--- name: inspection-report-decoder description: "Decode a home inspection report into what's cosmetic, what's expensive, and what kills deals โ€” with repair-cost ranges and the negotiation list. Use when asked to decode my inspection report, is this inspection bad, what should I ask the seller to fix, or should I walk after inspection. Produces a findings triage (walk-risk / negotiate / cosmetic), cost ranges per item, the ask-the-seller list, and the questions for your inspector before the objection deadline." --- # Inspection Report Decoder Skill Inspection reports bury a $15,000 foundation note between forty comments about caulk โ€” everything is written in the same alarmed font. This skill triages: what threatens the deal, what's a negotiation line, what's Saturday-morning maintenance โ€” with cost ranges, because a finding without a number can't be negotiated. ## What This Skill Produces - **The triage** โ€” ๐Ÿ”ด walk-risk / ๐ŸŸก negotiate / ๐ŸŸข cosmetic-or-maintenance, every finding placed - **Cost ranges** โ€” order-of-magnitude repair estimates per meaningful finding, stated as ranges with the "get a specialist quote" flag where warranted - **The seller ask-list** โ€” repairs vs credits, ranked by leverage, with the deadline noted - **Inspector follow-ups** โ€” the questions to ask while you still can ## Required Inputs Ask for these only if not provided: - **The report** (paste the findings; photos' captions help) - **The deal context** โ€” price, market temperature (multiple offers?), objection/resolution deadline - **The house basics** โ€” age, region (cost ranges and typical failure modes vary), how long you plan to stay - **Your risk appetite** โ€” first home stretched thin vs experienced renovator changes the triage ## Framework 1. **The big five get found first:** foundation/structural movement, roof (age + active leaks), electrical (panel type, aluminum branch wiring), plumbing (supply material, sewer line), water intrusion/grading. Everything else waits. 2. **Cost ranges honestly:** wide ranges with the driver named ("panel replacement: low thousands; if service upgrade needed, more โ€” electrician quote required"). A specialist-quote flag beats a false-precision number. 3. **Age vs defect:** a 19-year-old roof on a 20-year design life is *pricing information*, not a defect the seller "hid" โ€” decode which findings are negotiation-legitimate vs already-in-the-price. 4. **Negotiate credits over repairs** where possible โ€” the seller's rushed contractor is nobody's friend; state the tradeoff. 5. **The deadline governs everything:** objection windows are short and expire silently; every recommendation carries the date. ## Output Format ### Inspection Decode: [address] โ€” objection deadline: [date] **The one-paragraph verdict:** proceed / negotiate hard / specialist-inspect before deciding / walk-risk present โ€” and why. **Triage table** | Finding (report ยง) | Plain English | Cost range | Tier | **๐Ÿšฉ The money findings** โ€” each: what it is, the realistic range, the driver, specialist-quote flag **The seller list** โ€” asks ranked by leverage: [credit/repair/price] with suggested wording **Ask your inspector** โ€” 3โ€“6 questions (verbal answers are often franker than the written report) **Budget reality** โ€” year-one likely spend if you buy as-is: [range] End verbatim: *"This is a plain-language reading, not a professional inspection, engineering, or legal opinion โ€” cost ranges are regional estimates; get specialist quotes for anything load-bearing before your objection deadline."* ## Quality Checks - [ ] Every finding is tiered โ€” none left floating in report-speak - [ ] Every ๐Ÿ”ด/๐ŸŸก carries a cost range with its driver named - [ ] Age-based findings are distinguished from defects - [ ] The objection deadline appears in the header and the asks - [ ] The disclaimer appears verbatim ## Anti-Patterns - [ ] Do not mirror the report's flat tone โ€” triage IS the value; forty equal alarms equal zero alarms - [ ] Do not price findings as points ("$8,500") โ€” ranges with drivers; false precision dies at the first quote - [ ] Do not treat every finding as seller-negotiable โ€” priced-in aging isn't a gotcha - [ ] Do not let ๐ŸŸข items pad the ask-list โ€” nickel lists cost credibility on the dollar items - [ ] Do not say walk/don't-walk for them โ€” surface the walk-risks, price the rest, hand the decision back ## Example Trigger Phrases - "Decode my inspection report." - "Is this inspection bad?" - "What should I ask the seller to fix?" - "Should I walk after inspection?"