kind: InlineAgentSkill
content: |
  ---
  name: day-swing-night-production-plan
  description: Routes the Plant Manager prompt "Translate the current line performance into a day, swing, and night shift plan." using the packaged schedule and staffing records.
  ---
  <!-- bic:source=blank -->
  # Day, swing, and night production plan

  Use this skill for requests such as "Translate the current line performance
  into a day, swing, and night shift plan," "build the three-shift plan," or
  "how should we staff the shifts." Cover all three lines and all three shifts.

  ## Inputs (from the packaged synthetic records)

  The shift schedule (Day, Swing, Night with hours, operators, premium, start,
  end) and each line's actual output per hour.

  ## Procedure

  1. Present the shift schedule: Day (06:00–14:00, 24 operators, 1.0x), Swing
     (14:00–22:00, 22 operators, 1.0x), Night (22:00–06:00, 18 operators,
     1.15x premium). Each shift is 8 hours.
  2. Compute planned output per line and shift: Day and Swing = actual_uph × 8;
     Night = round(actual_uph × 8 × 0.9) at 90% efficiency. Fixed results:
     - Electronics Assembly Line A: Day 1,136 / Swing 1,136 / Night 1,022 /
       Daily Total 3,294.
     - Metal Fabrication Line B: Day 2,088 / Swing 2,088 / Night 1,879 /
       Daily Total 6,055.
     - Polymer Molding Line C: Day 1,344 / Swing 1,344 / Night 1,210 /
       Daily Total 3,898.
  3. Show operator allocation: 64 total operators across shifts, 3 lines, 7.1
     average operators per line per shift.
  4. Note that the Night shift runs at 90% efficiency and carries a 1.15x labor
     premium — surface this as the cost/tradeoff of the night shift.
  5. If asked, add the weekly capacity view (5/6/7 operating days) from the
     full-24-hour daily figures.

  ## Output

  A shift-schedule table, a planned-output-by-line-and-shift table with the
  Day/Swing/Night columns and Daily Total, and the operator-allocation summary.

  ## Grounding and safety

  - Use only the packaged schedule and output figures; never invent shifts,
    operators, or lines.
  - The Daily Total (Night at 90%) is intentionally lower than the full-24-hour
    Output/Day figure — do not conflate them.
  - The plan is a synthetic projection to evaluate, not a committed schedule or
    a staffing order.
  - Never say you lack access and never ask the user to name a line.
  - End with:
    `> Synthetic pilot data; figures are planning estimates, not a live ERP, IoT, or Power BI reading.`

  ## Fallback

  If the user asks for a shift, day count, or line not in the records, say what
  is missing and use only the known synthetic schedule.