--- name: aposd-optimizing-critical-paths description: "Optimize performance through mandatory measure-first workflow with 3 stages: MEASURE (gate) -> FUNDAMENTAL FIX -> CRITICAL PATH REDESIGN. Use when code is too slow, laggy, hangs, doesn't scale, has timeouts, OOM errors, or high CPU/memory. Emphasize that simpler code usually runs faster. Triggers on: performance issues, optimization needed, takes forever, profiling. Produces profiling-backed optimization with verified improvement." --- # Skill: aposd-optimizing-critical-paths ## STOP - The Measure-First Rule **Don't optimize based on intuition—measure first.** Intuitions about performance are unreliable, even for experienced developers. **Stage 1 is a GATE:** You cannot proceed to optimization without actual profiling data. --- ## The Simplicity-Performance Relationship | Myth | Reality | |------|---------| | "Performance requires complexity" | Simpler code usually runs faster | | "Clean design sacrifices speed" | Clean design and high performance are compatible | | "Optimization means adding code" | Optimization often means removing code | **Why simplicity improves performance:** - Fewer special cases = no code to check for those cases - Deep classes = more work per call, fewer layer crossings - Each layer crossing adds overhead - Complicated code does extraneous or redundant work --- ## Expensive Operations Reference Know these costs when choosing between alternatives: | Operation | Cost | Context | |-----------|------|---------| | Network (datacenter) | 10–50 μs | Tens of thousands of instructions | | Network (wide-area) | 10–100 ms | Millions of instructions | | Disk I/O | 5–10 ms | Millions of instructions | | Flash storage | 10–100 μs | Thousands of instructions | | Dynamic memory allocation | Significant | malloc/new, freeing, GC overhead | | Cache miss | Few hundred cycles | Often determines overall performance | --- ## Performance Optimization Workflow ### Stage 1: Measurement First (MANDATORY GATE) ``` BEFORE making any performance changes: 1. MEASURE existing system behavior - Where does the system spend most time? - Not just "system is slow" — identify specific locations 2. IDENTIFY small number of very specific places - With ideas for improvement - Focus on what matters most 3. ESTABLISH baseline - You'll need this to verify improvements ``` **What counts as valid measurement:** - Actual profiling data (timing, call counts, memory usage) - Multiple runs to account for variance - Specific hotspot identification, not just "it's slow" **What does NOT count:** - "User said it's slow" (user perception ≠ bottleneck location) - Pattern-matching to Expensive Operations table - "This is obviously expensive" (intuition) - "I'll measure after I make the change" (confirmation bias) **⚠️ Stage 1 is a GATE, not a suggestion.** You cannot proceed to Stage 2 without completing measurement. **Performance Dimensions:** When measuring, identify WHICH dimension is the problem: - **Throughput:** Operations per second - **Latency:** Time per operation - **Memory:** Peak/average usage, allocation rate - **CPU:** Utilization percentage Different problems require different solutions. ### Stage 2: Look for Fundamental Fixes ``` FIRST, check for fundamental fixes (preferred over code tweaks): □ Can you add a cache? □ Can you use a different algorithm? (e.g., balanced tree vs. list) □ Can you bypass layers? (e.g., kernel bypass for networking) IF fundamental fix exists → implement using standard design techniques IF NOT → proceed to critical path redesign ``` ### Stage 3: Critical Path Redesign (Last Resort) ``` ONLY when no fundamental fix is available: 1. ASK: What is the smallest amount of code for the common case? 2. DISREGARD existing code structure entirely - Imagine writing a new method that implements JUST the critical path 3. IGNORE special cases in current code - Consider only data needed for critical path - Choose most convenient data structure 4. DEFINE "the ideal" - The simplest and fastest code assuming complete redesign freedom - Even if not practically achievable, it's your target 5. DESIGN the rest of the class around these critical paths ``` --- ## After Making Changes ``` 1. RE-MEASURE to verify measurable performance difference 2. EVALUATE the tradeoff: - Did changes provide significant speedup (with data)? → Keep - Did changes make system simpler AND at least as fast? → Keep - Neither? → BACK THEM OUT ``` **⚠️ "Simpler" alone is not enough.** You must verify the simpler version is at least as fast. --- ## Anti-Rationalization Table | Rationalization | Counter | |-----------------|---------| | "User said it's slow, that's my measurement" | User perception ≠ bottleneck location. Measure to find WHERE. | | "Looking at the table, this is obviously expensive" | Pattern-matching isn't profiling. Measure actual time. | | "I'll make the change then measure to verify" | Confirmation bias. Measure FIRST to find the real bottleneck. | | "Setting up profiling is too complex" | If you can't measure, you can't verify improvement. Do the work. | | "This scope is too small to measure" | Micro-optimizations without measurement add complexity for nothing. | | "I checked the fundamental fix checklist" | Checklist is for ideas AFTER measurement shows the bottleneck. | | "The code is simpler now, so it's faster" | Simpler doesn't automatically mean faster. Verify with measurement. | | "I found a red flag pattern" | Red flags are descriptive, not prescriptive. Measure if it's actually slow. | | "I already profiled extensively" | Share the data. Without data, it's still intuition. | --- ## Red Flags | Red Flag | Symptom | Performance Impact | |----------|---------|-------------------| | **Death by Thousand Cuts** | Many small inefficiencies everywhere | System 5–10x slower; no single fix helps | | **Pass-Through Methods** | Method with identical signature to caller | Unnecessary layer crossing overhead | | **Shallow Layers** | Multiple layers providing same abstraction | Each call adds overhead | | **Repeated Special Cases** | Same conditions checked multiple times | Redundant work on every call | | **Premature Optimization** | Optimizing without measurement | Adds complexity without verified benefit | | **Intuition-Based Changes** | "This should be faster" without data | Unreliable even for experts | --- ## Performance-Aware Development **Default approach during normal development:** 1. Develop awareness of fundamentally expensive operations 2. Choose naturally efficient alternatives when equally clean options exist 3. If performance turns out to be a problem, optimize later 4. **Exception:** Clear evidence performance is critical → implement faster approach immediately ### When to Optimize Immediately | Situation | Action | |-----------|--------| | Clear evidence performance is critical | Implement faster approach now | | Faster design adds only small, hidden complexity | May be worthwhile | | Faster design adds lot of complexity OR complicates interfaces | Start simple, optimize later | --- ## Consolidation Techniques When optimizing critical paths, look for ways to consolidate: | Technique | Example | |-----------|---------| | **Encode multiple conditions in single value** | Variable that is 0 when any of several special cases apply | | **Single test for multiple cases** | Replace 6 individual checks with 1 combined check | | **Combine layers into single method** | Critical path handled in one method, not three | | **Merge variables** | Combine multiple values into single structure | --- ## Quick Reference ``` PERFORMANCE OPTIMIZATION PRIORITY: 1. MEASURE (MANDATORY GATE) - Actual profiling data, not intuition - Identify which dimension: throughput, latency, memory, CPU - Establish baseline before any changes - No measurement = no optimization 2. FUNDAMENTAL FIX - Preferred approach - Cache? Better algorithm? Bypass layers? - Only consider AFTER measurement shows the bottleneck 3. CRITICAL PATH - Last resort - What's the minimum code for common case? - Disregard existing structure - Define "the ideal" 4. VERIFY - After changes - Re-measure with same methodology - Faster with data? Keep - Simpler AND at least as fast? Keep - Neither? BACK OUT THE RULE: Measure → Identify → Fix → Verify Never skip steps. Never assume. ``` --- ## Chain | After | Next | |-------|------| | Optimization done | Verify performance improved |