision. 545 01:29:13.430 --> 01:29:23.360 Ansgar Dietrichs: do we want to focus on… so purely on the EL side now? Do we want to focus on the current scope of the DevNet, or do we want to add… consider adding further EIPs? 546 01:29:23.400 --> 01:29:34.890 Ansgar Dietrichs: Yeah, you just now mentioned you'd want to stick with the Khan scope. Is anyone… would anyone strongly want to push for considering a next DevNet soon with added EIPs? 547 01:29:44.870 --> 01:29:46.400 Ansgar Dietrichs: Lukasz? 548 01:29:46.400 --> 01:29:52.159 Łukasz Rozmej: consider adding EIPs, but consider means that we can decide not to do it, but consider it. 549 01:29:55.030 --> 01:29:55.420 Ansgar Dietrichs: Okay, yeah. 550 01:29:55.420 --> 01:29:55.810 Łukasz Rozmej: Yeah, this is… 551 01:29:55.810 --> 01:29:57.139 Ansgar Dietrichs: in line? Oh, you're good. 552 01:29:57.960 --> 01:30:04.320 Łukasz Rozmej: Yes, so the question is what we potentially would add first, decide, and then decide if we want to add it or not. 553 01:30:10.330 --> 01:30:24.929 Ansgar Dietrichs: Yeah, I also see in chat the question of whether the testing team has an opinion on what would be more helpful for them right now, whether to just pause at the current level, or move ahead with adding, carefully adding extra EIPs. Do we have someone from the testing team that could give a take on this? 554 01:30:27.550 --> 01:30:28.450 Ansgar Dietrichs: Mario? 555 01:30:29.430 --> 01:30:33.970 Mario Vega: Yeah, I can give my opinion, but Spencer, if you want also support, 556 01:30:34.200 --> 01:30:40.650 Mario Vega: you could give your opinion, too. My take is that we have a lot of Frame testing to do? 557 01:30:40.810 --> 01:30:53.030 Mario Vega: still, at least on the spec side, if we are talking about hardening, what we would do is basically just create more tests and consider even, like, mempool testing to some degree. I think that's one of the key 558 01:30:53.030 --> 01:31:01.190 Mario Vega: problems that could come with, with, with frames, so I think if we decide not to scope more EIPs at the moment, we would use that time. 559 01:31:01.190 --> 01:31:08.890 Mario Vega: to basically just harden the tests. But I'm not completely against, adding more EIPs. It also, like, on… 560 01:31:09.130 --> 01:31:12.060 Mario Vega: On, on what the client Devs, support. 561 01:31:15.590 --> 01:31:26.869 Ansgar Dietrichs: Yes, do we have any, other opinions either way, then? It feels like, so far, maybe leaning towards keeping it at the current level, at least for now, and then reconsidering as we go, but… 562 01:31:27.300 --> 01:31:30.499 Ansgar Dietrichs: But some willing… some… yeah, so is anyone, does anyone want them? 563 01:31:31.110 --> 01:31:32.550 Ansgar Dietrichs: Add their voice to this? 564 01:31:42.030 --> 01:31:54.960 Ansgar Dietrichs: Otherwise, I personally… I would just, again, use my moderator, kind of, like, default set power, to steer us towards, at least for now, pausing at the current scope. But, Ben, you have your end up? Maybe you want to push back? 565 01:31:55.660 --> 01:32:12.169 Ben Adams: Yeah, I mean, it's worth looking at what's on the table, and seeing if there's anything we can add. If there's not, you know, if there's anything we can get in. As I said in the chat, just because we want to ship PQ doesn't mean we should, 566 01:32:12.750 --> 01:32:20.420 Ben Adams: be timid at improving Ethereum in other respects. You know, we shouldn't… we shouldn't… Throw everything out. 567 01:32:22.260 --> 01:32:24.110 Ben Adams: I don't think that's justified. 568 01:32:25.600 --> 01:32:42.820 Ansgar Dietrichs: Yeah, I think, for me, the main question is really just, I think this is the decision that we will more generally have to make in the… in two weeks, I think, kind of, that's… and over the next two weeks, basically, like, how much do we want to shrink the scope of Heikota? That's why I also kept the slide, or Marc kept the slide up here. 569 01:32:42.820 --> 01:32:45.840 Ansgar Dietrichs: To remind us of that, 570 01:32:46.390 --> 01:32:55.339 Ansgar Dietrichs: I just worry that if we add EIPs right now, before we have made this decision, there is just a risk that we are now adding EIPs that we will then, in two weeks decide will not be part of the… 571 01:32:55.610 --> 01:33:08.430 Ansgar Dietrichs: fork scope, so that's just a risk of basically, like, having effort that ends up being basically premature, and if we are not otherwise at risk of idling over this time period, then 572 01:33:08.550 --> 01:33:22.779 Ansgar Dietrichs: that wouldn't bias me towards just holding off temporarily, and then we can basically keep going again once we have a clearer picture, but if someone has, say, for example, a specific EIP that we need to discuss, that they would want to… 573 01:33:25.730 --> 01:33:27.909 Ansgar Dietrichs: To add to the, to the, to the fork scope? 