"type": "FeatureCollection",
"name": "transmission_lines",
"crs": { "type": "name", "properties": { "name": "urn:ogc:def:crs:OGC:1.3:CRS84" } },
"features": [
{ "type": "Feature", "properties": { "from": "AFG-XX", "to": "IRN-XX", "existing capacity + (mw)": 175.0, "existing capacity - (mw)": -175.0, "planned capacity + (mw)": 325.0, "planned capacity - (mw)": -325.0, "year planned": null, "assumptions/applied methods": "It's reported that as of 2022 trade potential between both countries is set at 175 MW with plans existing to boost electricity exchange to a capacity of 500-600 MW. The planned capacities (no year mentioned) are therefore set at 500 MW (lower end estimate) minus the existing 175 MW  = 325 MW.", "other notes": null, "source existing (2023)": "https://www.tehrantimes.com/news/468852/Iran-exporting-110MW-of-electricity-to-Afghanistan", "source planned": "https://www.tehrantimes.com/news/468852/Iran-exporting-110MW-of-electricity-to-Afghanistan", "existing": 0.175, "planned": 0.325, "start_lat": 33.82888193, "start_lon": 66.03059453, "end_lat": 32.56443671, "end_lon": 54.30450996, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 66.03059453, 33.82888193 ], [ 54.30450996, 32.56443671 ] ] } },
{ "type": "Feature", "properties": { "from": "AFG-XX", "to": "TKM-XX", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -400.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Currently a trade agreement of 400 MW for unilateral flow from Turkmenistan to Afghanistan is in place although the respective lines fulfilling this agreement are not always operational. Construction is underway for a 1000 MW 500 kV line between both countries. ", "source existing (2023)": "https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf", "source planned": "https://pajhwok.com/2023/01/29/power-supply-project-from-turkmenistan-be-completed-soon/", "existing": 0.2, "planned": 1.0, "start_lat": 33.82888193, "start_lon": 66.03059453, "end_lat": 39.19174394, "end_lon": 59.18221565, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 66.03059453, 33.82888193 ], [ 59.18221565, 39.19174394 ] ] } },
{ "type": "Feature", "properties": { "from": "ARE-XX", "to": "OMN-XX", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "A new link between Oman and Saudi Arabia is being planned but no mentioning as of now for new links to the Emirates.", "source existing (2023)": "https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B", "source planned": "https://www.zawya.com/en/projects/utilities/omans-power-imports-to-hit-1600-mw-with-second-interconnect-dkrmxp8m", "existing": 0.4, "planned": 0.0, "start_lat": 23.9073357, "start_lon": 54.33630075, "end_lat": 20.56072435, "end_lon": 56.09089168, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 54.33630075, 23.9073357 ], [ 56.09089168, 20.56072435 ] ] } },
{ "type": "Feature", "properties": { "from": "ARE-XX", "to": "SAU-XX", "existing capacity + (mw)": 900.0, "existing capacity - (mw)": -900.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B", "source planned": "https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/", "existing": 0.9, "planned": 0.0, "start_lat": 23.9073357, "start_lon": 54.33630075, "end_lat": 24.12153053, "end_lon": 44.54466797, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 54.33630075, 23.9073357 ], [ 44.54466797, 24.12153053 ] ] } },
{ "type": "Feature", "properties": { "from": "ARM-XX", "to": "GEO-XX", "existing capacity + (mw)": 200.0, "existing capacity - (mw)": -200.0, "planned capacity + (mw)": 350.0, "planned capacity - (mw)": -350.0, "year planned": 2025.0, "assumptions/applied methods": "Assumed power factor of 1 by converting MVA into MW.", "other notes": "There's mentioning of another 1000 MVA of planned capacity 'in later stages' but there doesn't seem to be concrete plans for this as of yet.", "source existing (2023)": "https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf", "source planned": "https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf", "existing": 0.2, "planned": 0.35, "start_lat": 40.29403906, "start_lon": 44.93871008, "end_lat": 42.17608505, "end_lon": 43.5193205, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 44.93871008, 40.29403906 ], [ 43.5193205, 42.17608505 ] ] } },
{ "type": "Feature", "properties": { "from": "ARM-XX", "to": "IRN-XX", "existing capacity + (mw)": 350.0, "existing capacity - (mw)": -350.0, "planned capacity + (mw)": 850.0, "planned capacity - (mw)": -850.0, "year planned": 2025.0, "assumptions/applied methods": "Assumed power factor of 1 by converting MVA into MW. The Armenia 2022 Energy Policy Review report by the IEA mentions that MVA is expected to increase from 350 to 1200 by 2025 hence assumed planned capacity is 1200-350 = 850 MVA/MW. ", "other notes": null, "source existing (2023)": "https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf", "source planned": "https://iea.blob.core.windows.net/assets/8328cc7c-e65e-4df1-a96f-514fdd0ac31e/Armenia2022EnergyPolicyReview.pdf", "existing": 0.35, "planned": 0.85, "start_lat": 40.29403906, "start_lon": 44.93871008, "end_lat": 32.56443671, "end_lon": 54.30450996, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 44.93871008, 40.29403906 ], [ 54.30450996, 32.56443671 ] ] } },
{ "type": "Feature", "properties": { "from": "BGD-XX", "to": "IND-EA", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": null, "assumptions/applied methods": null, "other notes": "A 765 kV Double Circuit transmission project is being reviewed by the respective authorities in Bangladesh and India (Katihar-Parbatipur-Baranagar 765 KV high power interconnection transmission line project) yet as of now this is in early stages. No mentioning of expected transmission capacity in MW terms nor any expected completion year.", "source existing (2023)": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "source planned": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "existing": 1.0, "planned": null, "start_lat": 23.91907958, "start_lon": 90.27936877, "end_lat": 22.5675, "end_lon": 88.37, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 90.27936877, 23.91907958 ], [ 88.37, 22.5675 ] ] } },
{ "type": "Feature", "properties": { "from": "BGD-XX", "to": "IND-NE", "existing capacity + (mw)": 160.0, "existing capacity - (mw)": -160.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "source planned": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "existing": 0.16, "planned": 0.0, "start_lat": 23.91907958, "start_lon": 90.27936877, "end_lat": 26.1722, "end_lon": 91.7458, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 90.27936877, 23.91907958 ], [ 91.7458, 26.1722 ] ] } },
{ "type": "Feature", "properties": { "from": "BTN-XX", "to": "IND-EA", "existing capacity + (mw)": 1980.0, "existing capacity - (mw)": 0.0, "planned capacity + (mw)": 2220.0, "planned capacity - (mw)": 0.0, "year planned": 2025.0, "assumptions/applied methods": "The Ministry of Power of the government of India mentions that the power transfer between Bhutan and India by 2024-2025 is expected to increase to 4200 MW. The transfer capacity is used to export electricity from Bhutan's hydro facilities. The assumed unidirectional planned capacity therefore is 4200 MW - 1980 MW = 2220 MW.", "other notes": null, "source existing (2023)": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "source planned": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "existing": 0.99, "planned": 1.11, "start_lat": 27.39601669, "start_lon": 90.42771481, "end_lat": 22.5675, "end_lon": 88.37, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 90.42771481, 27.39601669 ], [ 88.37, 22.5675 ] ] } },
{ "type": "Feature", "properties": { "from": "IDN-JW", "to": "IDN-NU", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -400.0, "planned capacity + (mw)": 1600.0, "planned capacity - (mw)": -1600.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Indicated transfer limit of 2000 MW between Bali and Java as of 2020 following the IESR study, however following the 2021-2030 National Electricity Supply Business Plan of the Indonesian government the new 500 kv, 220 km, 1600 MW project is still marked as in development with no indicated final completetion year. Existing capacity is therefore considered to be 400 MW.", "source existing (2023)": "https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf", "source planned": "https://iesr.or.id/wp-content/uploads/2019/04/COMS-PUB-0021_A-Roadmap-for-Indonesia_s-Power-Sector.pdf", "existing": 0.4, "planned": 1.6, "start_lat": -7.299365156, "start_lon": 109.9417746, "end_lat": -8.631496711, "end_lon": 117.8575357, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 109.9417746, -7.299365156 ], [ 117.8575357, -8.631496711 ] ] } },
{ "type": "Feature", "properties": { "from": "IDN-KA", "to": "MYS-SK", "existing capacity + (mw)": 230.0, "existing capacity - (mw)": -230.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No new planned projects visible within the the 2021-2030 The National Electricity Supply Business Plan of the Indonesian government.", "source existing (2023)": "https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343", "source planned": "https://iopscience.iop.org/article/10.1088/1755-1315/997/1/012011/pdf", "existing": 0.23, "planned": 0.0, "start_lat": -0.211017293, "start_lon": 113.9952202, "end_lat": 2.599364914, "end_lon": 113.3362267, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.9952202, -0.211017293 ], [ 113.3362267, 2.599364914 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-EA", "to": "IND-NE", "existing capacity + (mw)": 2860.0, "existing capacity - (mw)": -2860.0, "planned capacity + (mw)": 670.0, "planned capacity - (mw)": -670.0, "year planned": 2023.0, "assumptions/applied methods": "670 MW planned transmission capacity is for the 'Birpara/Alipurduar - Salakati 220kV D/c' and 'Siliguri - Bongaigaon 400kV D/c' projects which involves upgrades/modifications of existing lines with assumed later completion year of 2023 (2022-2023 estimate in ISTS Rolling Plan).", "other notes": null, "source existing (2023)": "https://www.powergrid.in/", "source planned": "https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf", "existing": 2.86, "planned": 0.67, "start_lat": 22.5675, "start_lon": 88.37, "end_lat": 26.1722, "end_lon": 91.7458, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 88.37, 22.5675 ], [ 91.7458, 26.1722 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-EA", "to": "IND-NO", "existing capacity + (mw)": 22530.0, "existing capacity - (mw)": -22530.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.powergrid.in/", "source planned": "https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf", "existing": 22.53, "planned": 0.0, "start_lat": 22.5675, "start_lon": 88.37, "end_lat": 28.50206713, "end_lon": 76.73261986, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 88.37, 22.5675 ], [ 76.73261986, 28.50206713 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-EA", "to": "IND-SO", "existing capacity + (mw)": 7830.0, "existing capacity - (mw)": -7830.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.powergrid.in/", "source planned": "https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf", "existing": 7.83, "planned": 0.0, "start_lat": 22.5675, "start_lon": 88.37, "end_lat": 14.52920535, "end_lon": 78.11796277000001, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 88.37, 22.5675 ], [ 78.11796277, 14.52920535 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-EA", "to": "IND-WE", "existing capacity + (mw)": 21190.0, "existing capacity - (mw)": -21190.0, "planned capacity + (mw)": 1600.0, "planned capacity - (mw)": -1600.0, "year planned": 2025.0, "assumptions/applied methods": "1600 MW planned transmission capacity is for the 'Jeypore - Jagdalpur 400 kV D/c' project with assumed later completion year of 2025 (2024-2025 estimate in ISTS Rolling Plan).", "other notes": null, "source existing (2023)": "https://www.powergrid.in/", "source planned": "https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf", "existing": 21.19, "planned": 1.6, "start_lat": 22.5675, "start_lon": 88.37, "end_lat": 21.6937639, "end_lon": 76.78466634, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 88.37, 22.5675 ], [ 76.78466634, 21.6937639 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-NE", "to": "MMR-XX", "existing capacity + (mw)": 3.0, "existing capacity - (mw)": -3.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Additional transmission capacity between IND and MMR is considered, with extensions to THA, to among others facilitate trade between India and South-East Asia. No concrete plans as of yet to be found.", "source existing (2023)": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "source planned": "https://www.reuters.com/business/energy/india-aims-trade-electricity-with-southeast-asia-sources-2023-07-21/", "existing": 0.003, "planned": 0.0, "start_lat": 26.1722, "start_lon": 91.7458, "end_lat": 21.20596974, "end_lon": 96.51828802, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 91.7458, 26.1722 ], [ 96.51828802, 21.20596974 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-NE", "to": "IND-NO", "existing capacity + (mw)": 3000.0, "existing capacity - (mw)": -3000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.powergrid.in/", "source planned": "https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf", "existing": 3.0, "planned": 0.0, "start_lat": 26.1722, "start_lon": 91.7458, "end_lat": 28.50206713, "end_lon": 76.73261986, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 91.7458, 26.1722 ], [ 76.73261986, 28.50206713 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-SO", "to": "IND-WE", "existing capacity + (mw)": 18120.0, "existing capacity - (mw)": -18120.0, "planned capacity + (mw)": 4200.0, "planned capacity - (mw)": -4200.0, "year planned": 2024.0, "assumptions/applied methods": "4200 MW planned transmission capacity is for the 'Warora Pool - Warangal (New) 765kV D/c' project with assumed later completion year of 2024 (2023-2024 estimate in ISTS Rolling Plan).", "other notes": null, "source existing (2023)": "https://www.powergrid.in/", "source planned": "https://www.ctuil.in/uploads/annual_rolling_plan/168302068523ISTS%20Rolling%20plan%202027-28%20-%20Printable%20version.pdf", "existing": 18.12, "planned": 4.2, "start_lat": 14.52920535, "start_lon": 78.11796277000001, "end_lat": 21.6937639, "end_lon": 76.78466634, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 78.11796277, 14.52920535 ], [ 76.78466634, 21.6937639 ] ] } },
{ "type": "Feature", "properties": { "from": "KHM-XX", "to": "THA-XX", "existing capacity + (mw)": 230.0, "existing capacity - (mw)": -230.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": null, "assumptions/applied methods": null, "other notes": "A new 500 kV line between the Cambodian-Thai border to the Battambang substation (Cambodia) is being studied, but delays in its development means that as of yet there is no defined expected completion year nor detailed information on potential transmission capacity.", "source existing (2023)": "https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343", "source planned": "https://www.phnompenhpost.com/business/studies-500kv-transmission-line-drag", "existing": 0.23, "planned": null, "start_lat": 12.71265457, "start_lon": 104.9186366, "end_lat": 15.110827, "end_lon": 101.0143276, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 104.9186366, 12.71265457 ], [ 101.0143276, 15.110827 ] ] } },
{ "type": "Feature", "properties": { "from": "KHM-XX", "to": "VNM-SO", "existing capacity + (mw)": 200.0, "existing capacity - (mw)": -200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new potential lines between Cambodia and Vietnam in Vietnam's Power Development Plan VIII.", "source existing (2023)": "https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343", "source planned": "https://xaydungchinhsach.chinhphu.vn/toan-van-quy-hoach-phat-trien-dien-luc-quoc-gia-11923051616315244.htm", "existing": 0.2, "planned": 0.0, "start_lat": 12.71265457, "start_lon": 104.9186366, "end_lat": 10.46765412, "end_lon": 106.0879568, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 104.9186366, 12.71265457 ], [ 106.0879568, 10.46765412 ] ] } },
{ "type": "Feature", "properties": { "from": "LAO-XX", "to": "THA-XX", "existing capacity + (mw)": 5427.0, "existing capacity - (mw)": -5427.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "A MOU exists between both countries to aim for a total export of 9000 MW from Laos to Thailand by 2030, however exact projects to faciliate these numbers have not been been specificied. The JICA report indicates that Thailand's autorities expect an increase in import of 700 MW every two years from all neighbouring countries combined (but not exactly how much from Laos). Furthermore, complicating factors such as ecology concerns affect the speed at which new hydro developments (and resulting imports) can be commissioned. Thailand's Power Purchase Plan 2023 which should be released soon might provide more insights on expected transmission developments on the short to medium term, however as of yet no concrete plans/values can be found so no new planned capacity has been added.", "other notes": null, "source existing (2023)": "https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343", "source planned": "https://openjicareport.jica.go.jp/pdf/12328027_01.pdf", "existing": 5.427, "planned": 0.0, "start_lat": 18.49689545, "start_lon": 103.7665453, "end_lat": 15.110827, "end_lon": 101.0143276, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.7665453, 18.49689545 ], [ 101.0143276, 15.110827 ] ] } },
{ "type": "Feature", "properties": { "from": "LAO-XX", "to": "VNM-CE", "existing capacity + (mw)": 538.0, "existing capacity - (mw)": 0.0, "planned capacity + (mw)": 2036.0, "planned capacity - (mw)": 0.0, "year planned": 2025.0, "assumptions/applied methods": "Following Table 6.2-12 and Table 6.2-13 in the JICA report, 2574 MW (970+869+735) of generating capacity (mostly hydro) is designated for export purposes to VNMCE by latest 2025 including transmission developments to support said exports. We assume that this equals the available transmission capacity by 2025 - the already existing 538 MW.  Given that these developments are specifically marked for export purposes with lines running from specific powerplants we assume that available transmission capacity is solely unidirectional. A MOU exists between both countries to export 5000 MW from Laos to Vietnam by 2030, however it is not specified to which parts of Vietnam this export is expected nor the status of developments post 2025 hence beyond the 2025 values we do not include any additional planned capacities.", "other notes": null, "source existing (2023)": "https://onlinelibrary.wiley.com/doi/epdf/10.1111/apv.12343", "source planned": "https://openjicareport.jica.go.jp/pdf/12328027_01.pdf", "existing": 0.269, "planned": 1.018, "start_lat": 18.49689545, "start_lon": 103.7665453, "end_lat": 15.16043104, "end_lon": 107.3954149, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.7665453, 18.49689545 ], [ 107.3954149, 15.16043104 ] ] } },
{ "type": "Feature", "properties": { "from": "PHL-LU", "to": "PHL-VI", "existing capacity + (mw)": 440.0, "existing capacity - (mw)": -440.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.researchgate.net/publication/261876281_A_Guide_to_Operational_Impact_Analysis_of_Variable_Renewables_Application_to_the_Philippines", "source planned": null, "existing": 0.44, "planned": 0.0, "start_lat": 15.94914896, "start_lon": 121.4213815, "end_lat": 10.02795288, "end_lon": 123.0046285, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 121.4213815, 15.94914896 ], [ 123.0046285, 10.02795288 ] ] } },
{ "type": "Feature", "properties": { "from": "AFG-XX", "to": "TJK-XX", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -350.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Following the specifics of the CASA-1000 project in the IEA report, the HVDC link from TJK to PAK will only transit through AFG (with transit charges) but not for power supply between TJK and AFG. New line is far in development, but finalization is stalled due to political unrest in Afghanistan hence for now we did not add any planned capacities. Existing capacity is set to be 300 + 50 MW of unilateral capacity for exports from TJK to PAK (Table 3 IEA report). ", "other notes": null, "source existing (2023)": "https://www.chathamhouse.org/sites/default/files/CHHJ7132-Afghanistan-Regional-Engagement-RP-WEB.pdf", "source planned": "https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf", "existing": 0.175, "planned": 0.0, "start_lat": 33.82888193, "start_lon": 66.03059453, "end_lat": 38.52714131, "end_lon": 71.03844325, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 66.03059453, 33.82888193 ], [ 71.03844325, 38.52714131 ] ] } },
{ "type": "Feature", "properties": { "from": "AFG-XX", "to": "UZB-XX", "existing capacity + (mw)": 450.0, "existing capacity - (mw)": -450.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "New 500 kv transmission line (1000 MW, 260 km) is far in development, but finalization is stalled due to political unrest in Afghanistan hence for now we did not add any new planned capacities. Furthermore, the UNECE report indicates two existing 220 kV lines between AFG and UZB with 449 MVA each yet other reports indicate a max trade of 450 MW hence we assume the latter.", "other notes": null, "source existing (2023)": "https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf", "source planned": "https://eurasianet.org/uzbekistan-begins-building-power-line-to-afghanistan", "existing": 0.45, "planned": 0.0, "start_lat": 33.82888193, "start_lon": 66.03059453, "end_lat": 41.75204379, "end_lon": 63.16537477, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 66.03059453, 33.82888193 ], [ 63.16537477, 41.75204379 ] ] } },
{ "type": "Feature", "properties": { "from": "JPN-CE", "to": "JPN-KY", "existing capacity + (mw)": 520.0, "existing capacity - (mw)": -2780.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan", "source planned": "https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar", "existing": 1.65, "planned": 0.0, "start_lat": 34.6939, "start_lon": 135.5022, "end_lat": 33.5833, "end_lon": 130.4, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 135.5022, 34.6939 ], [ 130.4, 33.5833 ] ] } },
