--- name: cognitive-load description: Assess and optimize team cognitive load using cognitive load theory. Use for team health analysis and workload optimization. allowed-tools: Read, Glob, Grep, Write, Skill, Task argument-hint: [--depth ] --- # /cognitive-load Command Assess and optimize cognitive load for a team using cognitive load theory. ## Usage ```bash /cognitive-load "payments team" /cognitive-load "platform team" depth=detailed /cognitive-load "all teams" depth=quick ``` ## Arguments | Argument | Required | Description | |----------|----------|-------------| | `team` | Yes | Team name or "all teams" for organization-wide | | `depth` | No | `quick` (scores only), `standard` (default), `detailed` (full analysis) | ## Depth Levels ### Quick Rapid assessment producing scores only: - Intrinsic, extraneous, germane scores - Total load and status indicator - One-line recommendation ### Standard (Default) Complete assessment with recommendations: - Full scores with breakdown - Factor-by-factor analysis - Prioritized recommendations - Comparison to healthy thresholds ### Detailed Comprehensive analysis with action plan: - All standard content - Root cause analysis for each factor - Specific action items with owners - Timeline for improvements - Success metrics - Follow-up assessment schedule ## Workflow ### Step 1: Load Cognitive Load Skill ```text Load: cognitive-load-assessment skill Purpose: Get assessment framework and questionnaire ``` ### Step 2: Gather Team Context Collect information about the team: **Team Profile:** - Team name and size - Team type (stream-aligned, platform, etc.) - Domain/bounded context owned - Services and systems owned - Duration team has been together **Current State:** - Recent changes or challenges - Known pain points - Delivery velocity trends - Team satisfaction indicators ### Step 3: Conduct Assessment If depth is `quick`: - Estimate scores based on available information - Return summary only If depth is `standard` or `detailed`: - Score each factor in all three load types - Document reasoning for each score - Identify highest-impact factors ### Step 4: Spawn Team Health Assessor (Detailed Only) For detailed assessments, delegate to `team-health-assessor` agent: ```text Task: Detailed cognitive load assessment for {team} Include: - Full factor analysis - Root cause identification - Action plan with timeline - Success metrics ``` ### Step 5: Generate Recommendations Prioritize recommendations by: 1. **Quick wins** - High impact, low effort (extraneous load) 2. **Strategic changes** - High impact, higher effort (intrinsic load) 3. **Investments** - Protect learning capacity (germane load) ## Output Format ### Quick Depth ```markdown # Cognitive Load: {Team Name} | Load Type | Score | Status | |-----------|-------|--------| | Intrinsic | {X}/25 | {🟢🟡🔴} | | Extraneous | {X}/25 | {🟢🟡🔴} | | Germane | {X}/25 | {🟢🟡🔴} | | **Total** | **{X}/75** | **{Status}** | **Recommendation:** {One-line action} ``` ### Standard Depth ```markdown # Cognitive Load Assessment: {Team Name} ## Summary | Load Type | Score | Status | Key Factor | |-----------|-------|--------|------------| | Intrinsic | {X}/25 | {🟢🟡🔴} | {Highest contributor} | | Extraneous | {X}/25 | {🟢🟡🔴} | {Highest contributor} | | Germane | {X}/25 | {🟢🟡🔴} | {Highest contributor} | | **Total** | **{X}/75** | **{Status}** | | **Interpretation:** {What this means for the team} ## Intrinsic Load (Domain Complexity): {X}/25 | Factor | Score | Notes | |--------|-------|-------| | Business domain complexity | {1-5} | {Details} | | Number of systems owned | {1-5} | {Details} | | Integration complexity | {1-5} | {Details} | | Stakeholder coordination | {1-5} | {Details} | | Compliance requirements | {1-5} | {Details} | **Analysis:** {Summary of intrinsic load} ## Extraneous Load (Waste): {X}/25 | Factor | Score | Notes | |--------|-------|-------| | Tooling/infrastructure friction | {1-5} | {Details} | | Manual processes | {1-5} | {Details} | | Technical debt burden | {1-5} | {Details} | | Waiting time for dependencies | {1-5} | {Details} | | Context switching frequency | {1-5} | {Details} | **Analysis:** {Summary of extraneous load - this is WASTE to eliminate} ## Germane Load (Learning): {X}/25 | Factor | Score | Notes | |--------|-------|-------| | New technology adoption rate | {1-5} | {Details} | | Process change frequency | {1-5} | {Details} | | Skill development demands | {1-5} | {Details} | | Innovation expectations | {1-5} | {Details} | | Documentation/training work | {1-5} | {Details} | **Analysis:** {Summary of germane load - this should be PROTECTED} ## Recommendations ### Reduce Extraneous Load (Priority) 1. {Action} - {Expected impact} 2. {Action} - {Expected impact} ### Manage Intrinsic Load 1. {Action} - {Expected impact} 2. {Action} - {Expected impact} ### Protect Germane Load 1. {Action} - {Expected impact} ## Next Steps - {Immediate action} - **Reassess:** {Recommended date} ``` ### Detailed Depth ```markdown # Comprehensive Cognitive Load Assessment: {Team Name} ## Executive Summary **Overall Status:** {🟢🟡🔴} {Status description} **Total Load:** {X}/75 **Risk Level:** {Low/Medium/High/Critical} **Recommended Actions:** {N} immediate, {N} short-term, {N} long-term ## Team Profile | Attribute | Value | |-----------|-------| | Team Size | {N} | | Team Type | {Type} | | Domain | {Bounded context} | | Services Owned | {List} | | Team Age | {Duration} | ## Load Analysis [Full standard depth content] ## Root Cause Analysis ### Intrinsic Load Drivers | Factor | Score | Root Cause | Impact | |--------|-------|------------|--------| | {Factor} | {Score} | {Why this is high} | {Effect on team} | ### Extraneous Load Sources | Factor | Score | Root Cause | Effort to Fix | |--------|-------|------------|---------------| | {Factor} | {Score} | {Source of waste} | {H/M/L} | ### Germane Load Pressures | Factor | Score | Root Cause | Sustainability | |--------|-------|------------|----------------| | {Factor} | {Score} | {Why learning load exists} | {Sustainable?} | ## Action Plan ### Immediate Actions (This Week) | Action | Owner | Success Metric | |--------|-------|----------------| | {Action} | {Who} | {How to measure} | ### Short-term Actions (This Quarter) | Action | Owner | Timeline | Success Metric | |--------|-------|----------|----------------| | {Action} | {Who} | {When} | {How to measure} | ### Long-term Actions (Next Quarter+) | Action | Owner | Timeline | Success Metric | |--------|-------|----------|----------------| | {Action} | {Who} | {When} | {How to measure} | ## Risk Assessment | Risk | Likelihood | Impact | Mitigation | |------|------------|--------|------------| | Team burnout | {H/M/L} | {H/M/L} | {Strategy} | | Delivery slowdown | {H/M/L} | {H/M/L} | {Strategy} | | Quality degradation | {H/M/L} | {H/M/L} | {Strategy} | ## Success Metrics | Metric | Current | Target | Timeline | |--------|---------|--------|----------| | Total cognitive load | {X}/75 | <45/75 | {Date} | | Extraneous load | {X}/25 | <10/25 | {Date} | | Team satisfaction | {Score} | {Target} | {Date} | | Delivery velocity | {Current} | {Target} | {Date} | ## Follow-up Schedule | Date | Assessment Type | Focus | |------|-----------------|-------| | {Date} | Quick | Extraneous load reduction | | {Date} | Standard | Full reassessment | | {Date} | Detailed | Quarterly review | ## Appendix ### Assessment Methodology [Brief description of cognitive load theory application] ### Scoring Rubric [Reference to cognitive-load-assessment skill] ### Team Member Input [Summary of any team feedback collected] ``` ## Scoring Guidelines ```text SCORING REFERENCE (per factor, 1-5): 1 = Minimal: Rarely an issue, well-managed 2 = Low: Occasional challenge, manageable 3 = Moderate: Regular challenge, noticeable impact 4 = High: Frequent challenge, significant impact 5 = Critical: Constant challenge, severe impact TOTAL LOAD INTERPRETATION: < 30: LOW LOAD - Team has capacity - Can take on new work - Good time for innovation 30-45: MODERATE LOAD - Sustainable workload - Normal operating range - Monitor for creep 45-60: HIGH LOAD - At risk of overload - Reduce extraneous immediately - Defer new commitments > 60: OVERLOADED - Unsustainable state - Immediate action required - Risk of burnout/turnover ``` ## Related Commands - `/team-structure` - Design overall team topology ## Related Skills - `cognitive-load-assessment` - Full methodology and questionnaire - `team-topologies` - Team type context --- **Last Updated:** 2025-12-26