574 01:33:28.340 --> 01:33:29.689 Ansgar Dietrichs: Obviously open to that. 575 01:33:33.830 --> 01:33:39.029 Ben Adams: I mean, to… say aloud what Barnabas said. So there's, like. 576 01:33:39.550 --> 01:33:46.089 Ben Adams: Things like removing broom filters, removing, you know, there's a lot of cleanup things that… 577 01:33:47.180 --> 01:33:51.869 Ben Adams: Should be complete… are very isolated and should be completely unaffected by… 578 01:33:52.050 --> 01:34:00.080 Ben Adams: In terms of testing and so forth for… 579 01:34:00.330 --> 01:34:02.180 Ben Adams: whether we do PQ or not. 580 01:34:02.340 --> 01:34:03.610 Ben Adams: I don't know if it's… 581 01:34:05.980 --> 01:34:08.200 Ben Adams: We can add them to the DevNet, it's small. 582 01:34:10.140 --> 01:34:12.829 Ansgar Dietrichs: Makes sense. Yeah, yeah, now we have… 583 01:34:12.830 --> 01:34:13.340 Ben Adams: Bye. 584 01:34:13.340 --> 01:34:18.770 Ansgar Dietrichs: We have 3 hands up and only 3 minutes left, so let's try to quickly get through all of them. Spencer? 585 01:34:20.600 --> 01:34:22.450 spencer: Hey, yeah, I guess, 586 01:34:22.610 --> 01:34:31.879 spencer: Just wanted to share my opinion really quick. So, I think my opinion relies, kind of on what the CL decides to do. If the CL ends up picking a PQ 587 01:34:32.420 --> 01:34:40.080 spencer: direction that ends up, being a lot later and moving later into next year, then on the EL. I would personally want us to… 588 01:34:41.060 --> 01:34:48.760 spencer: And focus on the minimal Hegota, primarily so we can put more of our attention on, what the EIP 589 01:34:49.110 --> 01:34:55.889 spencer: changes will actually affect on the app player, and really focus on, the users migrating, so we'd have, like, a smaller EL 590 01:34:56.680 --> 01:34:59.400 spencer: Hegota with the CL pre-registration. 591 01:34:59.750 --> 01:35:08.920 spencer: then all the EIPs that we don't consider, or that we don't add as a result of that, we would then push that, to the later CLPQ 592 01:35:09.070 --> 01:35:13.029 spencer: EF fork. But that's just, like, a general… 593 01:35:13.480 --> 01:35:19.910 spencer: that's, like, that was my feeling after Mumbai. I mean, things still need to be discussed, but that's, like, where my head is at, personally. 594 01:35:20.100 --> 01:35:26.609 spencer: Yeah, just so we can prioritize, really focusing on the downstream effects of frames, and the PQ EIPs. 595 01:35:28.430 --> 01:35:30.139 Ansgar Dietrichs: Yeah, makes sense, Ivan? 596 01:35:31.250 --> 01:35:44.710 Iván | ethrex: Yeah, I just want to quickly remind that we have this prioritization EIP list we agreed on in a few weeks earlier. Maybe we can revisit that and take a decision on ACD on what would we want to add on the next? 597 01:35:47.240 --> 01:35:54.069 Ansgar Dietrichs: Yeah, sounds good. I personally am very open to basically leaving this up to ACDT, but just having some sort of default position now. 598 01:35:54.200 --> 01:35:55.440 Ansgar Dietrichs: Stefan? 599 01:35:55.860 --> 01:36:12.669 Stefan Starflinger: Yeah, I just wanted to get some clarity, because before it was that we could add CFI EIPs to the DevNets, but now my understanding is that this is up in the air since last discussions, and EIPs need to be SFI before we can add them to a DEFNet. 600 01:36:12.750 --> 01:36:22.489 Stefan Starflinger: And I think we haven't decided on any SFIs on those EIPs yet, and I think we should spend time on that, I guess. Or maybe I'm missing something. 601 01:36:24.500 --> 01:36:31.040 Ansgar Dietrichs: Yeah, I mean, I think all of this… it's just because everything is up in the air right now a little bit, so… I think for the next… 602 01:36:31.280 --> 01:36:42.950 Ansgar Dietrichs: two-week cycle, we just will make a few preliminary decisions, so I don't think there's a process reason to not consider adding any extra EIPs. But then I would maybe, in the interest of time, we're at the end of the call. 603 01:36:43.150 --> 01:36:46.239 Ansgar Dietrichs: what I'm hearing is that I would say… 604 01:36:46.870 --> 01:37:01.789 Ansgar Dietrichs: we would leave the decision about adding EIPs to ACDT, but the expectation would be to mostly pause at the current level. If there is strong agreement on Monday, for example, to have, like, one or two of these cleanup EIPs. 605 01:37:01.850 --> 01:37:15.619 Ansgar Dietrichs: well, as I'm saying, one or two, that already sounds, so maybe one. If there's strong agreement to, for example, have one extra EIP or something, and have a new DevNet for that, that would be possible, so that's… this is not meant to block that, but the default expectation would be that we are 606 01:37:15.790 --> 01:37:28.890 Ansgar Dietrichs: for the next cycle, until we also know the CL side decisions better, that we would mostly pause at the current scope, if that works for everyone. Mario, last comment on this? 607 01:37:28.890 --> 01:37:37.119 Mario Vega: Yeah, so my… my worries is that perhaps we're not gaining more information before ACDT to make decisions, so is there… is there… 608 01:37:38.220 --> 01:37:44.179 Mario Vega: It's just that we don't have enough time today, or why are we deferring on deciding on DevNets? 