{ "type": "Feature", "properties": { "from": "JPN-CE", "to": "JPN-SH", "existing capacity + (mw)": 2600.0, "existing capacity - (mw)": -2600.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Existing capacity consists of 1400 MW capacity between Shikoku and Kansai (Energies paper) and 1200 MW between Shikoku and Chugoku (IEEE Electrical Insulation Magazine paper).", "source existing (2023)": "https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan", "source planned": "https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar", "existing": 2.6, "planned": 0.0, "start_lat": 34.6939, "start_lon": 135.5022, "end_lat": 33.8333, "end_lon": 132.7667, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 135.5022, 34.6939 ], [ 132.7667, 33.8333 ] ] } },
{ "type": "Feature", "properties": { "from": "JPN-CE", "to": "JPN-TO", "existing capacity + (mw)": 2100.0, "existing capacity - (mw)": -2100.0, "planned capacity + (mw)": 900.0, "planned capacity - (mw)": -900.0, "year planned": 2028.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan", "source planned": "https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar", "existing": 2.1, "planned": 0.9, "start_lat": 34.6939, "start_lon": 135.5022, "end_lat": 35.6897, "end_lon": 139.6922, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 135.5022, 34.6939 ], [ 139.6922, 35.6897 ] ] } },
{ "type": "Feature", "properties": { "from": "JPN-HO", "to": "JPN-TO", "existing capacity + (mw)": 900.0, "existing capacity - (mw)": -900.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": 2028.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.researchgate.net/publication/350792071_Analysis_of_PV_Subsidy_Schemes_Installed_Capacity_and_Their_Electricity_Generation_in_Japan", "source planned": "https://www.renewable-ei.org/pdfdownload/activities/TsutomuOyama_220906_REI-DK_Seminar", "existing": 0.9, "planned": 0.3, "start_lat": 43.0667, "start_lon": 141.35, "end_lat": 35.6897, "end_lon": 139.6922, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 141.35, 43.0667 ], [ 139.6922, 35.6897 ] ] } },
{ "type": "Feature", "properties": { "from": "VNM-CE", "to": "VNM-NO", "existing capacity + (mw)": 2200.0, "existing capacity - (mw)": -2200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Planned capacity in 2025 is assumed to equal the reported planned capacity by 2025 minus existing values in 2020.", "other notes": null, "source existing (2023)": "https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx", "source planned": "https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx", "existing": 2.2, "planned": 0.0, "start_lat": 15.16043104, "start_lon": 107.3954149, "end_lat": 21.71658413, "end_lon": 105.0669191, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 107.3954149, 15.16043104 ], [ 105.0669191, 21.71658413 ] ] } },
{ "type": "Feature", "properties": { "from": "VNM-CE", "to": "VNM-SO", "existing capacity + (mw)": 12000.0, "existing capacity - (mw)": -7500.0, "planned capacity + (mw)": 3500.0, "planned capacity - (mw)": -2500.0, "year planned": 2025.0, "assumptions/applied methods": "Planned capacity in 2025 is assumed to equal the reported planned capacity by 2025 minus existing values in 2020.", "other notes": null, "source existing (2023)": "https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx", "source planned": "https://en.evn.com.vn/d6/news/Development-of-500-kV-transmission-network-in-the-future-a-questionable-issue-66-163-2065.aspx", "existing": 9.75, "planned": 3.0, "start_lat": 15.16043104, "start_lon": 107.3954149, "end_lat": 10.46765412, "end_lon": 106.0879568, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 107.3954149, 15.16043104 ], [ 106.0879568, 10.46765412 ] ] } },
{ "type": "Feature", "properties": { "from": "AZE-XX", "to": "IRN-XX", "existing capacity + (mw)": 670.0, "existing capacity - (mw)": -670.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf", "source planned": null, "existing": 0.67, "planned": 0.0, "start_lat": 40.35265159, "start_lon": 47.66265475, "end_lat": 32.56443671, "end_lon": 54.30450996, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 47.66265475, 40.35265159 ], [ 54.30450996, 32.56443671 ] ] } },
{ "type": "Feature", "properties": { "from": "BHR-XX", "to": "SAU-XX", "existing capacity + (mw)": 600.0, "existing capacity - (mw)": -600.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": "https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/", "existing": 0.6, "planned": 0.0, "start_lat": 26.05278085, "start_lon": 50.54011116, "end_lat": 24.12153053, "end_lon": 44.54466797, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 50.54011116, 26.05278085 ], [ 44.54466797, 24.12153053 ] ] } },
{ "type": "Feature", "properties": { "from": "DZA-XX", "to": "ESP-XX", "existing capacity + (mw)": 2000.0, "existing capacity - (mw)": -2000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S2096511718300033", "source planned": null, "existing": 2.0, "planned": 0.0, "start_lat": 28.15777049, "start_lon": 2.676939699, "end_lat": 40.38997543, "end_lon": -3.553604515, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.676939699, 28.15777049 ], [ -3.553604515, 40.38997543 ] ] } },
{ "type": "Feature", "properties": { "from": "DZA-XX", "to": "MAR-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S2096511718300033", "source planned": null, "existing": 1.4, "planned": 0.0, "start_lat": 28.15777049, "start_lon": 2.676939699, "end_lat": 31.84740337, "end_lon": -6.276188993, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.676939699, 28.15777049 ], [ -6.276188993, 31.84740337 ] ] } },
{ "type": "Feature", "properties": { "from": "EGY-XX", "to": "JOR-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.3, "planned": 0.0, "start_lat": 26.56948837, "start_lon": 29.7825875, "end_lat": 31.24465371, "end_lon": 36.78638995, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 29.7825875, 26.56948837 ], [ 36.78638995, 31.24465371 ] ] } },
{ "type": "Feature", "properties": { "from": "EGY-XX", "to": "LBY-XX", "existing capacity + (mw)": 240.0, "existing capacity - (mw)": -240.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.eia.gov/international/analysis/country/LBY", "source planned": "https://www.eia.gov/international/analysis/country/LBY", "existing": 0.24, "planned": 0.5, "start_lat": 26.56948837, "start_lon": 29.7825875, "end_lat": 27.04054556, "end_lon": 18.03095756, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 29.7825875, 26.56948837 ], [ 18.03095756, 27.04054556 ] ] } },
{ "type": "Feature", "properties": { "from": "ESP-XX", "to": "MAR-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S2096511718300033", "source planned": null, "existing": 1.4, "planned": 0.0, "start_lat": 40.38997543, "start_lon": -3.553604515, "end_lat": 31.84740337, "end_lon": -6.276188993, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -3.553604515, 40.38997543 ], [ -6.276188993, 31.84740337 ] ] } },
{ "type": "Feature", "properties": { "from": "ETH-XX", "to": "KEN-XX", "existing capacity + (mw)": 2000.0, "existing capacity - (mw)": -2000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.ketraco.co.ke/transmission/projects/completed/eastern-electricity-highway-project-eehp-kenya-ethiopia", "source planned": null, "existing": 2.0, "planned": 0.0, "start_lat": 8.629030994000001, "start_lon": 39.62473654, "end_lat": 0.554886619, "end_lon": 37.84485847, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 39.62473654, 8.629030994 ], [ 37.84485847, 0.554886619 ] ] } },
{ "type": "Feature", "properties": { "from": "ETH-XX", "to": "SDN-XX", "existing capacity + (mw)": 4000.0, "existing capacity - (mw)": -4000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.au-pida.org/view-project/312/", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 8.629030994000001, "start_lon": 39.62473654, "end_lat": 16.04849354, "end_lon": 30.00544151, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 39.62473654, 8.629030994 ], [ 30.00544151, 16.04849354 ] ] } },
{ "type": "Feature", "properties": { "from": "IRN-XX", "to": "IRQ-XX", "existing capacity + (mw)": 1500.0, "existing capacity - (mw)": -1500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf", "source planned": null, "existing": 1.5, "planned": 0.0, "start_lat": 32.56443671, "start_lon": 54.30450996, "end_lat": 33.04686876, "end_lon": 43.77542139, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 54.30450996, 32.56443671 ], [ 43.77542139, 33.04686876 ] ] } },
{ "type": "Feature", "properties": { "from": "IRN-XX", "to": "PAK-XX", "existing capacity + (mw)": 70.0, "existing capacity - (mw)": -70.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf", "source planned": null, "existing": 0.07, "planned": 0.0, "start_lat": 32.56443671, "start_lon": 54.30450996, "end_lat": 29.97775866, "end_lon": 69.40188454, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 54.30450996, 32.56443671 ], [ 69.40188454, 29.97775866 ] ] } },
{ "type": "Feature", "properties": { "from": "IRN-XX", "to": "TKM-XX", "existing capacity + (mw)": 380.0, "existing capacity - (mw)": -380.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": null, "assumptions/applied methods": null, "other notes": "New HVDC back-to-back connection between IRN and TKM is being planned yet no expected commissioning year has been found.", "source existing (2023)": "https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf", "source planned": "https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf", "existing": 0.38, "planned": 0.5, "start_lat": 32.56443671, "start_lon": 54.30450996, "end_lat": 39.19174394, "end_lon": 59.18221565, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 54.30450996, 32.56443671 ], [ 59.18221565, 39.19174394 ] ] } },
{ "type": "Feature", "properties": { "from": "IRN-XX", "to": "TUR-XX", "existing capacity + (mw)": 490.0, "existing capacity - (mw)": -490.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.cigre.org/userfiles/files/Community/NC/2018_National-power-system_Iran.pdf", "source planned": null, "existing": 0.49, "planned": 0.0, "start_lat": 32.56443671, "start_lon": 54.30450996, "end_lat": 38.98806237, "end_lon": 35.4354723, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 54.30450996, 32.56443671 ], [ 35.4354723, 38.98806237 ] ] } },
{ "type": "Feature", "properties": { "from": "IRQ-XX", "to": "SYR-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.3, "planned": 0.0, "start_lat": 33.04686876, "start_lon": 43.77542139, "end_lat": 35.02410544, "end_lon": 38.52742311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 43.77542139, 33.04686876 ], [ 38.52742311, 35.02410544 ] ] } },
{ "type": "Feature", "properties": { "from": "IRQ-XX", "to": "TUR-XX", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.4, "planned": 0.0, "start_lat": 33.04686876, "start_lon": 43.77542139, "end_lat": 38.98806237, "end_lon": 35.4354723, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 43.77542139, 33.04686876 ], [ 35.4354723, 38.98806237 ] ] } },
{ "type": "Feature", "properties": { "from": "ISR-XX", "to": "JOR-XX", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -20.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": -600.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.gov.il/en/departments/news/press_081122", "source planned": "https://www.gov.il/en/departments/news/press_081122", "existing": 0.01, "planned": 0.3, "start_lat": 31.45930346, "start_lon": 35.013543, "end_lat": 31.24465371, "end_lon": 36.78638995, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 35.013543, 31.45930346 ], [ 36.78638995, 31.24465371 ] ] } },
{ "type": "Feature", "properties": { "from": "JOR-XX", "to": "SYR-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.3, "planned": 0.0, "start_lat": 31.24465371, "start_lon": 36.78638995, "end_lat": 35.02410544, "end_lon": 38.52742311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 36.78638995, 31.24465371 ], [ 38.52742311, 35.02410544 ] ] } },
{ "type": "Feature", "properties": { "from": "KWT-XX", "to": "SAU-XX", "existing capacity + (mw)": 1200.0, "existing capacity - (mw)": -1200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": "https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/", "existing": 1.2, "planned": 0.0, "start_lat": 29.32632288, "start_lon": 47.57777269, "end_lat": 24.12153053, "end_lon": 44.54466797, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 47.57777269, 29.32632288 ], [ 44.54466797, 24.12153053 ] ] } },
{ "type": "Feature", "properties": { "from": "LBN-XX", "to": "SYR-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.5, "planned": 0.0, "start_lat": 33.92106874, "start_lon": 35.8924699, "end_lat": 35.02410544, "end_lon": 38.52742311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 35.8924699, 33.92106874 ], [ 38.52742311, 35.02410544 ] ] } },
{ "type": "Feature", "properties": { "from": "LBR-XX", "to": "SLE-XX", "existing capacity + (mw)": 406.0, "existing capacity - (mw)": -406.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://cdn.gihub.org/umbraco/media/2519/gih-showcase-projects-2019-cslg-interconnector-project-art-web.pdf", "source planned": null, "existing": 0.406, "planned": 0.0, "start_lat": 6.444476181, "start_lon": -9.306557763000001, "end_lat": 8.564590122, "end_lon": -11.78090775, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -9.306557763, 6.444476181 ], [ -11.78090775, 8.564590122 ] ] } },
{ "type": "Feature", "properties": { "from": "LBY-XX", "to": "TUN-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.3, "planned": 0.0, "start_lat": 27.04054556, "start_lon": 18.03095756, "end_lat": 34.11186824, "end_lon": 9.573402185000001, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 18.03095756, 27.04054556 ], [ 9.573402185, 34.11186824 ] ] } },
{ "type": "Feature", "properties": { "from": "LSO-XX", "to": "ZAF-XX", "existing capacity + (mw)": 230.0, "existing capacity - (mw)": -230.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://doi.org/10.17159/2413-3051/2018/v29i4a5581", "source planned": null, "existing": 0.23, "planned": 0.0, "start_lat": -29.58297691, "start_lon": 28.24551731, "end_lat": -28.99669244, "end_lon": 25.08613403, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 28.24551731, -29.58297691 ], [ 25.08613403, -28.99669244 ] ] } },
{ "type": "Feature", "properties": { "from": "QAT-XX", "to": "SAU-XX", "existing capacity + (mw)": 750.0, "existing capacity - (mw)": -750.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.irena.org/-/media/Files/IRENA/Agency/Events/2013/Nov/9_1/Africa-CEC-session-5_Regulation-and-Supervision-Bureau_Brownson_230613.pdf?la=en&hash=23FDA42825C3C85A750B6973EB4E1FA74CCFFD5B", "source planned": "https://reglobal.org/saudi-arabia-strengthens-transmission-ties-with-neighbours/", "existing": 0.75, "planned": 0.0, "start_lat": 25.28418816, "start_lon": 51.19163867, "end_lat": 24.12153053, "end_lon": 44.54466797, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 51.19163867, 25.28418816 ], [ 44.54466797, 24.12153053 ] ] } },
{ "type": "Feature", "properties": { "from": "SYR-XX", "to": "TUR-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://www.arabfund.org/default.aspx?pageId=454", "source planned": null, "existing": 0.3, "planned": 0.0, "start_lat": 35.02410544, "start_lon": 38.52742311, "end_lat": 38.98806237, "end_lon": 35.4354723, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 38.52742311, 35.02410544 ], [ 35.4354723, 38.98806237 ] ] } },
{ "type": "Feature", "properties": { "from": "OMN-XX", "to": "SAU-XX", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -400.0, "planned capacity + (mw)": 1200.0, "planned capacity - (mw)": -1200.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.enerdata.net/publications/daily-energy-news/oman-and-saudi-arabia-mull-develop-12-gw-power-interconnector.html", "source planned": "https://renewablewatch.in/2023/08/30/transmission-ties-saudi-arabias-regional-connections/", "existing": 0.4, "planned": 1.2, "start_lat": 20.56072435, "start_lon": 56.09089168, "end_lat": 24.12153053, "end_lon": 44.54466797, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 56.09089168, 20.56072435 ], [ 44.54466797, 24.12153053 ] ] } },
{ "type": "Feature", "properties": { "from": "TJK-XX", "to": "UZB-XX", "existing capacity + (mw)": 850.0, "existing capacity - (mw)": -850.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf", "source planned": "https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf", "existing": 0.85, "planned": 0.0, "start_lat": 38.52714131, "start_lon": 71.03844325, "end_lat": 41.75204379, "end_lon": 63.16537477, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 71.03844325, 38.52714131 ], [ 63.16537477, 41.75204379 ] ] } },
{ "type": "Feature", "properties": { "from": "TKM-XX", "to": "UZB-XX", "existing capacity + (mw)": 850.0, "existing capacity - (mw)": -850.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No information on new planned capacity found", "source existing (2023)": "https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf", "source planned": "https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf", "existing": 0.85, "planned": 0.0, "start_lat": 39.19174394, "start_lon": 59.18221565, "end_lat": 41.75204379, "end_lon": 63.16537477, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 59.18221565, 39.19174394 ], [ 63.16537477, 41.75204379 ] ] } },
{ "type": "Feature", "properties": { "from": "ARG-XX", "to": "BOL-XX", "existing capacity + (mw)": 120.0, "existing capacity - (mw)": -120.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": null, "assumptions/applied methods": "Assumed that the reported distance from Inspenet.com is the correct distance for the operational line.", "other notes": null, "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "existing": 0.12, "planned": null, "start_lat": -35.18533553, "start_lon": -65.1410162, "end_lat": -16.71661931, "end_lon": -64.657991, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -65.1410162, -35.18533553 ], [ -64.657991, -16.71661931 ] ] } },
{ "type": "Feature", "properties": { "from": "ARG-XX", "to": "CHL-XX", "existing capacity + (mw)": 200.0, "existing capacity - (mw)": -200.0, "planned capacity + (mw)": 2135.0, "planned capacity - (mw)": -2135.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No planned conmpletion years could be found for any of the planned interconnections.", "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "existing": 0.2, "planned": 2.135, "start_lat": -35.18533553, "start_lon": -65.1410162, "end_lat": -35.29686404, "end_lon": -71.22329283000001, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -65.1410162, -35.18533553 ], [ -71.22329283, -35.29686404 ] ] } },
{ "type": "Feature", "properties": { "from": "ARG-XX", "to": "PRY-XX", "existing capacity + (mw)": 3320.0, "existing capacity - (mw)": -3310.0, "planned capacity + (mw)": 270.0, "planned capacity - (mw)": -270.0, "year planned": 2026.0, "assumptions/applied methods": "Assumed that all planned connections had the higher planned power and voltage.", "other notes": null, "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "existing": 3.315, "planned": 0.27, "start_lat": -35.18533553, "start_lon": -65.1410162, "end_lat": -23.24452279, "end_lon": -58.39119134, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -65.1410162, -35.18533553 ], [ -58.39119134, -23.24452279 ] ] } },
{ "type": "Feature", "properties": { "from": "ARG-XX", "to": "URY-XX", "existing capacity + (mw)": 3890.0, "existing capacity - (mw)": -3890.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "existing": 3.89, "planned": 0.0, "start_lat": -35.18533553, "start_lon": -65.1410162, "end_lat": -32.79622178, "end_lon": -56.01834601, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -65.1410162, -35.18533553 ], [ -56.01834601, -32.79622178 ] ] } },
{ "type": "Feature", "properties": { "from": "AUS-QL", "to": "AUS-SW", "existing capacity + (mw)": 1478.0, "existing capacity - (mw)": -1167.0, "planned capacity + (mw)": 900.0, "planned capacity - (mw)": -730.0, "year planned": 2030.0, "assumptions/applied methods": "For existing capacity it is assumed that interconnector capacity was the higher value provided in a range. Existing capacity includes upgrades to the GLD-NSW 330 kV interconnector increasing the power rating of the interconnector. For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. A 'Medium' lead time equals 6-7 years post final publication year (2024) hence assumed 2030 as commissioning year.", "other notes": null, "source existing (2023)": "https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf", "source planned": "https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en", "existing": 1.3225, "planned": 0.815, "start_lat": -27.4678, "start_lon": 153.0281, "end_lat": -33.8678, "end_lon": 151.21, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 153.0281, -27.4678 ], [ 151.21, -33.8678 ] ] } },
{ "type": "Feature", "properties": { "from": "AUS-SA", "to": "AUS-VI", "existing capacity + (mw)": 700.0, "existing capacity - (mw)": -820.0, "planned capacity + (mw)": 1640.0, "planned capacity - (mw)": -1640.0, "year planned": 2031.0, "assumptions/applied methods": "For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. A 'Long' lead time equals 7 years post final publication year (2024) hence assumed 2031 as commissioning year.", "other notes": null, "source existing (2023)": "https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf", "source planned": "https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en", "existing": 0.76, "planned": 1.64, "start_lat": -34.9275, "start_lon": 138.6, "end_lat": -37.8142, "end_lon": 144.9631, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 138.6, -34.9275 ], [ 144.9631, -37.8142 ] ] } },
