--- name: cwicr-work-breakdown description: "Break down CWICR work items into component resources. Decompose aggregate items, analyze resource composition, and generate detailed bills of resources." --- # CWICR Work Breakdown ## Business Case ### Problem Statement Work items in CWICR contain aggregated resources: - What materials make up a concrete work item? - What labor categories are needed? - What equipment is involved? - How to generate detailed resource bills? ### Solution Decompose CWICR work items into their constituent resources (labor, materials, equipment) with quantities and costs. ### Business Value - **Transparency** - See inside aggregated items - **Procurement** - Generate material lists - **Scheduling** - Identify resource needs - **Cost control** - Track resource consumption ## Technical Implementation ```python import pandas as pd import numpy as np from typing import Dict, Any, List, Optional, Tuple from dataclasses import dataclass, field from datetime import datetime from enum import Enum from collections import defaultdict class ResourceType(Enum): """Types of resources in work items.""" LABOR = "labor" MATERIAL = "material" EQUIPMENT = "equipment" OVERHEAD = "overhead" @dataclass class ResourceComponent: """Single resource component of a work item.""" resource_code: str resource_type: ResourceType description: str unit: str quantity_per_unit: float # Per unit of work item unit_rate: float cost_per_unit: float # Per unit of work item @dataclass class WorkItemBreakdown: """Complete breakdown of a work item.""" work_item_code: str work_item_description: str work_item_unit: str components: List[ResourceComponent] labor_cost_per_unit: float material_cost_per_unit: float equipment_cost_per_unit: float total_cost_per_unit: float @dataclass class BillOfResources: """Bill of resources for multiple work items.""" project_name: str total_labor_cost: float total_material_cost: float total_equipment_cost: float total_cost: float labor_resources: List[Dict[str, Any]] material_resources: List[Dict[str, Any]] equipment_resources: List[Dict[str, Any]] class CWICRWorkBreakdown: """Break down work items into resources.""" def __init__(self, cwicr_data: pd.DataFrame, resources_data: pd.DataFrame = None): self.work_items = cwicr_data self.resources = resources_data self._index_data() def _index_data(self): """Index data for fast lookup.""" if 'work_item_code' in self.work_items.columns: self._work_index = self.work_items.set_index('work_item_code') else: self._work_index = None if self.resources is not None and 'resource_code' in self.resources.columns: self._resource_index = self.resources.set_index('resource_code') else: self._resource_index = None def breakdown_work_item(self, work_item_code: str) -> Optional[WorkItemBreakdown]: """Break down single work item into components.""" if self._work_index is None or work_item_code not in self._work_index.index: return None item = self._work_index.loc[work_item_code] components = [] # Extract labor component labor_norm = float(item.get('labor_norm', 0) or 0) labor_rate = float(item.get('labor_rate', 35) or 35) labor_cost = float(item.get('labor_cost', labor_norm * labor_rate) or labor_norm * labor_rate) if labor_norm > 0: components.append(ResourceComponent( resource_code=f"{work_item_code}-LABOR", resource_type=ResourceType.LABOR, description=f"Labor for {item.get('description', '')}", unit="hr", quantity_per_unit=labor_norm, unit_rate=labor_rate, cost_per_unit=labor_cost )) # Extract material component material_norm = float(item.get('material_norm', 1) or 1) material_cost = float(item.get('material_cost', 0) or 0) if material_cost > 0: components.append(ResourceComponent( resource_code=f"{work_item_code}-MAT", resource_type=ResourceType.MATERIAL, description=str(item.get('material_description', 'Materials')), unit=str(item.get('material_unit', item.get('unit', 'ea'))), quantity_per_unit=material_norm, unit_rate=material_cost / material_norm if material_norm > 0 else material_cost, cost_per_unit=material_cost )) # Extract equipment component equipment_norm = float(item.get('equipment_norm', 0) or 0) equipment_rate = float(item.get('equipment_rate', 0) or 0) equipment_cost = float(item.get('equipment_cost', equipment_norm * equipment_rate) or 0) if equipment_norm > 0 or equipment_cost > 0: components.append(ResourceComponent( resource_code=f"{work_item_code}-EQUIP", resource_type=ResourceType.EQUIPMENT, description=str(item.get('equipment_description', 