609 01:37:45.210 --> 01:37:58.829 Ansgar Dietrichs: Yeah, I mean, it's… basically, the decision would for now be no UDevNet, but then, basically, it doesn't mean that it's blocked for the next full two weeks, so if basically, like, at some point on ACDT, Codex wants to revisit, if everyone agrees, now we are… we are willing to do more. 610 01:37:59.060 --> 01:38:03.359 Ansgar Dietrichs: Basically, it's not meant to necessarily block us for a full 2 weeks. 611 01:38:03.610 --> 01:38:10.809 Ansgar Dietrichs: yeah, I don't necessarily expect this to happen, I expect us to just… stay at the conscope, but… 612 01:38:11.820 --> 01:38:15.000 Barnabas: What is it saying that the current scope actually give us? 613 01:38:18.310 --> 01:38:24.689 Ansgar Dietrichs: it gives the testing team time to fully focus on the frame syndications and the mempool testing, I think is the argument, no? 614 01:38:28.430 --> 01:38:36.959 Barnabas: So we're gonna be blocking all the EL… EL Devs basically to… not iterated… On the current design? 615 01:38:39.690 --> 01:38:44.009 Barnabas: Like, I know that we are mainly here, limited by… 616 01:38:44.250 --> 01:38:51.019 Barnabas: the testing team, but I would just like to see some kind of progress being made and not, 617 01:38:51.420 --> 01:38:53.310 Barnabas: That stands still for 2 more weeks. 618 01:38:55.540 --> 01:38:56.300 Ansgar Dietrichs: Mario? 619 01:38:56.750 --> 01:39:01.240 Mario Vega: So my… my… I mean, it's not only that, I feel like we haven't decided on… 620 01:39:01.430 --> 01:39:12.699 Mario Vega: whether anything's gonna change here. I think we didn't decide on which option are we going to go with for Hegota in this call, so that's… that's the main reason, I feel, also, besides 621 01:39:13.000 --> 01:39:31.590 Mario Vega: I mean, we can push on testing, it's… it's fine, but the problem is that we have not decided if PQ is actually gonna change, or which… if we're gonna go with another option for PQ. That's my main concern of, like, just YOLO in another DevNet. But yeah, if there's appetite, I don't think we should… we should block it. 622 01:39:32.810 --> 01:39:49.530 Ansgar Dietrichs: Yeah, I think, really, then, purely because of time, not because of new information, but because of time, I think we can have that decision on ACDT. If there is appetite on ACDT to do new DevNets, I don't think there's a reason to block that. 623 01:39:49.790 --> 01:39:58.490 Ansgar Dietrichs: I wanted to just basically pre-align now, and if there would have been appetite to basically right now already decide on new DevNets, we could have done this, but it doesn't seem like there is right now. 624 01:39:58.760 --> 01:40:02.339 Ansgar Dietrichs: But this is not a block. ACD can go ahead with new DevNet if… 625 01:40:02.460 --> 01:40:08.299 Ansgar Dietrichs: If there's interest in that. Then I would say this is a good stopping point here. 626 01:40:08.430 --> 01:40:26.880 Ansgar Dietrichs: I just want to remind people, again, next week's ACDC as well, please go participate. Now, next week is actually, I think it's Thanksgiving in the US, if I'm not mistaken, so my understanding is that there will be… it will be a somewhat lighter call, at least lighter on the decision-making, more on discussion. 627 01:40:26.880 --> 01:40:35.300 Ansgar Dietrichs: And so then, maybe more decision-making on the CL side scope is more expected in 3 weeks, so do plan on participating in both of these calls. 628 01:40:36.250 --> 01:40:48.749 Ansgar Dietrichs: But yeah, and then on Monday's ACDT, also there will be some time spent on what can we learn from Glamsterdam and make sure to do better in Hegota and future fork. So I think that's also really important. 629 01:40:49.010 --> 01:40:51.069 Ansgar Dietrichs: Hope to see most of you there. 630 01:40:51.660 --> 01:40:55.310 Ansgar Dietrichs: And with that, ended here. Thank you all, and… 631 01:40:55.810 --> 01:40:57.580 Ansgar Dietrichs: Talk to you in two weeks. 632 01:40:57.700 --> 01:40:58.380 Ansgar Dietrichs: Bye. 633 01:40:59.680 --> 01:41:00.599 Andrew Ashikhmin: Thank you, bye. 634 01:41:00.600 --> 01:41:01.290 Antonio Sanso: Goodbye. 635 01:41:02.110 --> 01:41:02.660 Potuz: Bye-bye. 636 01:41:03.560 --> 01:41:04.569 Iván | ethrex: Thank you, Lee.