{ "type": "Feature", "properties": { "from": "AUS-SW", "to": "AUS-VI", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 1669.0, "planned capacity - (mw)": -1935.0, "year planned": 2029.0, "assumptions/applied methods": "For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised.", "other notes": null, "source existing (2023)": "https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en", "source planned": "https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en", "existing": 0.7, "planned": 1.802, "start_lat": -33.8678, "start_lon": 151.21, "end_lat": -37.8142, "end_lon": 144.9631, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 151.21, -33.8678 ], [ 144.9631, -37.8142 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-AB", "to": "CAN-BC", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No new planned lines visible on BC hydro transmission map.", "source existing (2023)": "https://www.lawsonlundell.com/media/news/241_BC-AlbertaIntertie.pdf", "source planned": "https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/maps/transplt-Default-001.pdf", "existing": 1.1, "planned": 0.0, "start_lat": 51.05, "start_lon": -114.067, "end_lat": 49.25, "end_lon": -123.1, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.067, 51.05 ], [ -123.1, 49.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-AB", "to": "CAN-SK", "existing capacity + (mw)": 150.0, "existing capacity - (mw)": -150.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines between Alberta and Saskatchewan in AESO Long-term Transmission Plan 2022.", "source existing (2023)": "https://www.atco.com/en-ca/projects/mcneill-hvdc-link.html", "source planned": "https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf", "existing": 0.15, "planned": 0.0, "start_lat": 51.05, "start_lon": -114.067, "end_lat": 52.1333, "end_lon": -106.683, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.067, 51.05 ], [ -106.683, 52.1333 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-AR", "to": "CAN-NL", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No further plans as of now for expansion beyond the currently operational Maritime link. ", "source existing (2023)": "https://www.hitachienergy.com/us/en/about-us/customer-success-stories/maritime-link#:~:text=The%20Maritime%20Link%20Project%20is,American%20grid%20in%20Nova%20Scotia.", "source planned": null, "existing": 0.5, "planned": 0.0, "start_lat": 44.6475, "start_lon": -63.5906, "end_lat": 47.4817, "end_lon": -52.7971, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -63.5906, 44.6475 ], [ -52.7971, 47.4817 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-MB", "to": "CAN-SK", "existing capacity + (mw)": 350.0, "existing capacity - (mw)": -350.0, "planned capacity + (mw)": 100.0, "planned capacity - (mw)": -100.0, "year planned": 2023.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.saskpower.com/about-us/media-information/news-releases/2022/SaskPower-seeking-to-expand-transmission-capacity-with-the-Southwest-Power-Pool#:~:text=SaskPower's%20grid%20is%20also%20interconnected,290%20MW%20in%20June%202022.", "source planned": "https://www.gov.mb.ca/sd/eal/registries/5950birtle/Proposal/executivesummary.pdf", "existing": 0.35, "planned": 0.1, "start_lat": 49.8844, "start_lon": -97.1464, "end_lat": 52.1333, "end_lon": -106.683, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -97.1464, 49.8844 ], [ -106.683, 52.1333 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-NL", "to": "CAN-QC", "existing capacity + (mw)": 5150.0, "existing capacity - (mw)": 0.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Existing lines are solely for import of electricity from the Churchill Falls hydro facilities. As of yet no new lines/projects planned with the agreement on the current import of electricity running untill 2041.", "source existing (2023)": "http://www.oasis.oati.com/hqt/index.html", "source planned": "https://globalnews.ca/news/9508822/quebec-newfoundland-labrador-hydroelectricity-talks/", "existing": 2.575, "planned": 0.0, "start_lat": 47.4817, "start_lon": -52.7971, "end_lat": 45.5089, "end_lon": -73.5617, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -52.7971, 47.4817 ], [ -73.5617, 45.5089 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-ON", "to": "CAN-QC", "existing capacity + (mw)": 2082.0, "existing capacity - (mw)": -2750.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed that the overall capacities are the higher winter limits given IESO system documentation.", "other notes": "No evidence for new planned projects with the exception of a 600 MW firm capacity trading agreement starting in 2026. This does not involve the construction of new tielines. ", "source existing (2023)": "https://docs2.cer-rec.gc.ca/ll-eng/llisapi.dll/fetch/2000/90466/94151/402424/3006476/3006474/A78621%2D5_B%2D2%2D1_Description_Ont_Transmission_System_%2D_A5E0C9.pdf?nodeid=3011599&vernum=-2", "source planned": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2021/Ontario-Transmission-Interfaces-and-Interties-Overview.ashx", "existing": 2.416, "planned": 0.0, "start_lat": 43.7417, "start_lon": -79.3733, "end_lat": 45.5089, "end_lon": -73.5617, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -79.3733, 43.7417 ], [ -73.5617, 45.5089 ] ] } },
{ "type": "Feature", "properties": { "from": "COL-XX", "to": "ECU-XX", "existing capacity + (mw)": 363.0, "existing capacity - (mw)": -363.0, "planned capacity + (mw)": 1500.0, "planned capacity - (mw)": -1500.0, "year planned": null, "assumptions/applied methods": "Assumed that the Ipiales - Tulcan interconnection is 113 MW (higher given value) instead of 35 MW.", "other notes": "No completion year to be found for the planned Jamondino - El Inga interconnection.", "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "existing": 0.363, "planned": 1.5, "start_lat": 3.898761446, "start_lon": -73.07812436, "end_lat": -1.448030964, "end_lon": -78.37794735, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -73.07812436, 3.898761446 ], [ -78.37794735, -1.448030964 ] ] } },
{ "type": "Feature", "properties": { "from": "COL-XX", "to": "VEN-XX", "existing capacity + (mw)": 380.0, "existing capacity - (mw)": -380.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed that all three interconnectors that are currently not operational will become operational again due to renewed relationships between both countries.", "other notes": "According to CIER currently no newly planned interconnectors.", "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "existing": 0.38, "planned": 0.0, "start_lat": 3.898761446, "start_lon": -73.07812436, "end_lat": 7.127130493, "end_lon": -66.15124644, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -73.07812436, 3.898761446 ], [ -66.15124644, 7.127130493 ] ] } },
{ "type": "Feature", "properties": { "from": "ECU-XX", "to": "PER-XX", "existing capacity + (mw)": 100.0, "existing capacity - (mw)": -100.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -550.0, "year planned": 2024.0, "assumptions/applied methods": "Assumed capacities for the newly planned 500 kV line equals the reported maximum directional flow in 2024 (600 MW ECU - PER, 650 MW PER - ECU) - the existing capacities (100 MW). ", "other notes": null, "source existing (2023)": "https://www.cier.org/es-uy/Lists/EstadisticasLD/MapaInterconexiones.pdf", "source planned": "https://www.sciencedirect.com/science/article/pii/S0378779623000809", "existing": 0.1, "planned": 0.525, "start_lat": -1.448030964, "start_lon": -78.37794735, "end_lat": -9.171978521, "end_lon": -74.35867892, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -78.37794735, -1.448030964 ], [ -74.35867892, -9.171978521 ] ] } },
{ "type": "Feature", "properties": { "from": "AUS-TA", "to": "AUS-VI", "existing capacity + (mw)": 594.0, "existing capacity - (mw)": -478.0, "planned capacity + (mw)": 618.0, "planned capacity - (mw)": -484.0, "year planned": 2029.0, "assumptions/applied methods": "For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. The net additional network capacity is assumed to be the identified transmission limits if this project gets initiated (1212 MW TAS to VIC, 962 MW VIC to TAS) - the existing capacities.", "other notes": null, "source existing (2023)": "https://www.aemo.com.au/-/media/Files/Electricity/NEM/Security_and_Reliability/Congestion-Information/2017/Interconnector-Capabilities.pdf", "source planned": "https://aemo.com.au/-/media/files/major-publications/isp/2023/2023-transmission-expansion-options-report.pdf?la=en", "existing": 0.536, "planned": 0.551, "start_lat": -42.8806, "start_lon": 147.325, "end_lat": -37.8142, "end_lon": 144.9631, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 147.325, -42.8806 ], [ 144.9631, -37.8142 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-AB", "to": "USA-NW", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines with USA in AESO Long-term Transmission Plan 2022.", "source existing (2023)": "https://www.bhe-canada.ca/portfolio/matl/", "source planned": "https://www.aeso.ca/assets/Uploads/grid/ltp/AESO-2022-Long-term-Transmission-Plan.pdf", "existing": 0.3, "planned": 0.0, "start_lat": 51.05, "start_lon": -114.067, "end_lat": 46.8751, "end_lon": -114.0214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.067, 51.05 ], [ -114.0214, 46.8751 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-AR", "to": "USA-IS", "existing capacity + (mw)": 700.0, "existing capacity - (mw)": -350.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No planned lines shown on ISO-NE transmission map.", "source existing (2023)": "https://www.cmpco.com/w/system-information", "source planned": null, "existing": 0.525, "planned": 0.0, "start_lat": 44.6475, "start_lon": -63.5906, "end_lat": 42.3188, "end_lon": -71.0852, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -63.5906, 44.6475 ], [ -71.0852, 42.3188 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-BC", "to": "USA-BP", "existing capacity + (mw)": 2300.0, "existing capacity - (mw)": -2000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of planned lines between BC and the Washington, Idaho, Montana area. Also not visible on BC hydro transmission map.", "source existing (2023)": "https://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/suppliers/transmission-system/engineering_studies_data/technical_data/line_ratings/nwuscan.pdf", "source planned": "https://www.bpa.gov/-/media/Aep/transmission/attachment-k/2022-bpa-transmission-plan.pdf", "existing": 2.15, "planned": 0.0, "start_lat": 49.25, "start_lon": -123.1, "end_lat": 45.6366, "end_lon": -122.5967, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -123.1, 49.25 ], [ -122.5967, 45.6366 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-MB", "to": "USA-MI", "existing capacity + (mw)": 2983.0, "existing capacity - (mw)": -1583.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Includes firm transfer capabilities as of 2015 + additional 883 MW line capacity as of 2021 with new 500 kV Great Northern Transmission Line. No mentioning of planned lines between Manitoba and United States except for the existing ones with MISO (USAMI). Manitoba expects to reduce exports of electricity over the coming years due to growing domestic demand.", "source existing (2023)": "http://www.oasis.oati.com/woa/docs/MHEB/MHEBdocs/2015_Transmission_Interface_Capability_Report.pdf", "source planned": "https://www.powereng.com/library/great-northern-500-kv-transmission-line-program-services", "existing": 2.283, "planned": 0.0, "start_lat": 49.8844, "start_lon": -97.1464, "end_lat": 42.3834, "end_lon": -83.1024, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -97.1464, 49.8844 ], [ -83.1024, 42.3834 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-ON", "to": "USA-MI", "existing capacity + (mw)": 1650.0, "existing capacity - (mw)": -1450.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines with USA in IESO Annual Planning Outlook 2022.", "source existing (2023)": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2021/Ontario-Transmission-Interfaces-and-Interties-Overview.ashx", "source planned": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2022/2022-Annual-Planning-Outlook.ashx", "existing": 1.55, "planned": 0.0, "start_lat": 43.7417, "start_lon": -79.3733, "end_lat": 42.3834, "end_lon": -83.1024, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -79.3733, 43.7417 ], [ -83.1024, 42.3834 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-ON", "to": "USA-NY", "existing capacity + (mw)": 2400.0, "existing capacity - (mw)": -1900.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines with USA in IESO Annual Planning Outlook 2022.", "source existing (2023)": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2021/Ontario-Transmission-Interfaces-and-Interties-Overview.ashx", "source planned": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/planning-forecasts/apo/Dec2022/2022-Annual-Planning-Outlook.ashx", "existing": 2.15, "planned": 0.0, "start_lat": 43.7417, "start_lon": -79.3733, "end_lat": 40.6943, "end_lon": -73.9249, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -79.3733, 43.7417 ], [ -73.9249, 40.6943 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-QC", "to": "USA-IS", "existing capacity + (mw)": 2275.0, "existing capacity - (mw)": -2170.0, "planned capacity + (mw)": 1200.0, "planned capacity - (mw)": -1200.0, "year planned": 2025.0, "assumptions/applied methods": "Distance of the 'CLEAN ENERGY CONNECT' project is given in miles hence converted to km (150 miles = 241 km). ", "other notes": null, "source existing (2023)": "http://www.oasis.oati.com/hqt/index.html", "source planned": "https://www.energy.gov/oe/articles/exhibit-o-public-outreach-materials-0#:~:text=THE%20PROJECT,from%20Qu%C3%A9bec%20to%20New%20England.", "existing": 2.2225, "planned": 1.2, "start_lat": 45.5089, "start_lon": -73.5617, "end_lat": 42.3188, "end_lon": -71.0852, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -73.5617, 45.5089 ], [ -71.0852, 42.3188 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-QC", "to": "USA-NY", "existing capacity + (mw)": 2070.0, "existing capacity - (mw)": -1100.0, "planned capacity + (mw)": 1250.0, "planned capacity - (mw)": -1250.0, "year planned": 2026.0, "assumptions/applied methods": null, "other notes": "Distance value is the sum of the Hertel-New York Project and Champlain Hudson Power Express lengths.", "source existing (2023)": "http://www.oasis.oati.com/hqt/index.html", "source planned": "https://www.hydroquebec.com/projects/hertel-new-york-interconnection/", "existing": 1.585, "planned": 1.25, "start_lat": 45.5089, "start_lon": -73.5617, "end_lat": 40.6943, "end_lon": -73.9249, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -73.5617, 45.5089 ], [ -73.9249, 40.6943 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-SK", "to": "USA-SW", "existing capacity + (mw)": 150.0, "existing capacity - (mw)": -150.0, "planned capacity + (mw)": 650.0, "planned capacity - (mw)": -650.0, "year planned": 2027.0, "assumptions/applied methods": null, "other notes": "Distance values are given in miles and have been converted to kilometers.", "source existing (2023)": "https://www.saskatchewan.ca/-/media/news-release-backgrounders/2021/jul/saskpower-2020-21-annual-report.pdf", "source planned": "https://www.spp.org/news-list/southwest-power-pool-welcomes-first-international-member/", "existing": 0.15, "planned": 0.65, "start_lat": 52.1333, "start_lon": -106.683, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.683, 52.1333 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "ALB-XX", "to": "GRC-XX", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.4, "planned": 0.0, "start_lat": 41.14084484, "start_lon": 20.06195707, "end_lat": 39.47356038, "end_lon": 22.57828214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 20.06195707, 41.14084484 ], [ 22.57828214, 39.47356038 ] ] } },
{ "type": "Feature", "properties": { "from": "ALB-XX", "to": "KOS-XX", "existing capacity + (mw)": 510.0, "existing capacity - (mw)": -652.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": 2026.0, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. Planned capacity only reported in kV terms but not in capacities (MW) hence not included.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf", "existing": 0.581, "planned": null, "start_lat": 41.14084484, "start_lon": 20.06195707, "end_lat": 42.6633, "end_lon": 21.1622, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 20.06195707, 41.14084484 ], [ 21.1622, 42.6633 ] ] } },
{ "type": "Feature", "properties": { "from": "ALB-XX", "to": "MKD-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.5, "planned": 0.5, "start_lat": 41.14084484, "start_lon": 20.06195707, "end_lat": 41.59923186, "end_lon": 21.69771488, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 20.06195707, 41.14084484 ], [ 21.69771488, 41.59923186 ] ] } },
{ "type": "Feature", "properties": { "from": "ALB-XX", "to": "MNE-XX", "existing capacity + (mw)": 350.0, "existing capacity - (mw)": -350.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.35, "planned": 0.0, "start_lat": 41.14084484, "start_lon": 20.06195707, "end_lat": 42.77700853, "end_lon": 19.23854506, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 20.06195707, 41.14084484 ], [ 19.23854506, 42.77700853 ] ] } },
{ "type": "Feature", "properties": { "from": "ALB-XX", "to": "SRB-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.5, "planned": 0.0, "start_lat": 41.14084484, "start_lon": 20.06195707, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 20.06195707, 41.14084484 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "ARG-XX", "to": "BRA-SO", "existing capacity + (mw)": 2276.0, "existing capacity - (mw)": -2276.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 2.276, "planned": 0.0, "start_lat": -35.18533553, "start_lon": -65.1410162, "end_lat": -25.4297, "end_lon": -49.2711, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -65.1410162, -35.18533553 ], [ -49.2711, -25.4297 ] ] } },
{ "type": "Feature", "properties": { "from": "AUT-XX", "to": "CHE-XX", "existing capacity + (mw)": 1200.0, "existing capacity - (mw)": -1200.0, "planned capacity + (mw)": 100.0, "planned capacity - (mw)": -200.0, "year planned": 2045.0, "assumptions/applied methods": "The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.", "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.2, "planned": 0.15, "start_lat": 47.58736064, "start_lon": 14.142721, "end_lat": 46.80144773, "end_lon": 8.227548457, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 14.142721, 47.58736064 ], [ 8.227548457, 46.80144773 ] ] } },
{ "type": "Feature", "properties": { "from": "AUT-XX", "to": "CZE-XX", "existing capacity + (mw)": 900.0, "existing capacity - (mw)": -900.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.9, "planned": 0.0, "start_lat": 47.58736064, "start_lon": 14.142721, "end_lat": 49.74046863, "end_lon": 15.33044742, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 14.142721, 47.58736064 ], [ 15.33044742, 49.74046863 ] ] } },
{ "type": "Feature", "properties": { "from": "AUT-XX", "to": "DEU-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 4000.0, "planned capacity - (mw)": -4000.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.4, "planned": 4.0, "start_lat": 47.58736064, "start_lon": 14.142721, "end_lat": 51.09425219, "end_lon": 10.38776868, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 14.142721, 47.58736064 ], [ 10.38776868, 51.09425219 ] ] } },
{ "type": "Feature", "properties": { "from": "AUT-XX", "to": "HUN-XX", "existing capacity + (mw)": 800.0, "existing capacity - (mw)": -800.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.8, "planned": 0.0, "start_lat": 47.58736064, "start_lon": 14.142721, "end_lat": 47.16747903, "end_lon": 19.41463251, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 14.142721, 47.58736064 ], [ 19.41463251, 47.16747903 ] ] } },
{ "type": "Feature", "properties": { "from": "AUT-XX", "to": "ITA-XX", "existing capacity + (mw)": 410.0, "existing capacity - (mw)": -410.0, "planned capacity + (mw)": 390.0, "planned capacity - (mw)": -390.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.41, "planned": 0.39, "start_lat": 47.58736064, "start_lon": 14.142721, "end_lat": 43.52231674, "end_lon": 12.16397856, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 14.142721, 47.58736064 ], [ 12.16397856, 43.52231674 ] ] } },
{ "type": "Feature", "properties": { "from": "AUT-XX", "to": "SVN-XX", "existing capacity + (mw)": 950.0, "existing capacity - (mw)": -950.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2045.0, "assumptions/applied methods": "The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.", "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.95, "planned": 0.5, "start_lat": 47.58736064, "start_lon": 14.142721, "end_lat": 46.12398239, "end_lon": 14.81686361, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 14.142721, 47.58736064 ], [ 14.81686361, 46.12398239 ] ] } },
{ "type": "Feature", "properties": { "from": "AZE-XX", "to": "GEO-XX", "existing capacity + (mw)": 2000.0, "existing capacity - (mw)": -2000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed that the reported Summer TTC is the representative value, winter TTC is 200 MW higher.", "other notes": null, "source existing (2023)": "https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF", "source planned": "https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF", "existing": 2.0, "planned": 0.0, "start_lat": 40.35265159, "start_lon": 47.66265475, "end_lat": 42.17608505, "end_lon": 43.5193205, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 47.66265475, 40.35265159 ], [ 43.5193205, 42.17608505 ] ] } },
{ "type": "Feature", "properties": { "from": "BEL-XX", "to": "DEU-XX", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.0, "planned": 1.0, "start_lat": 50.64150126, "start_lon": 4.659493024, "end_lat": 51.09425219, "end_lon": 10.38776868, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 4.659493024, 50.64150126 ], [ 10.38776868, 51.09425219 ] ] } },
{ "type": "Feature", "properties": { "from": "BEL-XX", "to": "FRA-XX", "existing capacity + (mw)": 2800.0, "existing capacity - (mw)": -2800.0, "planned capacity + (mw)": 1500.0, "planned capacity - (mw)": -1500.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.8, "planned": 1.5, "start_lat": 50.64150126, "start_lon": 4.659493024, "end_lat": 46.62469296, "end_lon": 2.459606421, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 4.659493024, 50.64150126 ], [ 2.459606421, 46.62469296 ] ] } },
