### **Official Technical Document Introduction and Design Overview**
- This is the official technical documentation for the WRO Taiwan National Team, **"Fire On All Cylinders."**
- You can find hyperlinks to the technical report content and setup instructions here, provided for quick access by both learners and judges during study or evaluation.
- This technical document will feature a detailed table of contents structured **according to the official scoring criteria** (such as the engineering journal evaluation rubrics), with all section titles displayed as **hyperlinks**. This allows judges or learners to easily navigate to the key content of the technical documentation for **rapid and efficient evaluation**.
### **Autonomous Car Design: Key Upgrades and Iterations**
- This autonomous vehicle design is built upon the wealth of experience inherited from our **predecessor team ("Shinan-Fire-On-All-Cylinders")** and integrates the practical experience gained from our participation in the **World Final last year**. Not only have we **drawn lessons from the successful elements of last year's champion team**, but we have also implemented critical technical iterations:
* **Controller Upgrade:** The main controller has been upgraded from the standard **Jetson Nano** to the superior performance of the **Nvidia Jetson Orin Nano**.
* **Mechanical Overhaul:** We have reorganized and optimized the vehicle's mechanical components, focusing specifically on the **steering system** and the **chassis**.
* **Visual Enhancement:** Image processing capabilities have been significantly improved, achieving higher **efficiency and accuracy**.
The integration of all these upgrades and innovative design elements is aimed at **comprehensively enhancing the vehicle's overall performance and competitiveness**.
**Special Note:**
- Due to network speed fluctuations, some images may not display correctly. Should this occur, please try refreshing the page to resolve the issue.
#### [For Learners](learners_contents.md)
## Rubric for Judging Engineering Documentation
- ### ${{\color{red} Hardware Overview }} $
#### 1. Mobility Management
* [1-1 Vehicle 2D/3D Models in CAD](models/Vehicle_2D_3D/README.md)
* [1-2 Vehicle Chassis Design](schemes/Vehicle_Chassis_Design/README.md)
* [1-3 Motor Selection](schemes/Motor/README.md)
#### 2. Power and Sense Management
- __2-1 Vehicle Design__
- [2-1-1 BOM Pats List](schemes/Parts_List/README.md)
- [2-1-2 Circuit Design](models/Circuit_Design/README.md)
- [2-1-3 Hardware Fool-Proof Design](schemes/Fool-Proof-Design/README.md)
- [2-1-4 Assembly Instructions & Wiring Diagrams](schemes/Assembly_Instructions/README.md)
- __2-2 Power Management__
- [2-2-1 Battery choice for self-driving cars](schemes/Battery/README.md)
- [2-2-2 Power Supply System](schemes/Power_Supply_System/README.md)
- __2-3 Controller Selection__
- [2-3-1 Main Controller Comparison](schemes/Main_Controller_Choosing/README.md)
- [2-3-2 Motor & Sensor Intermediate I/O Controller Comparison](schemes/Motor_Sensor_Controller_Choosing/README.md)
- __2-4 Sense Management__
- [2-4-1 Ultrasonic rangefinder](schemes/HC-SR04/README.md)
- [2-4-2 Infrared Sensor](schemes/Infrared-Sensor/README.md)
- [2-4-3 Gyroscope orientation sensor](schemes/BNO055/README.md)
- [2-4-4 Camera Selection](schemes/Camera/README.md)
- ### ${{\color{red} Software Overview }} $
#### 3. Obstacle Management
- [3-1 Software Platform Construction](src/System_Platform_Software/README.md)
- [3-2 OpenCV Introduction](src/OpenCV/README.md)
- __3-3 Image Recognition Processing and Steering__
- [3-3-1 Image Recognition Processing](src/Image_Recognition_Processing/README.md)
- [3-3-2 Parking Lot Departure Steering Control Overview](src/Overview_of_Parking_Lot_Departure_Steering_Control/README.md)
- [3-3-3 Steering Control](src/Steering_Control/README.md)
- [3-3-4 Automatically record the LAB values of the field](src/Automatically_record_LAB/README.md)
- __3-4 Programming - Vehicle’s control program__
- [3-4-1 Open Challenge Code Overview](src/Programming/Open_Challenge/README.md)
- [3-4-2 Obstacle Challenge Code Overview](src/Programming/Obstacle_Challenge/README.md)
- [3-4-3 Vehicle Departure Procedure Guide](src/Vehicle_Departure_Procedure_Guide/README.md)
- [3-4-4 Vehicle Parking Procedure Guide](src/Vehicle_Parking_Procedure_Guide/README.md)
- __3-5 Remote Connection__
- [3-5-1 NoMachine software Introduction](other/NoMachine/README.md)
- ### ${{\color{red} Other}} $
#### 4. Pictures – Team and Vehicle
- [4-1 Team Members Introduction](t-photos/README.md)
- [4-2 Vehicle Photos](v-photos/README.md)
#### 5. Performance Videos - Challenge rounds
- [5-1 Open Challenge rounds](video/Open_Challenge/video.md)
- [5-2 Obstacle Challenge rounds](video/Obstacle_Challenge/video.md)
- [5-3 Self-Driving Car Design Process Video ](video/Design_Process_Video/video.md)
#### 6. GitHub Utilization-GitHub
- [6-1 GitHub Editing Tools Introduction (VScode Edit/GIT)](src/GitHub_Edit/README.md)
- [6-2 GitHub Web Editor Supported Markup Languages](src/GitHub_Languages/README.md)
#### 7. Engineering Factor
- [7-1 Learning Journey](other/Learning_Journey/README.md)
- [February](other/Learning_Journey/README.md#20250228--20250307)
- [March](other/Learning_Journey/README.md#20250308--20250321)
- [April](other/Learning_Journey/README.md#20250322--20250404)
- [May](other/Learning_Journey/README.md#20250426--20250502)
- [June](other/Learning_Journey/README.md#20250531--20250606)
- [July](other/Learning_Journey/README.md#20250628--20250704)
- [August](other/Learning_Journey/README.md#20250712--20250822)
- [September](other/Learning_Journey/README.md#20250830--20250905)
- [October](other/Learning_Journey/README.md#20250927--20251003)
- [November](other/Learning_Journey/README.md#20251101--20251107)