'Equipment')), unit="hr", quantity_per_unit=equipment_norm, unit_rate=equipment_rate, cost_per_unit=equipment_cost )) return WorkItemBreakdown( work_item_code=work_item_code, work_item_description=str(item.get('description', '')), work_item_unit=str(item.get('unit', '')), components=components, labor_cost_per_unit=labor_cost, material_cost_per_unit=material_cost, equipment_cost_per_unit=equipment_cost, total_cost_per_unit=labor_cost + material_cost + equipment_cost ) def generate_bill_of_resources(self, items: List[Dict[str, Any]], project_name: str = "Project") -> BillOfResources: """Generate bill of resources from work items.""" labor_agg = defaultdict(lambda: {'hours': 0, 'cost': 0, 'work_items': []}) material_agg = defaultdict(lambda: {'quantity': 0, 'cost': 0, 'unit': '', 'work_items': []}) equipment_agg = defaultdict(lambda: {'hours': 0, 'cost': 0, 'work_items': []}) for item in items: code = item.get('work_item_code', item.get('code')) qty = item.get('quantity', 0) breakdown = self.breakdown_work_item(code) if not breakdown: continue for component in breakdown.components: scaled_qty = component.quantity_per_unit * qty scaled_cost = component.cost_per_unit * qty if component.resource_type == ResourceType.LABOR: key = 'General Labor' # Could be more specific with skill data labor_agg[key]['hours'] += scaled_qty labor_agg[key]['cost'] += scaled_cost labor_agg[key]['work_items'].append(code) elif component.resource_type == ResourceType.MATERIAL: key = component.description material_agg[key]['quantity'] += scaled_qty material_agg[key]['cost'] += scaled_cost material_agg[key]['unit'] = component.unit material_agg[key]['work_items'].append(code) elif component.resource_type == ResourceType.EQUIPMENT: key = component.description equipment_agg[key]['hours'] += scaled_qty equipment_agg[key]['cost'] += scaled_cost equipment_agg[key]['work_items'].append(code) # Convert to lists labor_resources = [ { 'resource': name, 'hours': round(data['hours'], 1), 'cost': round(data['cost'], 2), 'work_items': len(set(data['work_items'])) } for name, data in labor_agg.items() ] material_resources = [ { 'resource': name, 'quantity': round(data['quantity'], 2), 'unit': data['unit'], 'cost': round(data['cost'], 2), 'work_items': len(set(data['work_items'])) } for name, data in material_agg.items() ] equipment_resources = [ { 'resource': name, 'hours': round(data['hours'], 1), 'cost': round(data['cost'], 2), 'work_items': len(set(data['work_items'])) } for name, data in equipment_agg.items() ] total_labor = sum(r['cost'] for r in labor_resources) total_material = sum(r['cost'] for r in material_resources) total_equipment = sum(r['cost'] for r in equipment_resources) return BillOfResources( project_name=project_name, total_labor_cost=round(total_labor, 2), total_material_cost=round(total_material, 2), total_equipment_cost=round(total_equipment, 2), total_cost=round(total_labor + total_material + total_equipment, 2), labor_resources=labor_resources, material_resources=material_resources, equipment_resources=equipment_resources ) def get_resource_composition(self, work_item_code: str) -> Dict[str, float]: """Get percentage composition of work item by resource type.""" breakdown = self.breakdown_work_item(work_item_code) if not breakdown or breakdown.total_cost_per_unit == 0: return {'labor': 0, 'material': 0, 'equipment': 0} total = breakdown.total_cost_per_unit return { 'labor': round(breakdown.labor_cost_per_unit / total * 100, 1), 'material': round(breakdown.material_cost_per_unit / total * 100, 1), 'equipment': round(breakdown.equipment_cost_per_unit / total * 100, 1) } def analyze_labor_intensity(self, work_items: List[str]) -> pd.DataFrame: """Analyze labor intensity of work items.""" data = [] for code in work_items: breakdown = self.breakdown_work_item(code) if breakdown: composition = self.get_resource_composition(code) labor_components = [c for c in breakdown.components if c.resource_type == ResourceType.LABOR] labor_hours = sum(c.quantity_per_unit for c in labor_components) data.append({ 'work_item_code': code, 'description': breakdown.work_item_description, 'labor_hours_per_unit': labor_hours, 'labor_cost_pct': composition['labor'], 'material_cost_pct': composition['material'], 'equipment_cost_pct': composition['equipment'], 'labor_intensive': composition['labor'] > 50 }) return pd.DataFrame(data).sort_values('labor_cost_pct', ascending=False) def export_breakdown(self, breakdown: WorkItemBreakdown, output_path: str) -> str: """Export single work item breakdown.""" df = pd.DataFrame([ { 'Resource