{ "type": "Feature", "properties": { "from": "BEL-XX", "to": "GBR-XX", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 1400.0, "planned capacity - (mw)": -1400.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.0, "planned": 1.4, "start_lat": 50.64150126, "start_lon": 4.659493024, "end_lat": 51.5072, "end_lon": -0.1275, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 4.659493024, 50.64150126 ], [ -0.1275, 51.5072 ] ] } },
{ "type": "Feature", "properties": { "from": "BEL-XX", "to": "LUX-XX", "existing capacity + (mw)": 680.0, "existing capacity - (mw)": -680.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.68, "planned": 0.5, "start_lat": 50.64150126, "start_lon": 4.659493024, "end_lat": 49.77696347, "end_lon": 6.093063038, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 4.659493024, 50.64150126 ], [ 6.093063038, 49.77696347 ] ] } },
{ "type": "Feature", "properties": { "from": "BEL-XX", "to": "NLD-XX", "existing capacity + (mw)": 2400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -2000.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.9, "planned": 1.5, "start_lat": 50.64150126, "start_lon": 4.659493024, "end_lat": 52.25602025, "end_lon": 5.652414398, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 4.659493024, 50.64150126 ], [ 5.652414398, 52.25602025 ] ] } },
{ "type": "Feature", "properties": { "from": "BGR-XX", "to": "GRC-XX", "existing capacity + (mw)": 770.0, "existing capacity - (mw)": -1100.0, "planned capacity + (mw)": 930.0, "planned capacity - (mw)": -600.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.935, "planned": 0.765, "start_lat": 42.75609684, "start_lon": 25.22511156, "end_lat": 39.47356038, "end_lon": 22.57828214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 25.22511156, 42.75609684 ], [ 22.57828214, 39.47356038 ] ] } },
{ "type": "Feature", "properties": { "from": "BGR-XX", "to": "MKD-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.5, "planned": 0.0, "start_lat": 42.75609684, "start_lon": 25.22511156, "end_lat": 41.59923186, "end_lon": 21.69771488, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 25.22511156, 42.75609684 ], [ 21.69771488, 41.59923186 ] ] } },
{ "type": "Feature", "properties": { "from": "BGR-XX", "to": "ROU-XX", "existing capacity + (mw)": 900.0, "existing capacity - (mw)": -900.0, "planned capacity + (mw)": 600.0, "planned capacity - (mw)": -600.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.9, "planned": 0.6, "start_lat": 42.75609684, "start_lon": 25.22511156, "end_lat": 45.84001507, "end_lon": 24.98565451, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 25.22511156, 42.75609684 ], [ 24.98565451, 45.84001507 ] ] } },
{ "type": "Feature", "properties": { "from": "BGR-XX", "to": "SRB-XX", "existing capacity + (mw)": 320.0, "existing capacity - (mw)": -320.0, "planned capacity + (mw)": 730.0, "planned capacity - (mw)": -186.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.32, "planned": 0.458, "start_lat": 42.75609684, "start_lon": 25.22511156, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 25.22511156, 42.75609684 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "BGR-XX", "to": "TUR-XX", "existing capacity + (mw)": 900.0, "existing capacity - (mw)": -900.0, "planned capacity + (mw)": 1100.0, "planned capacity - (mw)": -1100.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.9, "planned": 1.1, "start_lat": 42.75609684, "start_lon": 25.22511156, "end_lat": 38.98806237, "end_lon": 35.4354723, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 25.22511156, 42.75609684 ], [ 35.4354723, 38.98806237 ] ] } },
{ "type": "Feature", "properties": { "from": "BIH-XX", "to": "HRV-XX", "existing capacity + (mw)": 750.0, "existing capacity - (mw)": -750.0, "planned capacity + (mw)": 298.0, "planned capacity - (mw)": -644.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.75, "planned": 0.471, "start_lat": 44.17538124, "start_lon": 17.7881827, "end_lat": 45.13633668, "end_lon": 16.41248911, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 17.7881827, 44.17538124 ], [ 16.41248911, 45.13633668 ] ] } },
{ "type": "Feature", "properties": { "from": "BIH-XX", "to": "MNE-XX", "existing capacity + (mw)": 800.0, "existing capacity - (mw)": -800.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.8, "planned": 0.0, "start_lat": 44.17538124, "start_lon": 17.7881827, "end_lat": 42.77700853, "end_lon": 19.23854506, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 17.7881827, 44.17538124 ], [ 19.23854506, 42.77700853 ] ] } },
{ "type": "Feature", "properties": { "from": "BIH-XX", "to": "SRB-XX", "existing capacity + (mw)": 530.0, "existing capacity - (mw)": -530.0, "planned capacity + (mw)": 850.0, "planned capacity - (mw)": -700.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.53, "planned": 0.775, "start_lat": 44.17538124, "start_lon": 17.7881827, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 17.7881827, 44.17538124 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "BLR-XX", "to": "LTU-XX", "existing capacity + (mw)": 1001.0, "existing capacity - (mw)": -525.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.entsoe.eu/data/map/", "existing": 0.763, "planned": 0.0, "start_lat": 53.54560441, "start_lon": 28.05657698, "end_lat": 55.33486135, "end_lon": 23.908221, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 28.05657698, 53.54560441 ], [ 23.908221, 55.33486135 ] ] } },
{ "type": "Feature", "properties": { "from": "BLR-XX", "to": "RUS-CE", "existing capacity + (mw)": 2720.0, "existing capacity - (mw)": -2720.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed to consist of the reported tie-lines to Smolenskaya NPP (1000 MW), Talashkino (780 MW), Roslavl (940 MW). No updated information on existing infrastructure beyond the lines reported in the ENTSOE documents (and grid map) can be found.", "other notes": "ENTSOE map shows no new (known) concrete transmission projects as of now between Belarus and Russia. ", "source existing (2023)": "https://eepublicdownloads.entsoe.eu/clean-documents/pre2015/publications/ce/otherreports/SYSTINT_Report_2002.pdf", "source planned": "https://www.entsoe.eu/data/map/", "existing": 2.72, "planned": 0.0, "start_lat": 53.54560441, "start_lon": 28.05657698, "end_lat": 54.86169262, "end_lon": 38.11446937, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 28.05657698, 53.54560441 ], [ 38.11446937, 54.86169262 ] ] } },
{ "type": "Feature", "properties": { "from": "BLR-XX", "to": "RUS-NW", "existing capacity + (mw)": 570.0, "existing capacity - (mw)": -570.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed to consist of the reported tie-line to Novosokolniki (570 MW). No updated information on existing infrastructure beyond the lines reported in the ENTSOE documents (and grid map) can be found.", "other notes": "ENTSOE map shows no new (known) concrete transmission projects as of now between Belarus and Russia. ", "source existing (2023)": "https://eepublicdownloads.entsoe.eu/clean-documents/pre2015/publications/ce/otherreports/SYSTINT_Report_2002.pdf", "source planned": "https://www.entsoe.eu/data/map/", "existing": 0.57, "planned": 0.0, "start_lat": 53.54560441, "start_lon": 28.05657698, "end_lat": 59.95, "end_lon": 30.3167, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 28.05657698, 53.54560441 ], [ 30.3167, 59.95 ] ] } },
{ "type": "Feature", "properties": { "from": "BLZ-XX", "to": "MEX-XX", "existing capacity + (mw)": 40.0, "existing capacity - (mw)": -40.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No concrete plans found for new transmission infrastructure so planned capacities assumed to be 0.", "other notes": null, "source existing (2023)": "https://www.tdworld.com/overhead-transmission/article/20969227/transamerica-interconnections", "source planned": null, "existing": 0.04, "planned": 0.0, "start_lat": 17.4986, "start_lon": -88.1886, "end_lat": 23.94324092, "end_lon": -102.528737, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -88.1886, 17.4986 ], [ -102.528737, 23.94324092 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CN", "to": "BRA-CW", "existing capacity + (mw)": 6795.0, "existing capacity - (mw)": -6795.0, "planned capacity + (mw)": 4231.0, "planned capacity - (mw)": -4231.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 6.795, "planned": 4.231, "start_lat": -1.4558, "start_lon": -48.5039, "end_lat": -15.7939, "end_lon": -47.8828, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ -48.5039, -1.4558 ], [ -47.8828, -15.7939 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CN", "to": "BRA-NE", "existing capacity + (mw)": 8815.0, "existing capacity - (mw)": -8815.0, "planned capacity + (mw)": 1557.0, "planned capacity - (mw)": -1557.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 8.815, "planned": 1.557, "start_lat": -1.4558, "start_lon": -48.5039, "end_lat": -12.9747, "end_lon": -38.4767, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ -48.5039, -1.4558 ], [ -38.4767, -12.9747 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CN", "to": "BRA-NW", "existing capacity + (mw)": 2882.0, "existing capacity - (mw)": -2882.0, "planned capacity + (mw)": 694.0, "planned capacity - (mw)": -694.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 2.882, "planned": 0.694, "start_lat": -1.4558, "start_lon": -48.5039, "end_lat": -3.1, "end_lon": -60.0167, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -48.5039, -1.4558 ], [ -60.0167, -3.1 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CN", "to": "BRA-SE", "existing capacity + (mw)": 8000.0, "existing capacity - (mw)": -8000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 8.0, "planned": 0.0, "start_lat": -1.4558, "start_lon": -48.5039, "end_lat": -23.55, "end_lon": -46.6333, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ -48.5039, -1.4558 ], [ -46.6333, -23.55 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CW", "to": "BRA-NE", "existing capacity + (mw)": 2188.0, "existing capacity - (mw)": -2188.0, "planned capacity + (mw)": 926.0, "planned capacity - (mw)": -926.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 2.188, "planned": 0.926, "start_lat": -15.7939, "start_lon": -47.8828, "end_lat": -12.9747, "end_lon": -38.4767, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -47.8828, -15.7939 ], [ -38.4767, -12.9747 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CW", "to": "BRA-SO", "existing capacity + (mw)": 231.0, "existing capacity - (mw)": -231.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 0.231, "planned": 0.0, "start_lat": -15.7939, "start_lon": -47.8828, "end_lat": -25.4297, "end_lon": -49.2711, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -47.8828, -15.7939 ], [ -49.2711, -25.4297 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-CW", "to": "BRA-WE", "existing capacity + (mw)": 694.0, "existing capacity - (mw)": -694.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 0.694, "planned": 0.0, "start_lat": -15.7939, "start_lon": -47.8828, "end_lat": -8.7619, "end_lon": -63.9039, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -47.8828, -15.7939 ], [ -63.9039, -8.7619 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-NE", "to": "BRA-SE", "existing capacity + (mw)": 3282.0, "existing capacity - (mw)": -3282.0, "planned capacity + (mw)": 4376.0, "planned capacity - (mw)": -4376.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 3.282, "planned": 4.376, "start_lat": -12.9747, "start_lon": -38.4767, "end_lat": -23.55, "end_lon": -46.6333, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -38.4767, -12.9747 ], [ -46.6333, -23.55 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-NW", "to": "VEN-XX", "existing capacity + (mw)": 231.0, "existing capacity - (mw)": -231.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 0.231, "planned": 0.0, "start_lat": -3.1, "start_lon": -60.0167, "end_lat": 7.127130493, "end_lon": -66.15124644, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -60.0167, -3.1 ], [ -66.15124644, 7.127130493 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-SE", "to": "BRA-WE", "existing capacity + (mw)": 6300.0, "existing capacity - (mw)": -6300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Existing and planned capacities between Brazilian provinces are extracted from Deng et al., 2022, filtered and aggregated to inter-regional level following the OSeMOSYS Global representation.", "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 6.3, "planned": 0.0, "start_lat": -23.55, "start_lon": -46.6333, "end_lat": -8.7619, "end_lon": -63.9039, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ -46.6333, -23.55 ], [ -63.9039, -8.7619 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-SO", "to": "PRY-XX", "existing capacity + (mw)": 8751.0, "existing capacity - (mw)": -8751.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 8.751, "planned": 0.0, "start_lat": -25.4297, "start_lon": -49.2711, "end_lat": -23.24452279, "end_lon": -58.39119134, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ -49.2711, -25.4297 ], [ -58.39119134, -23.24452279 ] ] } },
{ "type": "Feature", "properties": { "from": "BRA-SO", "to": "URY-XX", "existing capacity + (mw)": 570.0, "existing capacity - (mw)": -570.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.nature.com/articles/s41597-023-01992-9", "source planned": "https://www.nature.com/articles/s41597-023-01992-9", "existing": 0.57, "planned": 0.0, "start_lat": -25.4297, "start_lon": -49.2711, "end_lat": -32.79622178, "end_lon": -56.01834601, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -49.2711, -25.4297 ], [ -56.01834601, -32.79622178 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-AR", "to": "CAN-QC", "existing capacity + (mw)": 775.0, "existing capacity - (mw)": -1200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Additional transmission links between New Brunswick and Quebec are considered but recent comments from NB-power have indicated that the costs are considered as too high as of now so no concrete plans for the forseeable future.", "source existing (2023)": "http://www.oasis.oati.com/hqt/index.html", "source planned": "https://atlantic.ctvnews.ca/nb-power-says-bringing-electricity-via-atlantic-loop-could-be-cost-prohibitive-1.6506988", "existing": 0.9875, "planned": 0.0, "start_lat": 44.6475, "start_lon": -63.5906, "end_lat": 45.5089, "end_lon": -73.5617, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -63.5906, 44.6475 ], [ -73.5617, 45.5089 ] ] } },
{ "type": "Feature", "properties": { "from": "CAN-MB", "to": "CAN-ON", "existing capacity + (mw)": 200.0, "existing capacity - (mw)": -200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Additional link between Ontario and Manitoba is considered as part of Phase 3 of the 'Northwest Bulk Transmission Line' developments but 'The IESO does not anticipate a need for Phase 3 at this time.' so no expected new planned capacities in the short term.", "source existing (2023)": "https://dbrs.morningstar.com/research/354005/manitoba-hydro-electric-board-the-rating-report", "source planned": "https://www.ieso.ca/en/Get-Involved/Regional-Planning/Northwest-Ontario/bulk-planning ", "existing": 0.2, "planned": 0.0, "start_lat": 49.8844, "start_lon": -97.1464, "end_lat": 43.7417, "end_lon": -79.3733, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -97.1464, 49.8844 ], [ -79.3733, 43.7417 ] ] } },
{ "type": "Feature", "properties": { "from": "CHE-XX", "to": "DEU-XX", "existing capacity + (mw)": 4200.0, "existing capacity - (mw)": -4200.0, "planned capacity + (mw)": 200.0, "planned capacity - (mw)": -1200.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 4.2, "planned": 0.7, "start_lat": 46.80144773, "start_lon": 8.227548457, "end_lat": 51.09425219, "end_lon": 10.38776868, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 8.227548457, 46.80144773 ], [ 10.38776868, 51.09425219 ] ] } },
{ "type": "Feature", "properties": { "from": "CHE-XX", "to": "FRA-XX", "existing capacity + (mw)": 3700.0, "existing capacity - (mw)": -3700.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2045.0, "assumptions/applied methods": "The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.", "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.7, "planned": 0.5, "start_lat": 46.80144773, "start_lon": 8.227548457, "end_lat": 46.62469296, "end_lon": 2.459606421, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 8.227548457, 46.80144773 ], [ 2.459606421, 46.62469296 ] ] } },
{ "type": "Feature", "properties": { "from": "CHE-XX", "to": "ITA-XX", "existing capacity + (mw)": 3750.0, "existing capacity - (mw)": -3750.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.75, "planned": 1.0, "start_lat": 46.80144773, "start_lon": 8.227548457, "end_lat": 43.52231674, "end_lon": 12.16397856, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 8.227548457, 46.80144773 ], [ 12.16397856, 43.52231674 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-AN", "to": "CHN-HB", "existing capacity + (mw)": 4000.0, "existing capacity - (mw)": -4000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 31.8639, "start_lon": 117.2808, "end_lat": 38.0422, "end_lon": 114.5086, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 117.2808, 31.8639 ], [ 114.5086, 38.0422 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-AN", "to": "CHN-JS", "existing capacity + (mw)": 7500.0, "existing capacity - (mw)": -7500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.5, "planned": 0.0, "start_lat": 31.8639, "start_lon": 117.2808, "end_lat": 32.0608, "end_lon": 118.7789, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 117.2808, 31.8639 ], [ 118.7789, 32.0608 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-AN", "to": "CHN-ZH", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 31.8639, "start_lon": 117.2808, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 117.2808, 31.8639 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-BE", "to": "CHN-HB", "existing capacity + (mw)": 6500.0, "existing capacity - (mw)": -6500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 6.5, "planned": 0.0, "start_lat": 39.904, "start_lon": 116.4075, "end_lat": 38.0422, "end_lon": 114.5086, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 116.4075, 39.904 ], [ 114.5086, 38.0422 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-BE", "to": "CHN-NM", "existing capacity + (mw)": 5000.0, "existing capacity - (mw)": -5000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 5.0, "planned": 0.0, "start_lat": 39.904, "start_lon": 116.4075, "end_lat": 42.2663, "end_lon": 118.9223, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 116.4075, 39.904 ], [ 118.9223, 42.2663 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-BE", "to": "CHN-TJ", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 39.904, "start_lon": 116.4075, "end_lat": 39.1467, "end_lon": 117.2056, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 116.4075, 39.904 ], [ 117.2056, 39.1467 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-CH", "to": "CHN-HB", "existing capacity + (mw)": 4000.0, "existing capacity - (mw)": -4000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 29.55, "start_lon": 106.5069, "end_lat": 38.0422, "end_lon": 114.5086, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.5069, 29.55 ], [ 114.5086, 38.0422 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-CH", "to": "CHN-HN", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 29.55, "start_lon": 106.5069, "end_lat": 28.1987, "end_lon": 112.9709, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.5069, 29.55 ], [ 112.9709, 28.1987 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-CH", "to": "CHN-HU", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 29.55, "start_lon": 106.5069, "end_lat": 30.5872, "end_lon": 114.2881, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.5069, 29.55 ], [ 114.2881, 30.5872 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-CH", "to": "CHN-SC", "existing capacity + (mw)": 6500.0, "existing capacity - (mw)": -6500.0, "planned capacity + (mw)": 24000.0, "planned capacity - (mw)": -24000.0, "year planned": 2025.0, "assumptions/applied methods": "Total capacity of 25 GW on Sichuan-Chongqing lines planned for 2025 assuming a power factor of 1. Values are given in kVa.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": "https://news.bjx.com.cn/html/20220929/1258242.shtml", "existing": 6.5, "planned": 24.0, "start_lat": 29.55, "start_lon": 106.5069, "end_lat": 30.66, "end_lon": 104.0633, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.5069, 29.55 ], [ 104.0633, 30.66 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-FU", "to": "CHN-ZH", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 24.4797, "start_lon": 118.0819, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.0819, 24.4797 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GA", "to": "CHN-JS", "existing capacity + (mw)": 7200.0, "existing capacity - (mw)": -7200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.2, "planned": 0.0, "start_lat": 36.0617, "start_lon": 103.8318, "end_lat": 32.0608, "end_lon": 118.7789, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.8318, 36.0617 ], [ 118.7789, 32.0608 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GA", "to": "CHN-NI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 36.0617, "start_lon": 103.8318, "end_lat": 38.4795, "end_lon": 106.2254, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.8318, 36.0617 ], [ 106.2254, 38.4795 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GA", "to": "CHN-QI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 36.0617, "start_lon": 103.8318, "end_lat": 36.6239, "end_lon": 101.7787, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.8318, 36.0617 ], [ 101.7787, 36.6239 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GA", "to": "CHN-SI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 36.0617, "start_lon": 103.8318, "end_lat": 34.2667, "end_lon": 108.9, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.8318, 36.0617 ], [ 108.9, 34.2667 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GA", "to": "CHN-XI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 36.0617, "start_lon": 103.8318, "end_lat": 43.8225, "end_lon": 87.6125, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.8318, 36.0617 ], [ 87.6125, 43.8225 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GD", "to": "CHN-GX", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 23.13, "start_lon": 113.26, "end_lat": 22.8192, "end_lon": 108.315, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.26, 23.13 ], [ 108.315, 22.8192 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GD", "to": "CHN-HA", "existing capacity + (mw)": 1200.0, "existing capacity - (mw)": -1200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Phase ii of the Hainan - China mainland interconnection development was finalized in 2019/2020 increasing transmission capacity from 600 MW to 1200 MW. No further indications for newly planned projects can be found.", "source existing (2023)": "https://openinframap.org/#8.31/19.994/110.209", "source planned": "https://energycentral.com/news/hainan-underwater-grid-ready-power-ftz-development", "existing": 1.2, "planned": 0.0, "start_lat": 23.13, "start_lon": 113.26, "end_lat": 20.02, "end_lon": 110.32, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.26, 23.13 ], [ 110.32, 20.02 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GD", "to": "CHN-HK", "existing capacity + (mw)": 1700.0, "existing capacity - (mw)": -1700.