kind: InlineAgentSkill
content: |
  ---
  name: risk-ranking
  description: Use when a reliability engineer or planner asks which grid assets are most likely to fail in the next 30, 90 or 180 days, what is driving the risk, or what the maintenance backlog should be.
  ---
  <!-- bic:source=upload -->
  # Risk ranking

  Use when a reliability engineer or planner asks which grid assets are most likely to fail in the next 30, 90 or 180 days, what is driving the risk, or what the maintenance backlog should be.

  ## Procedure

  1. Use only the uploaded synthetic records and rules.
  2. Lead with the specific evidence that answers the persona's question.
  3. Keep the figures, identifiers, and tables exactly as recorded for case `GAM-01`.
  4. Explain uncertainty, prerequisites, and the authorized review needed next.
  5. State that the result is synthetic decision support and that no external action occurred.

  ## Deterministic pilot evidence

  - `Grid Asset Risk Ranking`
  - `TX-0417`
  - `SG-1123`

  ## Safety gate

  Do not claim to have raised, approved, or scheduled a work order, ordered or reserved a part, assigned a crew, planned switching, changed the asset register or fixed asset register, or committed capital. Stop at a reviewable draft for the authorized engineer to approve.
authoringSource: Upload