Code': c.resource_code, 'Type': c.resource_type.value, 'Description': c.description, 'Unit': c.unit, 'Quantity/Unit': c.quantity_per_unit, 'Rate': c.unit_rate, 'Cost/Unit': c.cost_per_unit } for c in breakdown.components ]) df.to_excel(output_path, index=False) return output_path def export_bill_of_resources(self, bill: BillOfResources, output_path: str) -> str: """Export bill of resources to Excel.""" with pd.ExcelWriter(output_path, engine='openpyxl') as writer: # Summary summary_df = pd.DataFrame([{ 'Project': bill.project_name, 'Total Labor Cost': bill.total_labor_cost, 'Total Material Cost': bill.total_material_cost, 'Total Equipment Cost': bill.total_equipment_cost, 'Grand Total': bill.total_cost }]) summary_df.to_excel(writer, sheet_name='Summary', index=False) # Labor labor_df = pd.DataFrame(bill.labor_resources) labor_df.to_excel(writer, sheet_name='Labor', index=False) # Materials material_df = pd.DataFrame(bill.material_resources) material_df.to_excel(writer, sheet_name='Materials', index=False) # Equipment equipment_df = pd.DataFrame(bill.equipment_resources) equipment_df.to_excel(writer, sheet_name='Equipment', index=False) return output_path class ResourceAggregator: """Aggregate resources across work items.""" def __init__(self, breakdown_tool: CWICRWorkBreakdown): self.breakdown = breakdown_tool def aggregate_by_trade(self, items: List[Dict[str, Any]]) -> Dict[str, Dict[str, float]]: """Aggregate resources by trade/category.""" by_trade = defaultdict(lambda: {'labor_hours': 0, 'labor_cost': 0, 'items': 0}) for item in items: code = item.get('work_item_code', item.get('code')) qty = item.get('quantity', 0) # Extract trade from code prefix trade = code.split('-')[0] if '-' in code else 'General' breakdown = self.breakdown.breakdown_work_item(code) if breakdown: by_trade[trade]['labor_hours'] += breakdown.labor_cost_per_unit / 35 * qty # Estimate hours by_trade[trade]['labor_cost'] += breakdown.labor_cost_per_unit * qty by_trade[trade]['items'] += 1 return dict(by_trade) def identify_critical_resources(self, bill: BillOfResources, threshold_pct: float = 10) -> Dict[str, List[Dict]]: """Identify resources that contribute significantly to cost.""" critical = { 'labor': [], 'material': [], 'equipment': [] } # Labor for r in bill.labor_resources: if bill.total_labor_cost > 0: pct = r['cost'] / bill.total_labor_cost * 100 if pct >= threshold_pct: critical['labor'].append({**r, 'percentage': round(pct, 1)}) # Materials for r in bill.material_resources: if bill.total_material_cost > 0: pct = r['cost'] / bill.total_material_cost * 100 if pct >= threshold_pct: critical['material'].append({**r, 'percentage': round(pct, 1)}) # Equipment for r in bill.equipment_resources: if bill.total_equipment_cost > 0: pct = r['cost'] / bill.total_equipment_cost * 100 if pct >= threshold_pct: critical['equipment'].append({**r, 'percentage': round(pct, 1)}) return critical ``` ## Quick Start ```python # Load CWICR data cwicr = pd.read_parquet("ddc_cwicr_en.parquet") # Initialize breakdown tool breakdown = CWICRWorkBreakdown(cwicr) # Break down single item item_breakdown = breakdown.breakdown_work_item("CONC-001") print(f"Work Item: {item_breakdown.work_item_description}") print(f"Labor: ${item_breakdown.labor_cost_per_unit}") print(f"Material: ${item_breakdown.material_cost_per_unit}") print(f"Equipment: ${item_breakdown.equipment_cost_per_unit}") for comp in item_breakdown.components: print(f" - {comp.resource_type.value}: {comp.description}") ``` ## Common Use Cases ### 1. Bill of Resources ```python items = [ {'work_item_code': 'CONC-001', 'quantity': 150}, {'work_item_code': 'REBAR-002', 'quantity': 5000}, {'work_item_code': 'FORM-003', 'quantity': 300} ] bill = breakdown.generate_bill_of_resources(items, "Building A") print(f"Total Labor: ${bill.total_labor_cost:,.2f}") print(f"Total Material: ${bill.total_material_cost:,.2f}") ``` ### 2. Resource Composition ```python composition = breakdown.get_resource_composition("CONC-001") print(f"Labor: {composition['labor']}%") print(f"Material: {composition['material']}%") ``` ### 3. Labor Intensity Analysis ```python analysis = breakdown.analyze_labor_intensity(['CONC-001', 'EXCV-002', 'REBAR-003']) print(analysis) ``` ### 4. Export Report ```python breakdown.export_bill_of_resources(bill, "bill_of_resources.xlsx") ``` ## Resources - **GitHub**: [OpenConstructionEstimate-DDC-CWICR](https://github.com/datadrivenconstruction/OpenConstructionEstimate-DDC-CWICR) - **DDC Book**: Chapter 3.1 - Resource-Based Estimating