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": 2025.0, "assumptions/applied methods": "The same report that mentions the existing capacity of 1.7 GW between Guandong and Hong-Kong also reports that \"By 2025, Guangdong and Hong Kong will complete the 500 kV power transmission and transformation project, and complete the transformation and upgrading of 4 high-voltage lines and Shenzhen substation.\" However, no information can be found on potential increase in terms of capacity hence has not been added to planned capacities.", "other notes": null, "source existing (2023)": "https://www.seetao.com/details/166829.html", "source planned": "https://www.seetao.com/details/166829.html", "existing": 1.7, "planned": null, "start_lat": 23.13, "start_lon": 113.26, "end_lat": 22.3, "end_lon": 114.2, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.26, 23.13 ], [ 114.2, 22.3 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GD", "to": "CHN-MA", "existing capacity + (mw)": 1700.0, "existing capacity - (mw)": -1700.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "A new power line between Guangdong and Macau has been completed in 2022, yet no additional info can be found on potentially other planned capacities going forward so this is set to 0.", "source existing (2023)": "https://news.cgtn.com/news/2022-11-25/3rd-power-transmission-line-from-Guangdong-to-Macao-put-into-operation-1ffF7CrsDkY/index.html", "source planned": null, "existing": 1.7, "planned": 0.0, "start_lat": 23.13, "start_lon": 113.26, "end_lat": 22.2006, "end_lon": 113.5461, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.26, 23.13 ], [ 113.5461, 22.2006 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GD", "to": "CHN-SC", "existing capacity + (mw)": 14400.0, "existing capacity - (mw)": -14400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 14.4, "planned": 0.0, "start_lat": 23.13, "start_lon": 113.26, "end_lat": 30.66, "end_lon": 104.0633, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.26, 23.13 ], [ 104.0633, 30.66 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GU", "to": "CHN-GX", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 26.5794, "start_lon": 106.7078, "end_lat": 22.8192, "end_lon": 108.315, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.7078, 26.5794 ], [ 108.315, 22.8192 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GU", "to": "CHN-JS", "existing capacity + (mw)": 7200.0, "existing capacity - (mw)": -7200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.2, "planned": 0.0, "start_lat": 26.5794, "start_lon": 106.7078, "end_lat": 32.0608, "end_lon": 118.7789, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.7078, 26.5794 ], [ 118.7789, 32.0608 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GU", "to": "CHN-YU", "existing capacity + (mw)": 5500.0, "existing capacity - (mw)": -5500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 5.5, "planned": 0.0, "start_lat": 26.5794, "start_lon": 106.7078, "end_lat": 25.0433, "end_lon": 102.7061, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.7078, 26.5794 ], [ 102.7061, 25.0433 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GX", "to": "CHN-YU", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -5500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 3 GW Wudongde-Guangxi-Guangdong line (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources in to demand centers.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 22.8192, "start_lon": 108.315, "end_lat": 25.0433, "end_lon": 102.7061, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 108.315, 22.8192 ], [ 102.7061, 25.0433 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-GX", "to": "VNM-NO", "existing capacity + (mw)": 70.0, "existing capacity - (mw)": -70.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "110 kV line between Guangxi and Vietnam has been reopened in 2023 with an agreed max trade of 70 MW.", "source existing (2023)": "https://tuoitrenews.vn/news/society/20230523/vietnam-buys-electricity-from-china-to-ease-shortage/73292.html", "source planned": "https://southeastasiainfra.com/vietnams-power-development-plan-unlocking-res-potential-to-achieve-energy-transition-goals/#:~:text=These%20lines%20are%20expected%20to,through%20110%20kV%20power%20lines.", "existing": 0.07, "planned": 0.0, "start_lat": 22.8192, "start_lon": 108.315, "end_lat": 21.71658413, "end_lon": 105.0669191, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 108.315, 22.8192 ], [ 105.0669191, 21.71658413 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HB", "to": "CHN-HE", "existing capacity + (mw)": 14274.3, "existing capacity - (mw)": -14274.3, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 10.2743 GW Zhangbei-Xiong'an line (capacity not yet included in SWITCH data with 2020 baseline year)", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 14.2743, "planned": 0.0, "start_lat": 38.0422, "start_lon": 114.5086, "end_lat": 34.7492, "end_lon": 113.6605, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.5086, 38.0422 ], [ 113.6605, 34.7492 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HB", "to": "CHN-NM", "existing capacity + (mw)": 6500.0, "existing capacity - (mw)": -6500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 6.5, "planned": 0.0, "start_lat": 38.0422, "start_lon": 114.5086, "end_lat": 42.2663, "end_lon": 118.9223, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.5086, 38.0422 ], [ 118.9223, 42.2663 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HB", "to": "CHN-SD", "existing capacity + (mw)": 8500.0, "existing capacity - (mw)": -8500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 6 GW Weifang-Shijazhuang line (capacity not yet included in SWITCH data with 2020 baseline year)", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 8.5, "planned": 0.0, "start_lat": 38.0422, "start_lon": 114.5086, "end_lat": 36.1167, "end_lon": 120.4, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.5086, 38.0422 ], [ 120.4, 36.1167 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HB", "to": "CHN-SX", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 38.0422, "start_lon": 114.5086, "end_lat": 37.8733, "end_lon": 112.5425, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.5086, 38.0422 ], [ 112.5425, 37.8733 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HB", "to": "CHN-TJ", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 38.0422, "start_lon": 114.5086, "end_lat": 39.1467, "end_lon": 117.2056, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.5086, 38.0422 ], [ 117.2056, 39.1467 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HE", "to": "CHN-HU", "existing capacity + (mw)": 8500.0, "existing capacity - (mw)": -8500.0, "planned capacity + (mw)": 5000.0, "planned capacity - (mw)": -5000.0, "year planned": 2024.0, "assumptions/applied methods": "Includes existing 6 GW Nanyang-Jingmen-Changsha line (capacity not yet included in SWITCH data with 2020 baseline year). Also 5 GW Wuhan-Nanchang line planned for 2024.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": "https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1", "existing": 8.5, "planned": 5.0, "start_lat": 34.7492, "start_lon": 113.6605, "end_lat": 30.5872, "end_lon": 114.2881, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.6605, 34.7492 ], [ 114.2881, 30.5872 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HE", "to": "CHN-QI", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -8000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 8 GW Qinghai-Henan line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources in to demand centers.", "other notes": null, "source existing (2023)": "https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 34.7492, "start_lon": 113.6605, "end_lat": 36.6239, "end_lon": 101.7787, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.6605, 34.7492 ], [ 101.7787, 36.6239 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HE", "to": "CHN-XI", "existing capacity + (mw)": 14400.0, "existing capacity - (mw)": -14400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 14.4, "planned": 0.0, "start_lat": 34.7492, "start_lon": 113.6605, "end_lat": 43.8225, "end_lon": 87.6125, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 113.6605, 34.7492 ], [ 87.6125, 43.8225 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HJ", "to": "CHN-JI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 45.75, "start_lon": 126.6333, "end_lat": 43.9, "end_lon": 125.2, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 126.6333, 45.75 ], [ 125.2, 43.9 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HJ", "to": "CHN-NM", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 45.75, "start_lon": 126.6333, "end_lat": 42.2663, "end_lon": 118.9223, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 126.6333, 45.75 ], [ 118.9223, 42.2663 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HJ", "to": "RUS-FE", "existing capacity + (mw)": 950.0, "existing capacity - (mw)": -950.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Values are derived from Table 3.1 (translated from Russian). Voltages from the 'The research of power interconnection among China, Russia, Mongolia' Slidedeck.", "source existing (2023)": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 0.95, "planned": 0.0, "start_lat": 45.75, "start_lon": 126.6333, "end_lat": 63.10654337, "end_lon": 139.4198373, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 126.6333, 45.75 ], [ 139.419837300000012, 63.10654337 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HN", "to": "CHN-HU", "existing capacity + (mw)": 14500.0, "existing capacity - (mw)": -14500.0, "planned capacity + (mw)": 6000.0, "planned capacity - (mw)": -6000.0, "year planned": 2023.0, "assumptions/applied methods": "Includes existing 6 GW Nanyang-Jingmen-Changsha line (capacity not yet included in SWITCH data with 2020 baseline year). Also 6 GW Zhumadian-Wuhan line planned for 2023.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": "https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1", "existing": 14.5, "planned": 6.0, "start_lat": 28.1987, "start_lon": 112.9709, "end_lat": 30.5872, "end_lon": 114.2881, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 112.9709, 28.1987 ], [ 114.2881, 30.5872 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HN", "to": "CHN-JX", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 28.1987, "start_lon": 112.9709, "end_lat": 28.6842, "end_lon": 115.8872, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 112.9709, 28.1987 ], [ 115.8872, 28.6842 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HN", "to": "CHN-SC", "existing capacity + (mw)": 10500.0, "existing capacity - (mw)": -10500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 10.5, "planned": 0.0, "start_lat": 28.1987, "start_lon": 112.9709, "end_lat": 30.66, "end_lon": 104.0633, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 112.9709, 28.1987 ], [ 104.0633, 30.66 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HN", "to": "CHN-SX", "existing capacity + (mw)": 5000.0, "existing capacity - (mw)": -5000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 5.0, "planned": 0.0, "start_lat": 28.1987, "start_lon": 112.9709, "end_lat": 37.8733, "end_lon": 112.5425, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 112.9709, 28.1987 ], [ 112.5425, 37.8733 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HU", "to": "CHN-JX", "existing capacity + (mw)": 7500.0, "existing capacity - (mw)": -7500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 5 GW Nanchang-Changsha line (capacity not yet included in SWITCH data with 2020 baseline year).", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.5, "planned": 0.0, "start_lat": 30.5872, "start_lon": 114.2881, "end_lat": 28.6842, "end_lon": 115.8872, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.2881, 30.5872 ], [ 115.8872, 28.6842 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-HU", "to": "CHN-SI", "existing capacity + (mw)": 8000.0, "existing capacity - (mw)": -8000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 8.0, "planned": 0.0, "start_lat": 30.5872, "start_lon": 114.2881, "end_lat": 34.2667, "end_lon": 108.9, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 114.2881, 30.5872 ], [ 108.9, 34.2667 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JI", "to": "CHN-LI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 43.9, "start_lon": 125.2, "end_lat": 41.8025, "end_lon": 123.4281, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 125.2, 43.9 ], [ 123.4281, 41.8025 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JI", "to": "CHN-NM", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 43.9, "start_lon": 125.2, "end_lat": 42.2663, "end_lon": 118.9223, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 125.2, 43.9 ], [ 118.9223, 42.2663 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JS", "to": "CHN-SC", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -8000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 8 GW Baihetan - Jiangsu line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources to demand centers.", "other notes": null, "source existing (2023)": "https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 32.0608, "start_lon": 118.7789, "end_lat": 30.66, "end_lon": 104.0633, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.7789, 32.0608 ], [ 104.0633, 30.66 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JS", "to": "CHN-SD", "existing capacity + (mw)": 5000.0, "existing capacity - (mw)": -5000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 5.0, "planned": 0.0, "start_lat": 32.0608, "start_lon": 118.7789, "end_lat": 36.1167, "end_lon": 120.4, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.7789, 32.0608 ], [ 120.4, 36.1167 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JS", "to": "CHN-SH", "existing capacity + (mw)": 7500.0, "existing capacity - (mw)": -7500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.5, "planned": 0.0, "start_lat": 32.0608, "start_lon": 118.7789, "end_lat": 31.1667, "end_lon": 121.4667, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.7789, 32.0608 ], [ 121.4667, 31.1667 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JS", "to": "CHN-SI", "existing capacity + (mw)": 4000.0, "existing capacity - (mw)": -4000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 32.0608, "start_lon": 118.7789, "end_lat": 34.2667, "end_lon": 108.9, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.7789, 32.0608 ], [ 108.9, 34.2667 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JS", "to": "CHN-SX", "existing capacity + (mw)": 5000.0, "existing capacity - (mw)": -5000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 5.0, "planned": 0.0, "start_lat": 32.0608, "start_lon": 118.7789, "end_lat": 37.8733, "end_lon": 112.5425, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.7789, 32.0608 ], [ 112.5425, 37.8733 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JS", "to": "CHN-ZH", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 32.0608, "start_lon": 118.7789, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.7789, 32.0608 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JX", "to": "CHN-NM", "existing capacity + (mw)": 7200.0, "existing capacity - (mw)": -7200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.2, "planned": 0.0, "start_lat": 28.6842, "start_lon": 115.8872, "end_lat": 42.2663, "end_lon": 118.9223, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 115.8872, 28.6842 ], [ 118.9223, 42.2663 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-JX", "to": "CHN-SC", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -8000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 8 GW Yazhong-Jiangxi line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources to demand centers.", "other notes": null, "source existing (2023)": "https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 28.6842, "start_lon": 115.8872, "end_lat": 30.66, "end_lon": 104.0633, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 115.8872, 28.6842 ], [ 104.0633, 30.66 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-LI", "to": "CHN-NM", "existing capacity + (mw)": 6500.0, "existing capacity - (mw)": -6500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 6.5, "planned": 0.0, "start_lat": 41.8025, "start_lon": 123.4281, "end_lat": 42.2663, "end_lon": 118.9223, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 123.4281, 41.8025 ], [ 118.9223, 42.2663 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-LI", "to": "PRK-XX", "existing capacity + (mw)": 50.0, "existing capacity - (mw)": -50.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data can be found on exact existing transmission capacities, but it is reported that China imported 35,974 MWh in September 2021. Assuming this is close to the maximum available capacity considering supply constraints and large electricity needs in China (see sources) this equals roughly 50 MW (35,974/30 days/24 hours). No concrete plans found for new transmission lines between PRK and China despite growing electricity exports from PRK.", "other notes": null, "source existing (2023)": "https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar", "source planned": "https://www.scmp.com/economy/china-economy/article/3153342/china-ramps-electricity-imports-north-korea-russia-myanmar", "existing": 0.05, "planned": 0.0, "start_lat": 41.8025, "start_lon": 123.4281, "end_lat": 40.13729227, "end_lon": 127.1691019, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 123.4281, 41.8025 ], [ 127.1691019, 40.13729227 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NI", "to": "CHN-SD", "existing capacity + (mw)": 4000.0, "existing capacity - (mw)": -4000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 38.4795, "start_lon": 106.2254, "end_lat": 36.1167, "end_lon": 120.4, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.2254, 38.4795 ], [ 120.4, 36.1167 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NI", "to": "CHN-SI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 38.4795, "start_lon": 106.2254, "end_lat": 34.2667, "end_lon": 108.9, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.2254, 38.4795 ], [ 108.9, 34.2667 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NI", "to": "CHN-ZH", "existing capacity + (mw)": 7200.0, "existing capacity - (mw)": -7200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 7.2, "planned": 0.0, "start_lat": 38.4795, "start_lon": 106.2254, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 106.2254, 38.4795 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NM", "to": "CHN-SD", "existing capacity + (mw)": 14400.0, "existing capacity - (mw)": -14400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 14.4, "planned": 0.0, "start_lat": 42.2663, "start_lon": 118.9223, "end_lat": 36.1167, "end_lon": 120.4, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.9223, 42.2663 ], [ 120.4, 36.1167 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NM", "to": "CHN-SX", "existing capacity + (mw)": 19500.0, "existing capacity - (mw)": -19500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 19.5, "planned": 0.0, "start_lat": 42.2663, "start_lon": 118.9223, "end_lat": 37.8733, "end_lon": 112.5425, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.9223, 42.2663 ], [ 112.5425, 37.8733 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NM", "to": "CHN-TJ", "existing capacity + (mw)": 4000.0, "existing capacity - (mw)": -4000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 42.2663, "start_lon": 118.9223, "end_lat": 39.1467, "end_lon": 117.2056, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.9223, 42.2663 ], [ 117.2056, 39.1467 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-NM", "to": "MNG-XX", "existing capacity + (mw)": 260.0, "existing capacity - (mw)": -260.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "There is interest in additional (higher voltage) transmission interconnections between CHN and MNG but as of yet it doesn't seem that any projects are close to actual development.", "other notes": "Power trade agreement running up till 2023 between Mongolia and Inner Mongolia is set at max 260 MW. ", "source existing (2023)": "https://www.unescap.org/sites/default/files/D1-S1b.%20Inner%20Mongolia%20Power%20Group_Mr.