kind: InlineAgentSkill
content: |
  ---
  name: aibast-transfer-plan
  description: Use when a supply chain manager asks for review-ready inter-warehouse move options.
  ---
  <!-- bic:source=blank -->
  # Proposed transfer plan

  ## Use

  Use when the user asks for proposed inter-warehouse moves in their own
  language. Route the exact locked persona prompt "Show me the proposed warehouse moves, but do not move or reserve anything." here. Route similar persona-language requests here rather than requiring the user to name an operation.

  ## Required inputs

  None required. If the user names a specific SKU or facility pair, scope the
  plan to it; otherwise propose transfers for every SKU with a material
  surplus-to-deficit pairing across the four facilities.

  ## Clarifying questions

  - If the user wants a plan for a specific SKU or lane only, confirm scope
    before producing the full multi-SKU plan.
  - If the user asks the agent to actually execute a move, clarify that this
    skill only prepares a proposal and that execution requires an authorized
    ERP/WMS owner using an approved production tool.

  ## Procedure

  1. Use only the facility-and-SKU synthetic snapshot and the cost-and-review
     rules knowledge sources (transfer-cost-per-kg matrix, SKU weights).
  2. Identify, per SKU, facilities with a material surplus (on-hand minus
     forecast > 200) and facilities with a material deficit (on-hand minus
     forecast < -200). Pair the largest surplus facility with the largest
     deficit facility first, moving the smaller of the two magnitudes, and
     repeat until surpluses or deficits are exhausted.
  3. For each proposed move, cite the SKU identifier (e.g. `SKU-4401`), the
     from/to facility, the proposed quantity, the SKU weight, and the
     estimated transfer cost (quantity × weight × the from/to per-kg rate
     from the cost-and-review rules knowledge source).
  4. Total the proposed units and total estimated transfer cost, and note the
     synthetic ground-freight planning assumption (2–5 business days).
  5. State explicitly and verbatim in the response that "No inventory has
     been reserved, picked, shipped, or moved" — this proposal is for
     inventory, warehouse, finance, and transportation review only.
  6. Separate the proposed moves (evidence-based estimate) from the
     recommendation to review with facility owners from the authorization
     gate required before any real transfer.
  7. State plainly that every quantity and cost figure is a synthetic
     planning estimate from a fixed snapshot, not a completed or scheduled
     shipment.

  ## Output

  A table of proposed SKU-level transfers (from, to, quantity, weight,
  estimated cost), total units and total estimated cost, and a closing
  statement that no inventory has been reserved, picked, shipped, or moved
  and that execution requires authorized ERP/WMS review.

  ## Safety boundary (no side effects)

  This skill never reserves, picks, ships, or moves inventory, and never
  changes a reorder point or other inventory policy — it only proposes.
  Any real transfer requires an authorized ERP/WMS system owner and an
  approved, connected production tool.

  ## Assumptions

  - Transfer pairing uses a simple largest-surplus-to-largest-deficit
    heuristic from the synthetic knowledge source; it is a planning
    illustration, not an optimized logistics solve.