Gen 0 / Gen 1 — Primary Controls
$20,000
per MW · per year
Equivalent to $1.67 / kW-month —
the format your buyers already use in pro formas
Unit Conversions
highlighted = lead externally
This pricing fits alongside
- Utility demand charges
- Capacity reservation fees
- Flexibility & controllable-load services
- Backup power contracts
- Uptime & resiliency fees
This is not
- A software subscription
- A generic SaaS annual fee
- A usage-based consumption charge
- An add-on to a hardware sale
Scale Economics — Annual MaaS ARR at $20,000 / MW / year
| Deployment |
MW |
kW |
Annual ARR |
| Q4 2026 PoC |
1.2 MW |
1,200 kW |
$24,000 / yr |
| American TerraWatt Project Zero Partner-Delivered |
20 MW |
20,000 kW |
$400,000 / yr |
| Early commercial |
50 MW |
50,000 kW |
$1,000,000 / yr |
| 100MW building block |
100 MW |
100,000 kW |
$2,000,000 / yr |
| Scale deployment |
500 MW |
500,000 kW |
$10,000,000 / yr |
| 1 GW installed base |
1,000 MW |
1,000,000 kW |
$20,000,000 / yr |
Every 100 MW deployed = $2M in near-pure-profit recurring revenue at 70%+ gross margins.
Generation 2 Pricing Trajectory
After early deployments validate performance, premium pricing is defensible relative to the costs
LoadCrest eliminates — delayed energization, utility upgrades, generator oversizing, stranded EPC capital,
and curtailment risk. Applying Gen 2 pricing to an existing 100 MW installed base grows ARR by
2–3× without adding a single new customer.
$3–$5
per kW · month (Gen 2 target)
$36K–$60K / MW / yr