%20Yan%20Jun.pdf", "source planned": "https://www.adb.org/sites/default/files/project-documents/48030/48030-001-tacr-en_4.pdf", "existing": 0.26, "planned": 0.0, "start_lat": 42.2663, "start_lon": 118.9223, "end_lat": 46.83623561, "end_lon": 103.0674438, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 118.9223, 42.2663 ], [ 103.0674438, 46.83623561 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-QI", "to": "CHN-TI", "existing capacity + (mw)": 1500.0, "existing capacity - (mw)": -1500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 1.5, "planned": 0.0, "start_lat": 36.6239, "start_lon": 101.7787, "end_lat": 29.6534, "end_lon": 91.1719, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 101.7787, 36.6239 ], [ 91.1719, 29.6534 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-QI", "to": "CHN-XI", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 36.6239, "start_lon": 101.7787, "end_lat": 43.8225, "end_lon": 87.6125, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 101.7787, 36.6239 ], [ 87.6125, 43.8225 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-SC", "to": "CHN-ZH", "existing capacity + (mw)": 8000.0, "existing capacity - (mw)": 0.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Includes existing 8 GW Baihetan - Zhejiang line (HVDC) following Table s4 (capacity not yet included in SWITCH data with 2020 baseline year). Long-distance UHV line to connect renewable resources to demand centers.", "other notes": null, "source existing (2023)": "https://www.cell.com/cms/10.1016/j.joule.2021.10.006/attachment/53103cd8-9db9-479b-8b49-f9957e2b418c/mmc1", "source planned": null, "existing": 4.0, "planned": 0.0, "start_lat": 30.66, "start_lon": 104.0633, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 104.0633, 30.66 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-SD", "to": "CHN-SX", "existing capacity + (mw)": 6500.0, "existing capacity - (mw)": -6500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 6.5, "planned": 0.0, "start_lat": 36.1167, "start_lon": 120.4, "end_lat": 37.8733, "end_lon": 112.5425, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ 120.4, 36.1167 ], [ 112.5425, 37.8733 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-SD", "to": "CHN-TJ", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 36.1167, "start_lon": 120.4, "end_lat": 39.1467, "end_lon": 117.2056, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 120.4, 36.1167 ], [ 117.2056, 39.1467 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-SH", "to": "CHN-ZH", "existing capacity + (mw)": 2500.0, "existing capacity - (mw)": -2500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 2.5, "planned": 0.0, "start_lat": 31.1667, "start_lon": 121.4667, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 121.4667, 31.1667 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-YU", "to": "CHN-ZH", "existing capacity + (mw)": 15200.0, "existing capacity - (mw)": -15200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No data available on lower voltage inter-regional transmission development within China so planned capacities set to 0.", "other notes": "Use of data from SWITCH-China requires citation of number of data sources (see Github page)", "source existing (2023)": "https://github.com/switch-model/switch-china-open-model", "source planned": null, "existing": 15.2, "planned": 0.0, "start_lat": 25.0433, "start_lon": 102.7061, "end_lat": 30.25, "end_lon": 120.1675, "Capacity_Bin": "10-25" }, "geometry": { "type": "LineString", "coordinates": [ [ 102.7061, 25.0433 ], [ 120.1675, 30.25 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-YU", "to": "LAO-XX", "existing capacity + (mw)": 60.0, "existing capacity - (mw)": -60.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": null, "assumptions/applied methods": "In 2022 the existing 110 kV tieline between Laos and Yunnan has been opened for two-way trade whereas historically it was solely operated for Chinese export. No data can be found on the exact power ratings in the new setup, yet we assume that the historical one-way limit (60 MW) can be operational in both directions.", "other notes": "There are also plans for a new 500 kV tieline yet no concrete information regarding power ratings/planned commissioning year.", "source existing (2023)": "https://openinframap.org/#5.85/20.713/105.03", "source planned": "https://www.reuters.com/business/energy/china-general-nuclear-enters-agreement-develop-renewable-energy-base-laos-2023-09-18/", "existing": 0.06, "planned": null, "start_lat": 25.0433, "start_lon": 102.7061, "end_lat": 18.49689545, "end_lon": 103.7665453, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 102.7061, 25.0433 ], [ 103.7665453, 18.49689545 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-YU", "to": "MMR-XX", "existing capacity + (mw)": 228.0, "existing capacity - (mw)": -228.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": null, "assumptions/applied methods": "No data can be found on exact existing transmission capacities, but it is reported that Myanmar imported at max 170 GWh of electricity per month in 2023. Assuming this is close to the maximum available capacity considering supply constraints and large electricity needs in Myanmar (see sources) this equals roughly 228 MW (170 GWh/31 days/24 hours).", "other notes": "Intentions exist to realise a 1 GW intertie between Myanmar and Yunnan (was part of a 2018 development plant in Myanmar) but as to-date has not yet materialized. Initial plans for completion were 2025 but this has been delayed.", "source existing (2023)": "https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf", "source planned": "https://thedocs.worldbank.org/en/doc/6bd0c527c8469333b119d88cc0b8b410-0070062023/original/In-The-Dark-Power-Sector-Challenges-in-Myanmar-August2023.pdf", "existing": 0.228, "planned": 1.0, "start_lat": 25.0433, "start_lon": 102.7061, "end_lat": 21.20596974, "end_lon": 96.51828802, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 102.7061, 25.0433 ], [ 96.51828802, 21.20596974 ] ] } },
{ "type": "Feature", "properties": { "from": "CHN-YU", "to": "VNM-NO", "existing capacity + (mw)": 800.0, "existing capacity - (mw)": -800.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No additional concrete plans found for new lines.", "source existing (2023)": "https://hal.science/hal-02396354/document", "source planned": "https://southeastasiainfra.com/vietnams-power-development-plan-unlocking-res-potential-to-achieve-energy-transition-goals/#:~:text=These%20lines%20are%20expected%20to,through%20110%20kV%20power%20lines.", "existing": 0.8, "planned": 0.0, "start_lat": 25.0433, "start_lon": 102.7061, "end_lat": 21.71658413, "end_lon": 105.0669191, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 102.7061, 25.0433 ], [ 105.0669191, 21.71658413 ] ] } },
{ "type": "Feature", "properties": { "from": "CRI-XX", "to": "NIC-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.3, "planned": 0.3, "start_lat": 9.975245274000001, "start_lon": -84.19466083, "end_lat": 12.93282359, "end_lon": -85.01437766, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.19466083, 9.975245274 ], [ -85.01437766, 12.93282359 ] ] } },
{ "type": "Feature", "properties": { "from": "CRI-XX", "to": "PAN-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.3, "planned": 0.3, "start_lat": 9.975245274000001, "start_lon": -84.19466083, "end_lat": 8.518318742, "end_lon": -80.07976206, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.19466083, 9.975245274 ], [ -80.07976206, 8.518318742 ] ] } },
{ "type": "Feature", "properties": { "from": "CZE-XX", "to": "DEU-XX", "existing capacity + (mw)": 1600.0, "existing capacity - (mw)": -1600.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.6, "planned": 0.5, "start_lat": 49.74046863, "start_lon": 15.33044742, "end_lat": 51.09425219, "end_lon": 10.38776868, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 15.33044742, 49.74046863 ], [ 10.38776868, 51.09425219 ] ] } },
{ "type": "Feature", "properties": { "from": "CZE-XX", "to": "POL-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.4, "planned": 0.0, "start_lat": 49.74046863, "start_lon": 15.33044742, "end_lat": 52.13008475, "end_lon": 19.39299516, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 15.33044742, 49.74046863 ], [ 19.39299516, 52.13008475 ] ] } },
{ "type": "Feature", "properties": { "from": "CZE-XX", "to": "SVK-XX", "existing capacity + (mw)": 1800.0, "existing capacity - (mw)": -1800.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.8, "planned": 0.5, "start_lat": 49.74046863, "start_lon": 15.33044742, "end_lat": 48.7097757, "end_lon": 19.48344002, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 15.33044742, 49.74046863 ], [ 19.48344002, 48.7097757 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "DNK-XX", "existing capacity + (mw)": 3700.0, "existing capacity - (mw)": -3700.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.7, "planned": 1.0, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 55.6761, "end_lon": 12.5683, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 12.5683, 55.6761 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "FRA-XX", "existing capacity + (mw)": 3000.0, "existing capacity - (mw)": -3000.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.0, "planned": 0.3, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 46.62469296, "end_lon": 2.459606421, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 2.459606421, 46.62469296 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "LUX-XX", "existing capacity + (mw)": 2300.0, "existing capacity - (mw)": -2300.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.3, "planned": 1.0, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 49.77696347, "end_lon": 6.093063038, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 6.093063038, 49.77696347 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "NLD-XX", "existing capacity + (mw)": 3950.0, "existing capacity - (mw)": -3950.0, "planned capacity + (mw)": 1050.0, "planned capacity - (mw)": -1050.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.95, "planned": 1.05, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 52.25602025, "end_lon": 5.652414398, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 5.652414398, 52.25602025 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "NOR-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.4, "planned": 0.0, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 64.23470982000001, "end_lon": 13.9782624, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 13.9782624, 64.23470982 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "POL-XX", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 2000.0, "planned capacity - (mw)": -2000.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.0, "planned": 2.0, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 52.13008475, "end_lon": 19.39299516, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 19.39299516, 52.13008475 ] ] } },
{ "type": "Feature", "properties": { "from": "DEU-XX", "to": "SWE-XX", "existing capacity + (mw)": 615.0, "existing capacity - (mw)": -615.0, "planned capacity + (mw)": 700.0, "planned capacity - (mw)": -700.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.615, "planned": 0.7, "start_lat": 51.09425219, "start_lon": 10.38776868, "end_lat": 62.83543578, "end_lon": 16.74571311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 10.38776868, 51.09425219 ], [ 16.74571311, 62.83543578 ] ] } },
{ "type": "Feature", "properties": { "from": "DNK-XX", "to": "NLD-XX", "existing capacity + (mw)": 700.0, "existing capacity - (mw)": -700.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.7, "planned": 0.0, "start_lat": 55.6761, "start_lon": 12.5683, "end_lat": 52.25602025, "end_lon": 5.652414398, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 12.5683, 55.6761 ], [ 5.652414398, 52.25602025 ] ] } },
{ "type": "Feature", "properties": { "from": "DNK-XX", "to": "NOR-XX", "existing capacity + (mw)": 1640.0, "existing capacity - (mw)": -1640.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.64, "planned": 0.0, "start_lat": 55.6761, "start_lon": 12.5683, "end_lat": 64.23470982000001, "end_lon": 13.9782624, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 12.5683, 55.6761 ], [ 13.9782624, 64.23470982 ] ] } },
{ "type": "Feature", "properties": { "from": "DNK-XX", "to": "SWE-XX", "existing capacity + (mw)": 2450.0, "existing capacity - (mw)": -2450.0, "planned capacity + (mw)": 700.0, "planned capacity - (mw)": -700.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.45, "planned": 0.7, "start_lat": 55.6761, "start_lon": 12.5683, "end_lat": 62.83543578, "end_lon": 16.74571311, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 12.5683, 55.6761 ], [ 16.74571311, 62.83543578 ] ] } },
{ "type": "Feature", "properties": { "from": "ESP-XX", "to": "FRA-XX", "existing capacity + (mw)": 2800.0, "existing capacity - (mw)": -2800.0, "planned capacity + (mw)": 2200.0, "planned capacity - (mw)": -2200.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.8, "planned": 2.2, "start_lat": 40.38997543, "start_lon": -3.553604515, "end_lat": 46.62469296, "end_lon": 2.459606421, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -3.553604515, 40.38997543 ], [ 2.459606421, 46.62469296 ] ] } },
{ "type": "Feature", "properties": { "from": "ESP-XX", "to": "PRT-XX", "existing capacity + (mw)": 2300.0, "existing capacity - (mw)": -2700.0, "planned capacity + (mw)": 1900.0, "planned capacity - (mw)": -1500.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.5, "planned": 1.7, "start_lat": 40.38997543, "start_lon": -3.553604515, "end_lat": 39.6859111, "end_lon": -7.963916957, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -3.553604515, 40.38997543 ], [ -7.963916957, 39.6859111 ] ] } },
{ "type": "Feature", "properties": { "from": "EST-XX", "to": "FIN-XX", "existing capacity + (mw)": 1016.0, "existing capacity - (mw)": -1016.0, "planned capacity + (mw)": 700.0, "planned capacity - (mw)": -700.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.016, "planned": 0.7, "start_lat": 59.4372, "start_lon": 24.7453, "end_lat": 64.50727855, "end_lon": 26.27261643, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 24.7453, 59.4372 ], [ 26.27261643, 64.50727855 ] ] } },
{ "type": "Feature", "properties": { "from": "FIN-XX", "to": "SWE-XX", "existing capacity + (mw)": 2400.0, "existing capacity - (mw)": -2400.0, "planned capacity + (mw)": 900.0, "planned capacity - (mw)": -800.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.4, "planned": 0.85, "start_lat": 64.50727855, "start_lon": 26.27261643, "end_lat": 62.83543578, "end_lon": 16.74571311, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 26.27261643, 64.50727855 ], [ 16.74571311, 62.83543578 ] ] } },
{ "type": "Feature", "properties": { "from": "FRA-XX", "to": "GBR-XX", "existing capacity + (mw)": 3000.0, "existing capacity - (mw)": -3000.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.0, "planned": 1.0, "start_lat": 46.62469296, "start_lon": 2.459606421, "end_lat": 51.5072, "end_lon": -0.1275, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.459606421, 46.62469296 ], [ -0.1275, 51.5072 ] ] } },
{ "type": "Feature", "properties": { "from": "FRA-XX", "to": "ITA-XX", "existing capacity + (mw)": 2900.0, "existing capacity - (mw)": -3100.0, "planned capacity + (mw)": 1200.0, "planned capacity - (mw)": -1000.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.0, "planned": 1.1, "start_lat": 46.62469296, "start_lon": 2.459606421, "end_lat": 43.52231674, "end_lon": 12.16397856, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.459606421, 46.62469296 ], [ 12.16397856, 43.52231674 ] ] } },
{ "type": "Feature", "properties": { "from": "FRA-XX", "to": "LUX-XX", "existing capacity + (mw)": 380.0, "existing capacity - (mw)": -380.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.38, "planned": 0.0, "start_lat": 46.62469296, "start_lon": 2.459606421, "end_lat": 49.77696347, "end_lon": 6.093063038, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.459606421, 46.62469296 ], [ 6.093063038, 49.77696347 ] ] } },
{ "type": "Feature", "properties": { "from": "GBR-XX", "to": "IRL-XX", "existing capacity + (mw)": 630.0, "existing capacity - (mw)": -630.0, "planned capacity + (mw)": 1120.0, "planned capacity - (mw)": -1120.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.63, "planned": 1.12, "start_lat": 51.5072, "start_lon": -0.1275, "end_lat": 53.17570403, "end_lon": -8.148837613, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -0.1275, 51.5072 ], [ -8.148837613, 53.17570403 ] ] } },
{ "type": "Feature", "properties": { "from": "GBR-XX", "to": "NLD-XX", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 2000.0, "planned capacity - (mw)": -2000.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.0, "planned": 2.0, "start_lat": 51.5072, "start_lon": -0.1275, "end_lat": 52.25602025, "end_lon": 5.652414398, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -0.1275, 51.5072 ], [ 5.652414398, 52.25602025 ] ] } },
{ "type": "Feature", "properties": { "from": "GBR-XX", "to": "NOR-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 1400.0, "planned capacity - (mw)": -1400.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.4, "planned": 1.4, "start_lat": 51.5072, "start_lon": -0.1275, "end_lat": 64.23470982000001, "end_lon": 13.9782624, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -0.1275, 51.5072 ], [ 13.9782624, 64.23470982 ] ] } },
{ "type": "Feature", "properties": { "from": "GEO-XX", "to": "RUS-SO", "existing capacity + (mw)": 950.0, "existing capacity - (mw)": -950.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2030.0, "assumptions/applied methods": "TTC Winter capacity assumed for existing capacities (Table 1.3) (650 + 300 MW).", "other notes": null, "source existing (2023)": "https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF", "source planned": "https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF", "existing": 0.95, "planned": 1.0, "start_lat": 42.17608505, "start_lon": 43.5193205, "end_lat": 46.49447376, "end_lon": 43.53614697, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 43.5193205, 42.17608505 ], [ 43.53614697, 46.49447376 ] ] } },
{ "type": "Feature", "properties": { "from": "GEO-XX", "to": "TUR-XX", "existing capacity + (mw)": 150.0, "existing capacity - (mw)": -150.0, "planned capacity + (mw)": 1050.0, "planned capacity - (mw)": -1050.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF", "source planned": "https://www.gse.com.ge/sw/static/file/TYNDP_GE-2023-2033_ENG_corr.PDF", "existing": 0.15, "planned": 1.05, "start_lat": 42.17608505, "start_lon": 43.5193205, "end_lat": 38.98806237, "end_lon": 35.4354723, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 43.5193205, 42.17608505 ], [ 35.4354723, 38.98806237 ] ] } },
{ "type": "Feature", "properties": { "from": "GHA-XX", "to": "TGO-XX", "existing capacity + (mw)": 438.0, "existing capacity - (mw)": -438.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "The GHA-TGO section of the WAPP coastal backbone project was synchronized in 2019. No additional planned capacity as of yet.", "source existing (2023)": "https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf", "source planned": "https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf", "existing": 0.438, "planned": 0.0, "start_lat": 5.55, "start_lon": -0.2, "end_lat": 8.536100008, "end_lon": 0.979342961, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -0.2, 5.55 ], [ 0.979342961, 8.536100008 ] ] } },
{ "type": "Feature", "properties": { "from": "GRC-XX", "to": "ITA-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.5, "planned": 0.5, "start_lat": 39.47356038, "start_lon": 22.57828214, "end_lat": 43.52231674, "end_lon": 12.16397856, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 22.57828214, 39.47356038 ], [ 12.16397856, 43.52231674 ] ] } },
{ "type": "Feature", "properties": { "from": "GRC-XX", "to": "MKD-XX", "existing capacity + (mw)": 1100.0, "existing capacity - (mw)": -1100.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.1, "planned": 0.5, "start_lat": 39.47356038, "start_lon": 22.57828214, "end_lat": 41.59923186, "end_lon": 21.69771488, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 22.57828214, 39.47356038 ], [ 21.69771488, 41.59923186 ] ] } },
{ "type": "Feature", "properties": { "from": "GRC-XX", "to": "TUR-XX", "existing capacity + (mw)": 660.0, "existing capacity - (mw)": -660.0, "planned capacity + (mw)": 600.0, "planned capacity - (mw)": -600.0, "year planned": 2045.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.66, "planned": 0.6, "start_lat": 39.47356038, "start_lon": 22.57828214, "end_lat": 38.98806237, "end_lon": 35.4354723, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 22.57828214, 39.47356038 ], [ 35.4354723, 38.98806237 ] ] } },
{ "type": "Feature", "properties": { "from": "GTM-XX", "to": "HND-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.3, "planned": 0.3, "start_lat": 15.69746663, "start_lon": -90.35404831, "end_lat": 14.81733385, "end_lon": -86.61535758, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -90.35404831, 15.69746663 ], [ -86.61535758, 14.81733385 ] ] } },
{ "type": "Feature", "properties": { "from": "GTM-XX", "to": "MEX-XX", "existing capacity + (mw)": 200.0, "existing capacity - (mw)": -200.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "In the CIER document it is mentioned that additional capacity is being studied but no mentioning of capacities nor years. Probably too preliminary to include.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.2, "planned": 0.0, "start_lat": 15.69746663, "start_lon": -90.35404831, "end_lat": 23.94324092, "end_lon": -102.528737, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -90.35404831, 15.69746663 ], [ -102.528737, 23.94324092 ] ] } },
{ "type": "Feature", "properties": { "from": "GTM-XX", "to": "SLV-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.3, "planned": 0.3, "start_lat": 15.69746663, "start_lon": -90.35404831, "end_lat": 13.73257824, "end_lon": -88.87071197, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -90.35404831, 15.69746663 ], [ -88.87071197, 13.73257824 ] ] } },
{ "type": "Feature", "properties": { "from": "HND-XX", "to": "NIC-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.3, "planned": 0.3, "start_lat": 14.81733385, "start_lon": -86.61535758, "end_lat": 12.93282359, "end_lon": -85.01437766, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -86.61535758, 14.81733385 ], [ -85.01437766, 12.93282359 ] ] } },
