CT-0:00:16 CU-0:00:00 CD-0:00:00 C10 Charging, Battery load test starting. CT-0:00:26 CU-0:00:00 CD-0:00:00 Battery1 LV12538mV, BV12480mV, CV12480mV, I1 2490mA ESR-PRE R23. CT-0:00:27 CU-0:00:00 CD-0:00:00 Battery1 Slope Voltage 12403mV. CT-0:00:35 CU-0:00:00 CD-0:00:00 Battery1 LV12480mV, BV12384mV, CV12147mV, SV19mV, I1 2490mA, I2 7750mA ESR R14 ESR-DELTA 243. CT-0:00:35 CU-0:00:00 CD-0:00:00 C7 Charging, Battery load test complete. CT-0:00:39 CU-0:00:00 CD-0:00:00 C11 Charging, Battery load test return. CT-0:00:39 CU-0:00:00 CD-0:00:00 Battery 2 BC R2 Running, Starting Battery Check. CT-0:00:40 CU-0:00:00 CD-0:00:00 Resetting Charge Controller on Battery 2, Absorp Current 000mA, End Amps 2700mA. CT-0:00:47 CU-0:00:00 CD-0:00:00 C10 Charging, Battery load test starting. CT-0:00:57 CU-0:00:00 CD-0:00:00 Battery2 LV12466mV, BV12388mV, CV12388mV, I1 2470mA ESR-PRE R31. CT-0:00:57 CU-0:00:00 CD-0:00:00 Battery2 Slope Voltage 12310mV. CT-0:01:06 CU-0:00:00 CD-0:00:00 Battery2 LV12388mV, BV12290mV, CV11436mV, SV20mV, I1 2470mA, I2 7660mA ESR R22 ESR-DELTA 169. CT-0:01:06 CU-0:00:00 CD-0:00:00 C7 Charging, Battery load test complete. CT-0:01:10 CU-0:00:00 CD-0:00:00 C11 Charging, Battery load test return. CT: Runtime clock from boot time CU: Uptime charge cycle CD: Downtime charge cycle Voltages: LV: unloaded voltage in the ESR-PRE first test, first load voltage on the second test BV: Battery voltage at the battery terminals CV: Charge Controller voltage, not used in ESR routines Slope Voltage: Battery Voltage about 1 second after the second load switched on. SV: The voltage change from 1 second into the second test until just before the loads are switched off. For the discharge slope. I1: first load current I2: first and second load currents ESR-PRE: ESR baseline with first load only, mainly used for ESR DELTA EST: Battery Bank ESR from the completed test using two-tier testing. EST-DELTA: A ESR change value used for SOC calculations.