============== Item suppliers ============== Defines an item that can be purchased from a certain supplier. The association can be date effective and also has a priority. ===================== ================= =========================================================== Field Type Description ===================== ================= =========================================================== supplier supplier | Reference to the supplier. | This is a key field and a required attribute. item item | Reference to the item. | This is a key field and a required attribute. | The item can point to a parent level in the item hierarchy. The supplier can then be used for any item belonging to that group. location location | Reference to the location where the supplier can be used to purchase this item. | The default value of this field is empty. In such case the supplier is valid at any location. cost positive double Purchasing cost. leadtime duration Procurement lead time. size_minimum positive double | Minimum size for procurements. | The default is 1. size_multiple positive double | All procurements must be a multiple of this quantity. | The default is 0, i.e. no multiple to be considered. size_maximum positive double | Maximum size for procurements. | The default is infinite, i.e. no maximum to be considered. batchwindow duration | Allows to group proposed purchase orders within this window together into a single one. | The default is 7 days, i.e. the algorithm will not propose to buy the same item twice during the same week. hard_safety_leadtime duration | Adds additional time on top of the standard lead time. | This additional lead time is a hard constraint: material can only be used a certain time after the purchase order is received. This delay represents time for quality control, material reception, administrative time, etc... that cannot be reduced or skipped. | The default is 0. soft_safety_leadtime duration | Adds a safety lead time on top of standard lead time. | The soft safety lead time is a soft constraint: we try to receive the material this amount of time before the actual requirement date. But in case of shortages we can relax this and receive material closer to the requirement date. | The default is 0. effective_start dateTime Date when the record becomes valid. effective_end dateTime Date when the record becomes valid. resource resource | Optionally, it refers to a resource that represents the supplier capacity. | The referenced resource will typically be of type 'buckets'. resource_qty positive double | Resource capacity consumed per purchased unit. fence duration | Release fence for the distribution operation. | New shipments cannot be proposed within this time fence after the plan current date. priority integer | Priority of this supplier among all suppliers from which this item can be procured. | A lower number indicates that this supplier is preferred when the item is required. This field is used when the search policy is PRIORITIY. | When the priority is 0, the item supplier is not automatically used during planning. Only a planner can manually create purchase orders on it. ===================== ================= ===========================================================