{ "type": "Feature", "properties": { "from": "HND-XX", "to": "SLV-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Addition of second circuit on existing SIEPAC pathways is planned but no expected commissioning year as of now.", "source existing (2023)": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "source planned": "https://www.cepal.org/sites/default/files/events/files/foreplen_sesion5_cier_0.pdf", "existing": 0.3, "planned": 0.3, "start_lat": 14.81733385, "start_lon": -86.61535758, "end_lat": 13.73257824, "end_lon": -88.87071197, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -86.61535758, 14.81733385 ], [ -88.87071197, 13.73257824 ] ] } },
{ "type": "Feature", "properties": { "from": "HRV-XX", "to": "HUN-XX", "existing capacity + (mw)": 1700.0, "existing capacity - (mw)": -1700.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.7, "planned": 0.0, "start_lat": 45.13633668, "start_lon": 16.41248911, "end_lat": 47.16747903, "end_lon": 19.41463251, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 16.41248911, 45.13633668 ], [ 19.41463251, 47.16747903 ] ] } },
{ "type": "Feature", "properties": { "from": "HRV-XX", "to": "SRB-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 600.0, "planned capacity - (mw)": -600.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.5, "planned": 0.6, "start_lat": 45.13633668, "start_lon": 16.41248911, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 16.41248911, 45.13633668 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "HRV-XX", "to": "SVN-XX", "existing capacity + (mw)": 2000.0, "existing capacity - (mw)": -2000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 2.0, "planned": 0.0, "start_lat": 45.13633668, "start_lon": 16.41248911, "end_lat": 46.12398239, "end_lon": 14.81686361, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 16.41248911, 45.13633668 ], [ 14.81686361, 46.12398239 ] ] } },
{ "type": "Feature", "properties": { "from": "HUN-XX", "to": "ROU-XX", "existing capacity + (mw)": 1100.0, "existing capacity - (mw)": -1100.0, "planned capacity + (mw)": 617.0, "planned capacity - (mw)": -335.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.1, "planned": 0.476, "start_lat": 47.16747903, "start_lon": 19.41463251, "end_lat": 45.84001507, "end_lon": 24.98565451, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.41463251, 47.16747903 ], [ 24.98565451, 45.84001507 ] ] } },
{ "type": "Feature", "properties": { "from": "HUN-XX", "to": "SRB-XX", "existing capacity + (mw)": 750.0, "existing capacity - (mw)": -750.0, "planned capacity + (mw)": 500.0, "planned capacity - (mw)": -500.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.75, "planned": 0.5, "start_lat": 47.16747903, "start_lon": 19.41463251, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.41463251, 47.16747903 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "HUN-XX", "to": "SVK-XX", "existing capacity + (mw)": 1800.0, "existing capacity - (mw)": -1300.0, "planned capacity + (mw)": 800.0, "planned capacity - (mw)": -1300.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.55, "planned": 1.05, "start_lat": 47.16747903, "start_lon": 19.41463251, "end_lat": 48.7097757, "end_lon": 19.48344002, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.41463251, 47.16747903 ], [ 19.48344002, 48.7097757 ] ] } },
{ "type": "Feature", "properties": { "from": "HUN-XX", "to": "UKR-XX", "existing capacity + (mw)": 650.0, "existing capacity - (mw)": -650.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.65, "planned": 0.0, "start_lat": 47.16747903, "start_lon": 19.41463251, "end_lat": 49.00834161, "end_lon": 31.40576366, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.41463251, 47.16747903 ], [ 31.40576366, 49.00834161 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-EA", "to": "NPL-XX", "existing capacity + (mw)": 700.0, "existing capacity - (mw)": -700.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": 2024.0, "assumptions/applied methods": "Internal 400 kV within Nepal is being build which will allow the NTC for the existing 400 kV line into India (Dhalkebar-Muzaffarpur) to be increased to 1 GW (agreements are in place). This 300 MW of additional NTC is added as new planned capacity for 2024. There are a number of low voltage lines existing between IND and NPL yet are not connected to the main grids and hence not included (capacities are also unknown).", "other notes": null, "source existing (2023)": "https://powermin.gov.in/en/content/interconnection-neighbouring-countries", "source planned": "https://kathmandupost.com/national/2023/09/21/nepal-india-reach-deal-on-boosting-cross-border-power-transmission", "existing": 0.7, "planned": 0.3, "start_lat": 22.5675, "start_lon": 88.37, "end_lat": 28.25932313, "end_lon": 83.94561026, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 88.37, 22.5675 ], [ 83.94561026, 28.25932313 ] ] } },
{ "type": "Feature", "properties": { "from": "IND-NO", "to": "NPL-XX", "existing capacity + (mw)": 70.0, "existing capacity - (mw)": -70.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": 2024.0, "assumptions/applied methods": "Existing includes 70 MW 132 kv line (Mahendranagar-Tankapur). Also new 132 kv line being finalized in October 2023 (Nautanwa-Mainaiya) but MW capacity is unkown. Also new 132 kv line planned for 2024 (Kohalpur-Nanpara) but MW capacity is unkown. There are a number of low voltage lines existing between IND and NPL yet are not connected to the main grids and hence not included (capacities are also unknown).", "other notes": null, "source existing (2023)": "https://kathmandupost.com/national/2023/09/06/nepal-now-can-export-180-mw-more-electricity-to-india", "source planned": null, "existing": 0.07, "planned": null, "start_lat": 28.50206713, "start_lon": 76.73261986, "end_lat": 28.25932313, "end_lon": 83.94561026, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 76.73261986, 28.50206713 ], [ 83.94561026, 28.25932313 ] ] } },
{ "type": "Feature", "properties": { "from": "ITA-XX", "to": "MLT-XX", "existing capacity + (mw)": 200.0, "existing capacity - (mw)": -200.0, "planned capacity + (mw)": 200.0, "planned capacity - (mw)": -200.0, "year planned": 2045.0, "assumptions/applied methods": "The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.", "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.2, "planned": 0.2, "start_lat": 43.52231674, "start_lon": 12.16397856, "end_lat": 35.88968685, "end_lon": 14.43793819, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 12.16397856, 43.52231674 ], [ 14.43793819, 35.88968685 ] ] } },
{ "type": "Feature", "properties": { "from": "ITA-XX", "to": "MNE-XX", "existing capacity + (mw)": 600.0, "existing capacity - (mw)": -600.0, "planned capacity + (mw)": 600.0, "planned capacity - (mw)": -600.0, "year planned": 2040.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.6, "planned": 0.6, "start_lat": 43.52231674, "start_lon": 12.16397856, "end_lat": 42.77700853, "end_lon": 19.23854506, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 12.16397856, 43.52231674 ], [ 19.23854506, 42.77700853 ] ] } },
{ "type": "Feature", "properties": { "from": "ITA-XX", "to": "SVN-XX", "existing capacity + (mw)": 660.0, "existing capacity - (mw)": -660.0, "planned capacity + (mw)": 10.0, "planned capacity - (mw)": -50.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.66, "planned": 0.03, "start_lat": 43.52231674, "start_lon": 12.16397856, "end_lat": 46.12398239, "end_lon": 14.81686361, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 12.16397856, 43.52231674 ], [ 14.81686361, 46.12398239 ] ] } },
{ "type": "Feature", "properties": { "from": "KAZ-XX", "to": "KGZ-XX", "existing capacity + (mw)": 2790.0, "existing capacity - (mw)": -2790.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ", "other notes": "No planned lines on KAZ grid map that is up to date as of 2023.", "source existing (2023)": "https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf", "source planned": "https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf", "existing": 2.79, "planned": 0.0, "start_lat": 48.15795576, "start_lon": 67.25883617, "end_lat": 41.46570705, "end_lon": 74.53658343, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 67.25883617, 48.15795576 ], [ 74.53658343, 41.46570705 ] ] } },
{ "type": "Feature", "properties": { "from": "KAZ-XX", "to": "RUS-MV", "existing capacity + (mw)": 10.0, "existing capacity - (mw)": -10.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. Existing capacities are from Table 3.1 (translated from Russian).", "source existing (2023)": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 0.01, "planned": 0.0, "start_lat": 48.15795576, "start_lon": 67.25883617, "end_lat": 55.4970523, "end_lon": 51.57009313, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 67.25883617, 48.15795576 ], [ 51.57009313, 55.4970523 ] ] } },
{ "type": "Feature", "properties": { "from": "KAZ-XX", "to": "RUS-SI", "existing capacity + (mw)": 50.0, "existing capacity - (mw)": -50.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. Existing capacities are from Table 3.1 (translated from Russian).", "source existing (2023)": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 0.05, "planned": 0.0, "start_lat": 48.15795576, "start_lon": 67.25883617, "end_lat": 61.61896612, "end_lon": 96.98990766, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 67.25883617, 48.15795576 ], [ 96.98990766, 61.61896612 ] ] } },
{ "type": "Feature", "properties": { "from": "KAZ-XX", "to": "RUS-SO", "existing capacity + (mw)": 10.0, "existing capacity - (mw)": -10.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. Existing capacities are from Table 3.1 (translated from Russian).", "source existing (2023)": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 0.01, "planned": 0.0, "start_lat": 48.15795576, "start_lon": 67.25883617, "end_lat": 46.49447376, "end_lon": 43.53614697, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 67.25883617, 48.15795576 ], [ 43.53614697, 46.49447376 ] ] } },
{ "type": "Feature", "properties": { "from": "KAZ-XX", "to": "RUS-UR", "existing capacity + (mw)": 280.0, "existing capacity - (mw)": -280.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No mentioning of new lines in Russian policy document/no new planned lines on KAZ grid map that is up to date as of 2023. Existing capacities are from Table 3.1 (translated from Russian).", "source existing (2023)": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 0.28, "planned": 0.0, "start_lat": 48.15795576, "start_lon": 67.25883617, "end_lat": 63.08817518, "end_lon": 70.74517627, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 67.25883617, 48.15795576 ], [ 70.74517627, 63.08817518 ] ] } },
{ "type": "Feature", "properties": { "from": "KAZ-XX", "to": "UZB-XX", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "No planned lines on KAZ grid map that is up to date as of 2023.", "source existing (2023)": "https://iea.blob.core.windows.net/assets/0d00581c-dc3c-466f-b0c8-97d25112a6e0/Uzbekistan2022.pdf", "source planned": "https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf", "existing": 1.0, "planned": 0.0, "start_lat": 48.15795576, "start_lon": 67.25883617, "end_lat": 41.75204379, "end_lon": 63.16537477, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 67.25883617, 48.15795576 ], [ 63.16537477, 41.75204379 ] ] } },
{ "type": "Feature", "properties": { "from": "KGZ-XX", "to": "TJK-XX", "existing capacity + (mw)": 130.0, "existing capacity - (mw)": -130.0, "planned capacity + (mw)": 1300.0, "planned capacity - (mw)": -1300.0, "year planned": 2025.0, "assumptions/applied methods": "Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ", "other notes": null, "source existing (2023)": "https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf", "source planned": "https://iea.blob.core.windows.net/assets/b066e0be-9a3f-49ca-b932-38a1e81bda2a/Cross-BorderTradingforTajikistan_ARoadmap.pdf", "existing": 0.13, "planned": 1.3, "start_lat": 41.46570705, "start_lon": 74.53658343, "end_lat": 38.52714131, "end_lon": 71.03844325, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 74.53658343, 41.46570705 ], [ 71.03844325, 38.52714131 ] ] } },
{ "type": "Feature", "properties": { "from": "KGZ-XX", "to": "UZB-XX", "existing capacity + (mw)": 2830.0, "existing capacity - (mw)": -2830.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumed power factor of 1 by converting MVA into MW. See Table 3.12 in the UNECE report for existing line data. ", "other notes": "No planned lines on KAZ grid map that is up to date as of 2023 and includes major lines of KGZ and UZB.", "source existing (2023)": "https://unece.org/sites/default/files/2023-11/EN_Energy%20Connectivity%20in%20Central%20Asia_V2.pdf", "source planned": "https://www.kegoc.kz/%D0%9A%D0%B0%D1%80%D1%82%D0%B0%20%D1%81%D1%85%D0%B5%D0%BC%D0%B0%20%D0%95%D0%AD%D0%A1%20%D0%9A%D0%B0%D0%B7%D0%B0%D1%85%D1%81%D1%82%D0%B0%D0%BD%D0%B0-2023%20%D0%B4%D0%B5%D0%B9%D1%81%D1%82%D0%B2%20%20eng.pdf", "existing": 2.83, "planned": 0.0, "start_lat": 41.46570705, "start_lon": 74.53658343, "end_lat": 41.75204379, "end_lon": 63.16537477, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 74.53658343, 41.46570705 ], [ 63.16537477, 41.75204379 ] ] } },
{ "type": "Feature", "properties": { "from": "KHM-XX", "to": "LAO-XX", "existing capacity + (mw)": 2600.0, "existing capacity - (mw)": -2600.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "New 500 kV line (2.4 GW) operational since 2023 on top of existing 200 MW line operational since 2020. There is ambition for total transmission capacity between both countries to reach 6 GW by 2030 but no specific addititional projects can be found as of yet hence these estimated capacities are not included.", "source existing (2023)": "https://www.bangkokpost.com/business/1831359/laos-links-195mw-power-to-cambodia", "source planned": "https://laotiantimes.com/2023/01/06/laos-cambodia-to-cooperate-in-power-transmission-line-project/", "existing": 2.6, "planned": 0.0, "start_lat": 12.71265457, "start_lon": 104.9186366, "end_lat": 18.49689545, "end_lon": 103.7665453, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 104.9186366, 12.71265457 ], [ 103.7665453, 18.49689545 ] ] } },
{ "type": "Feature", "properties": { "from": "KOS-XX", "to": "MKD-XX", "existing capacity + (mw)": 519.0, "existing capacity - (mw)": -630.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. No mentioning of new capacity in Kosovo's TSO's network development plan.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf", "existing": 0.5745, "planned": 0.0, "start_lat": 42.6633, "start_lon": 21.1622, "end_lat": 41.59923186, "end_lon": 21.69771488, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 21.1622, 42.6633 ], [ 21.69771488, 41.59923186 ] ] } },
{ "type": "Feature", "properties": { "from": "KOS-XX", "to": "MNE-XX", "existing capacity + (mw)": 553.0, "existing capacity - (mw)": -502.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. No mentioning of new capacity in Kosovo's TSO's network development plan.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf", "existing": 0.5275, "planned": 0.0, "start_lat": 42.6633, "start_lon": 21.1622, "end_lat": 42.77700853, "end_lon": 19.23854506, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 21.1622, 42.6633 ], [ 19.23854506, 42.77700853 ] ] } },
{ "type": "Feature", "properties": { "from": "KOS-XX", "to": "SRB-XX", "existing capacity + (mw)": 574.0, "existing capacity - (mw)": -709.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. No mentioning of new capacity in Kosovo's TSO's network development plan.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.ero-ks.org/zrre/sites/default/files/Lajmet/njoftimet/221118_KOSTT_Transmission%20Development%20Plan%202023-2032_ver.0.1.pdf", "existing": 0.6415, "planned": 0.0, "start_lat": 42.6633, "start_lon": 21.1622, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 21.1622, 42.6633 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "LTU-XX", "to": "LVA-XX", "existing capacity + (mw)": 950.0, "existing capacity - (mw)": -950.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.95, "planned": 0.0, "start_lat": 55.33486135, "start_lon": 23.908221, "end_lat": 56.85293162, "end_lon": 24.93142925, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.908221, 55.33486135 ], [ 24.93142925, 56.85293162 ] ] } },
{ "type": "Feature", "properties": { "from": "LTU-XX", "to": "SWE-XX", "existing capacity + (mw)": 700.0, "existing capacity - (mw)": -700.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.7, "planned": 0.0, "start_lat": 55.33486135, "start_lon": 23.908221, "end_lat": 62.83543578, "end_lon": 16.74571311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.908221, 55.33486135 ], [ 16.74571311, 62.83543578 ] ] } },
{ "type": "Feature", "properties": { "from": "MDA-XX", "to": "ROU-XX", "existing capacity + (mw)": 416.0, "existing capacity - (mw)": -1210.0, "planned capacity + (mw)": 200.0, "planned capacity - (mw)": -200.0, "year planned": 2026.0, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.economica.net/linia-electrica-suceava-balti-prin-care-reteaua-republicii-moldova-se-leaga-la-cea-romaneaca-pe-lista-cu-proiecte-propuse-de-romania-pentru-finantare-din-repowereu_655289.html", "existing": 0.813, "planned": 0.2, "start_lat": 47.20467676, "start_lon": 28.46846064, "end_lat": 45.84001507, "end_lon": 24.98565451, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 28.46846064, 47.20467676 ], [ 24.98565451, 45.84001507 ] ] } },
{ "type": "Feature", "properties": { "from": "MDA-XX", "to": "UKR-XX", "existing capacity + (mw)": 984.0, "existing capacity - (mw)": -489.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that max historical hourly flow between 2021-2023 is representative for directional transmission capacity. UKR and MDA synchronized in 2022 and started exchange. This is likely to be expanded but to-date no concrete plans for new lines.", "other notes": "This approach is used more often to derive capacities for lines outside the direct ENTSOE zones. See e.g. http://www.diva-portal.org/smash/get/diva2:1476768/FULLTEXT01.pdf", "source existing (2023)": "https://transparency.entsoe.eu/transmission-domain/physicalFlow/show", "source planned": "https://www.atlanticcouncil.org/blogs/ukrainealert/disarming-russias-energy-weapon-ukraine-begins-electricity-exports-to-moldova/", "existing": 0.7365, "planned": 0.0, "start_lat": 47.20467676, "start_lon": 28.46846064, "end_lat": 49.00834161, "end_lon": 31.40576366, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 28.46846064, 47.20467676 ], [ 31.40576366, 49.00834161 ] ] } },
{ "type": "Feature", "properties": { "from": "MEX-XX", "to": "USA-CI", "existing capacity + (mw)": 800.0, "existing capacity - (mw)": -600.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "As of now no new concrete plans for transmission links between Mexico and California. Baja Californica is not integrated with SIN which limits potential for new projects except for connections with individual plants.", "source existing (2023)": "https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf", "source planned": "https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf", "existing": 0.7, "planned": 0.0, "start_lat": 23.94324092, "start_lon": -102.528737, "end_lat": 37.7558, "end_lon": -122.4449, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -102.528737, 23.94324092 ], [ -122.4449, 37.7558 ] ] } },
{ "type": "Feature", "properties": { "from": "MEX-XX", "to": "USA-ER", "existing capacity + (mw)": 400.0, "existing capacity - (mw)": -940.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "In addition to the reported capacities, a number of additional smaller lines exist between the service area of ERCOT and Mexico but is for emergency use only and not for regular trade purposes so not included.", "other notes": "No new lines planned as of now since existing lines fall outside FERC plenary jurisdiction but that is different with potential new lines.", "source existing (2023)": "https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf", "source planned": "https://www.wilsoncenter.org/sites/default/files/media/uploads/documents/US%20Mexico%20Grid%20Integration%20McNeece_Irastorza_Martin.pdf", "existing": 0.67, "planned": 0.0, "start_lat": 23.94324092, "start_lon": -102.528737, "end_lat": 32.7935, "end_lon": -96.7667, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -102.528737, 23.94324092 ], [ -96.7667, 32.7935 ] ] } },
{ "type": "Feature", "properties": { "from": "MKD-XX", "to": "SRB-XX", "existing capacity + (mw)": 540.0, "existing capacity - (mw)": -540.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.54, "planned": 0.0, "start_lat": 41.59923186, "start_lon": 21.69771488, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 21.69771488, 41.59923186 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "MNE-XX", "to": "SRB-XX", "existing capacity + (mw)": 580.0, "existing capacity - (mw)": -580.0, "planned capacity + (mw)": 20.0, "planned capacity - (mw)": -500.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.58, "planned": 0.26, "start_lat": 42.77700853, "start_lon": 19.23854506, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.23854506, 42.77700853 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "MNG-XX", "to": "RUS-SI", "existing capacity + (mw)": 345.0, "existing capacity - (mw)": -345.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 0.345, "planned": 0.0, "start_lat": 46.83623561, "start_lon": 103.0674438, "end_lat": 61.61896612, "end_lon": 96.98990766, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 103.0674438, 46.83623561 ], [ 96.98990766, 61.61896612 ] ] } },
{ "type": "Feature", "properties": { "from": "MRT-XX", "to": "SEN-XX", "existing capacity + (mw)": 250.0, "existing capacity - (mw)": -250.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Existing 250 MW transmission line (see appendix A of Power Africa report) commissioned in 2022. No additional projects between MRT and SEN identified as of yet.", "source existing (2023)": "https://www.usaid.gov/sites/default/files/2022-05/PA_Transmission_Roadmap_508.pdf", "source planned": "https://www.usaid.gov/sites/default/files/2022-05/PA_Transmission_Roadmap_508.pdf", "existing": 0.25, "planned": 0.0, "start_lat": 20.26404438, "start_lon": -10.33471525, "end_lat": 14.35888496, "end_lon": -14.47148562, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -10.33471525, 20.26404438 ], [ -14.47148562, 14.35888496 ] ] } },
{ "type": "Feature", "properties": { "from": "MYS-PE", "to": "SGP-XX", "existing capacity + (mw)": 1000.0, "existing capacity - (mw)": -1000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": "Except for discussions about a transmission link between Sarawak (MYSSK) and Singapore no plans found regarding planned transmission capacity beyond the increase to 1000 MW bilateral capacity in 2022/2023. ", "source existing (2023)": "https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.", "source planned": "https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.", "existing": 1.0, "planned": 0.0, "start_lat": 4.035568597, "start_lon": 102.1787887, "end_lat": 1.357439209, "end_lon": 103.8091197, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 102.1787887, 4.035568597 ], [ 103.8091197, 1.357439209 ] ] } },
{ "type": "Feature", "properties": { "from": "MYS-PE", "to": "THA-XX", "existing capacity + (mw)": 380.0, "existing capacity - (mw)": -380.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ieeexplore.ieee.org/document/1177614", "source planned": "https://southeastasiainfra.com/malaysias-tmb-developing-the-grid-of-the-future/#:~:text=In%20October%202022%2C%20the%20interconnector,MW%20of%20bidirectional%20electricity%20flow.", "existing": 0.38, "planned": 0.0, "start_lat": 4.035568597, "start_lon": 102.1787887, "end_lat": 15.110827, "end_lon": 101.0143276, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 102.1787887, 4.035568597 ], [ 101.0143276, 15.110827 ] ] } },
{ "type": "Feature", "properties": { "from": "NLD-XX", "to": "NOR-XX", "existing capacity + (mw)": 700.0, "existing capacity - (mw)": -700.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.7, "planned": 0.0, "start_lat": 52.25602025, "start_lon": 5.652414398, "end_lat": 64.23470982000001, "end_lon": 13.9782624, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 5.652414398, 52.25602025 ], [ 13.9782624, 64.23470982 ] ] } },
{ "type": "Feature", "properties": { "from": "NOR-XX", "to": "SWE-XX", "existing capacity + (mw)": 3695.0, "existing capacity - (mw)": -3695.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 3.695, "planned": 0.0, "start_lat": 64.23470982000001, "start_lon": 13.9782624, "end_lat": 62.83543578, "end_lon": 16.74571311, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 13.9782624, 64.23470982 ], [ 16.74571311, 62.83543578 ] ] } },
{ "type": "Feature", "properties": { "from": "POL-XX", "to": "SVK-XX", "existing capacity + (mw)": 1980.0, "existing capacity - (mw)": -1980.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 1.98, "planned": 0.0, "start_lat": 52.13008475, "start_lon": 19.39299516, "end_lat": 48.7097757, "end_lon": 19.48344002, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.39299516, 52.13008475 ], [ 19.48344002, 48.7097757 ] ] } },
{ "type": "Feature", "properties": { "from": "POL-XX", "to": "SWE-XX", "existing capacity + (mw)": 600.0, "existing capacity - (mw)": -600.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.6, "planned": 0.0, "start_lat": 52.13008475, "start_lon": 19.39299516, "end_lat": 62.83543578, "end_lon": 16.74571311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.39299516, 52.13008475 ], [ 16.74571311, 62.83543578 ] ] } },
{ "type": "Feature", "properties": { "from": "POL-XX", "to": "UKR-XX", "existing capacity + (mw)": 1215.0, "existing capacity - (mw)": -1215.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Following the news report, existing capacity as of early 2023 is estimated to be roughly 1215 MW following the synchronization of Ukraine with the ENTSO-E service area.", "other notes": "New 400 kV line entered service in 2023. UKR synchronized with POL (ENTSOE) so further expansion can be expected but no concrete plans can be found as of yet.", "source existing (2023)": "https://ubn.news/ukraine-and-poland-are-upgrading-the-interstate-transmission-line/", "source planned": null, "existing": 1.215, "planned": 0.0, "start_lat": 52.13008475, "start_lon": 19.39299516, "end_lat": 49.00834161, "end_lon": 31.40576366, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.39299516, 52.13008475 ], [ 31.40576366, 49.00834161 ] ] } },
{ "type": "Feature", "properties": { "from": "ROU-XX", "to": "SRB-XX", "existing capacity + (mw)": 680.0, "existing capacity - (mw)": -680.0, "planned capacity + (mw)": 844.0, "planned capacity - (mw)": -600.0, "year planned": 2030.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.68, "planned": 0.722, "start_lat": 45.84001507, "start_lon": 24.98565451, "end_lat": 44.22627653, "end_lon": 20.78172182, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 24.98565451, 45.84001507 ], [ 20.78172182, 44.22627653 ] ] } },
{ "type": "Feature", "properties": { "from": "ROU-XX", "to": "UKR-XX", "existing capacity + (mw)": 150.0, "existing capacity - (mw)": -150.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.15, "planned": 0.0, "start_lat": 45.84001507, "start_lon": 24.98565451, "end_lat": 49.00834161, "end_lon": 31.40576366, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 24.98565451, 45.84001507 ], [ 31.40576366, 49.00834161 ] ] } },
{ "type": "Feature", "properties": { "from": "RUS-CE", "to": "RUS-MV", "existing capacity + (mw)": 3500.0, "existing capacity - (mw)": -3500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. No planned capacities reported in Russian development plan (translated from Russian).", "other notes": null, "source existing (2023)": "https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 3.5, "planned": 0.0, "start_lat": 54.86169262, "start_lon": 38.11446937, "end_lat": 55.4970523, "end_lon": 51.57009313, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 38.11446937, 54.86169262 ], [ 51.57009313, 55.4970523 ] ] } },
{ "type": "Feature", "properties": { "from": "RUS-CE", "to": "RUS-NW", "existing capacity + (mw)": 1500.0, "existing capacity - (mw)": -1500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. Voltage and Distance values (750 kV and 473 km) has been added for a new line commissioned in 2022, however, no MW values have been found for this line. No planned capacities reported in Russian development plan (translated from Russian).", "other notes": null, "source existing (2023)": "https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 1.5, "planned": 0.0, "start_lat": 54.86169262, "start_lon": 38.11446937, "end_lat": 59.95, "end_lon": 30.3167, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 38.11446937, 54.86169262 ], [ 30.3167, 59.95 ] ] } },
{ "type": "Feature", "properties": { "from": "RUS-CE", "to": "RUS-SO", "existing capacity + (mw)": 2400.0, "existing capacity - (mw)": -2400.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. No planned capacities reported in Russian development plan (translated from Russian).", "other notes": null, "source existing (2023)": "https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 2.4, "planned": 0.0, "start_lat": 54.86169262, "start_lon": 38.11446937, "end_lat": 46.49447376, "end_lon": 43.53614697, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 38.11446937, 54.86169262 ], [ 43.53614697, 46.49447376 ] ] } },
{ "type": "Feature", "properties": { "from": "RUS-MV", "to": "RUS-UR", "existing capacity + (mw)": 3000.0, "existing capacity - (mw)": -3000.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. No planned capacities reported in Russian development plan (translated from Russian).", "other notes": null, "source existing (2023)": "https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 3.0, "planned": 0.0, "start_lat": 55.4970523, "start_lon": 51.57009313, "end_lat": 63.08817518, "end_lon": 70.74517627, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 51.57009313, 55.4970523 ], [ 70.74517627, 63.08817518 ] ] } },
{ "type": "Feature", "properties": { "from": "RUS-SI", "to": "RUS-UR", "existing capacity + (mw)": 3300.0, "existing capacity - (mw)": -3300.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": 2028.0, "assumptions/applied methods": "Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. Planned capacity consists of a planned 500 kV line between the Kurgan region (RUSUR) and the Tyumen region (RUSSI). No values in MW provided by the relevant source (translated from Russian). Voltage and Distance values (500 kV and 342.5 km) has been added for a new line commissioned in 2022, however, no MW values have been found for this line.", "other notes": null, "source existing (2023)": "https://esci-ksp.org/wp/wp-content/uploads/2014/04/S1-04e.pdf", "source planned": "https://www.garant.ru/products/ipo/prime/doc/404487690/", "existing": 3.3, "planned": null, "start_lat": 61.61896612, "start_lon": 96.98990766, "end_lat": 63.08817518, "end_lon": 70.74517627, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 96.98990766, 61.61896612 ], [ 70.74517627, 63.08817518 ] ] } },
{ "type": "Feature", "properties": { "from": "SVK-XX", "to": "UKR-XX", "existing capacity + (mw)": 650.0, "existing capacity - (mw)": -650.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "source planned": "https://ember-climate.org/data/data-tools/electricity-interconnection-europe/", "existing": 0.65, "planned": 0.0, "start_lat": 48.7097757, "start_lon": 19.48344002, "end_lat": 49.00834161, "end_lon": 31.40576366, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 19.48344002, 48.7097757 ], [ 31.40576366, 49.00834161 ] ] } },
{ "type": "Feature", "properties": { "from": "BDI-XX", "to": "COD-XX", "existing capacity + (mw)": 30.0, "existing capacity - (mw)": -30.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": null, "assumptions/applied methods": "Planned Interconnection - relates to the Ruzizi IV Hydropower Plant, which will feed into the grids of Burundi-DRC-Rwanda by means of 220 kV lines. However, this does not directly integrate the systems of the involved countries. Except for the reported transmission distance, no additional project info exists as of yet.", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005", "source planned": "https://www.usaid.gov/sites/default/files/2022-05/PA_Transmission_Roadmap_508.pdf", "existing": 0.03, "planned": null, "start_lat": -3.3833, "start_lon": 29.3667, "end_lat": -2.881186814, "end_lon": 23.66027837, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 29.3667, -3.3833 ], [ 23.66027837, -2.881186814 ] ] } },
{ "type": "Feature", "properties": { "from": "BDI-XX", "to": "RWA-XX", "existing capacity + (mw)": 30.0, "existing capacity - (mw)": -30.0, "planned capacity + (mw)": 250.0, "planned capacity - (mw)": -250.0, "year planned": 2025.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005", "source planned": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005", "existing": 0.03, "planned": 0.25, "start_lat": -3.3833, "start_lon": 29.3667, "end_lat": -2.001181385, "end_lon": 29.92630177, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 29.3667, -3.3833 ], [ 29.92630177, -2.001181385 ] ] } },
{ "type": "Feature", "properties": { "from": "BEN-XX", "to": "GHA-XX", "existing capacity + (mw)": 450.0, "existing capacity - (mw)": -450.0, "planned capacity + (mw)": 650.0, "planned capacity - (mw)": -650.0, "year planned": null, "assumptions/applied methods": "Dorsale 330 kV (Ghana, Togo/Benin, Côte d’Ivoire). Planned capacity is in reference to the WAPP Coastal Transmission Backbone. MW is sourced from P47 from IRENA source", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S0973082618300590?casa_token=SrOwfLg65s4AAAAA:WqgQ4EnyuHDmuM1rUZCNXgdEcHgbKSU-Cp1Jk7yupC7JuT0PaW53KmWr4FLhGnnZqOGiyARnMg", "source planned": null, "existing": 0.45, "planned": 0.65, "start_lat": 6.3667, "start_lon": 2.4333, "end_lat": 5.55, "end_lon": -0.2, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.4333, 6.3667 ], [ -0.2, 5.55 ] ] } },
{ "type": "Feature", "properties": { "from": "BEN-XX", "to": "NGA-XX", "existing capacity + (mw)": 210.0, "existing capacity - (mw)": -210.0, "planned capacity + (mw)": 650.0, "planned capacity - (mw)": -650.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf", "source planned": "https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf", "existing": 0.21, "planned": 0.65, "start_lat": 6.3667, "start_lon": 2.4333, "end_lat": 9.617324131, "end_lon": 8.108524438, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.4333, 6.3667 ], [ 8.108524438, 9.617324131 ] ] } },
{ "type": "Feature", "properties": { "from": "BEN-XX", "to": "TGO-XX", "existing capacity + (mw)": 345.0, "existing capacity - (mw)": -345.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "This appears to be upgrade of existing line", "other notes": null, "source existing (2023)": "https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Nov/IRENA_Planning_West_Africa_2018.pdf", "source planned": "https://www.au-pida.org/view-project/2006/", "existing": 0.345, "planned": 0.0, "start_lat": 6.3667, "start_lon": 2.4333, "end_lat": 8.536100008, "end_lon": 0.979342961, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.4333, 6.3667 ], [ 0.979342961, 8.536100008 ] ] } },
{ "type": "Feature", "properties": { "from": "BFA-XX", "to": "CIV-XX", "existing capacity + (mw)": 113.0, "existing capacity - (mw)": -113.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf", "source planned": "https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf", "existing": 0.113, "planned": 0.0, "start_lat": 12.2766677, "start_lon": -1.744797825, "end_lat": 7.62505631, "end_lon": -5.55467423, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -1.744797825, 12.2766677 ], [ -5.55467423, 7.62505631 ] ] } },
{ "type": "Feature", "properties": { "from": "BFA-XX", "to": "GHA-XX", "existing capacity + (mw)": 100.0, "existing capacity - (mw)": -100.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Bolgatanga-Ouagadougou (225 kV) line appears to be completed - confirmed with Open Infra Map", "other notes": null, "source existing (2023)": "https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf", "source planned": null, "existing": 0.1, "planned": 0.0, "start_lat": 12.2766677, "start_lon": -1.744797825, "end_lat": 5.55, "end_lon": -0.2, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -1.744797825, 12.2766677 ], [ -0.2, 5.55 ] ] } },
{ "type": "Feature", "properties": { "from": "BWA-XX", "to": "ZAF-XX", "existing capacity + (mw)": 615.0, "existing capacity - (mw)": -615.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No planned interconnector on SAPP interconnector website", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S0973082621000442?casa_token=kprlKh7Cjp8AAAAA:xOZHGolZ0dqApDILLrrDPDKCIypnTPGOUK81f9gnQ1Pu0RqQF9AM7L-iK73wGe8p5KWnRQzBlQ#f0010", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 0.615, "planned": 0.0, "start_lat": -22.18836455, "start_lon": 23.81395109, "end_lat": -28.99669244, "end_lon": 25.08613403, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.81395109, -22.18836455 ], [ 25.08613403, -28.99669244 ] ] } },
{ "type": "Feature", "properties": { "from": "BWA-XX", "to": "ZMB-XX", "existing capacity + (mw)": 250.0, "existing capacity - (mw)": -250.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": "Planned capacity is in reference to the ZiZaBoNa project", "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "https://www.au-pida.org/view-project/727/", "existing": 0.25, "planned": 0.3, "start_lat": -22.18836455, "start_lon": 23.81395109, "end_lat": -13.4567959, "end_lon": 27.79137026, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.81395109, -22.18836455 ], [ 27.79137026, -13.4567959 ] ] } },
{ "type": "Feature", "properties": { "from": "BWA-XX", "to": "ZWE-XX", "existing capacity + (mw)": 420.0, "existing capacity - (mw)": -420.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": "Planned capacity is in reference to the ZiZaBoNa project", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S0973082621000442?casa_token=kprlKh7Cjp8AAAAA:xOZHGolZ0dqApDILLrrDPDKCIypnTPGOUK81f9gnQ1Pu0RqQF9AM7L-iK73wGe8p5KWnRQzBlQ#f0010", "source planned": "https://www.au-pida.org/view-project/727/", "existing": 0.42, "planned": 0.3, "start_lat": -22.18836455, "start_lon": 23.81395109, "end_lat": -19.00057628, "end_lon": 29.87071217, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.81395109, -22.18836455 ], [ 29.87071217, -19.00057628 ] ] } },
{ "type": "Feature", "properties": { "from": "CIV-XX", "to": "GHA-XX", "existing capacity + (mw)": 280.0, "existing capacity - (mw)": -280.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Currently ongoing a reinforcement project", "other notes": null, "source existing (2023)": "https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf", "source planned": "https://www.au-pida.org/view-project/2005/", "existing": 0.28, "planned": 0.0, "start_lat": 7.62505631, "start_lon": -5.55467423, "end_lat": 5.55, "end_lon": -0.2, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -5.55467423, 7.62505631 ], [ -0.2, 5.55 ] ] } },
{ "type": "Feature", "properties": { "from": "COD-XX", "to": "COG-XX", "existing capacity + (mw)": 60.0, "existing capacity - (mw)": -60.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No information found on new capacity coming online post 2015 study. No new lines visible following 2019 IEA study. ", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S0973082615300065", "source planned": "https://www.iea.org/articles/democratic-republic-of-the-congo-energy-outlook", "existing": 0.06, "planned": 0.0, "start_lat": -2.881186814, "start_lon": 23.66027837, "end_lat": -0.833601272, "end_lon": 15.24535868, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.66027837, -2.881186814 ], [ 15.24535868, -0.833601272 ] ] } },
{ "type": "Feature", "properties": { "from": "COD-XX", "to": "ZMB-XX", "existing capacity + (mw)": 827.0, "existing capacity - (mw)": -827.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Planned capacity cannot be sourced publicly, so assumed zero", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S0973082621000442?casa_token=kprlKh7Cjp8AAAAA:xOZHGolZ0dqApDILLrrDPDKCIypnTPGOUK81f9gnQ1Pu0RqQF9AM7L-iK73wGe8p5KWnRQzBlQ#f0010", "source planned": "https://www.afdb.org/en/documents/drc-kolwezi-zambia-solwezi-330-kv-power-line-interconnection-project-project-information-memorendum#:~:text=The%20proposed%20interconnector%20will%20result,the%20Northwestern%20Province%20of%20Zambia.", "existing": 0.827, "planned": 0.0, "start_lat": -2.881186814, "start_lon": 23.66027837, "end_lat": -13.4567959, "end_lon": 27.79137026, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 23.66027837, -2.881186814 ], [ 27.79137026, -13.4567959 ] ] } },
{ "type": "Feature", "properties": { "from": "DJI-XX", "to": "ETH-XX", "existing capacity + (mw)": 180.0, "existing capacity - (mw)": -180.0, "planned capacity + (mw)": 160.0, "planned capacity - (mw)": -160.0, "year planned": 2026.0, "assumptions/applied methods": "Double circuit line with each circuit having a rated capacity of 160 MW. ", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0015", "source planned": "https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-179", "existing": 0.18, "planned": 0.16, "start_lat": 11.72702742, "start_lon": 42.56409661, "end_lat": 8.629030994000001, "end_lon": 39.62473654, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 42.56409661, 11.72702742 ], [ 39.62473654, 8.629030994 ] ] } },
{ "type": "Feature", "properties": { "from": "DZA-XX", "to": "TUN-XX", "existing capacity + (mw)": 280.0, "existing capacity - (mw)": -280.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f", "source planned": "https://mc-cd8320d4-36a1-40ac-83cc-3389-cdn-endpoint.azureedge.net/-/media/Files/IRENA/Agency/Publication/2023/Jan/IRENA_Planning_Prospects_NAfrica_2023.pdf?rev=3c742bf754a540d8929a5856aaa4575f", "existing": 0.28, "planned": 0.0, "start_lat": 28.15777049, "start_lon": 2.676939699, "end_lat": 34.11186824, "end_lon": 9.573402185000001, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 2.676939699, 28.15777049 ], [ 9.573402185, 34.11186824 ] ] } },
{ "type": "Feature", "properties": { "from": "EGY-XX", "to": "SDN-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005", "source planned": "https://www.au-pida.org/view-project/309/", "existing": 0.3, "planned": 1.0, "start_lat": 26.56948837, "start_lon": 29.7825875, "end_lat": 16.04849354, "end_lon": 30.00544151, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 29.7825875, 26.56948837 ], [ 30.00544151, 16.04849354 ] ] } },
{ "type": "Feature", "properties": { "from": "ESH-XX", "to": "MAR-XX", "existing capacity + (mw)": 800.0, "existing capacity - (mw)": -800.0, "planned capacity + (mw)": null, "planned capacity - (mw)": null, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S0962629823000495#bib85", "source planned": "https://www.sciencedirect.com/science/article/pii/S0962629823000495#bib85", "existing": 0.8, "planned": null, "start_lat": 24.67737336, "start_lon": -13.1354731, "end_lat": 31.84740337, "end_lon": -6.276188993, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -13.1354731, 24.67737336 ], [ -6.276188993, 31.84740337 ] ] } },
{ "type": "Feature", "properties": { "from": "KEN-XX", "to": "UGA-XX", "existing capacity + (mw)": 145.0, "existing capacity - (mw)": -145.0, "planned capacity + (mw)": 155.0, "planned capacity - (mw)": -155.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005", "source planned": "https://www.sciencedirect.com/science/article/pii/S097308262030243X#f0005", "existing": 0.145, "planned": 0.155, "start_lat": 0.554886619, "start_lon": 37.84485847, "end_lat": 1.516233214, "end_lon": 32.33288847, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 37.84485847, 0.554886619 ], [ 32.33288847, 1.516233214 ] ] } },
{ "type": "Feature", "properties": { "from": "MLI-XX", "to": "SEN-XX", "existing capacity + (mw)": 250.0, "existing capacity - (mw)": -250.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf", "source planned": "https://www.ecowapp.org/sites/default/files/wapp_2020-2023_business_plan_0.pdf", "existing": 0.25, "planned": 0.0, "start_lat": 17.35549917, "start_lon": -3.522342254, "end_lat": 14.35888496, "end_lon": -14.47148562, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -3.522342254, 17.35549917 ], [ -14.47148562, 14.35888496 ] ] } },
{ "type": "Feature", "properties": { "from": "MOZ-XX", "to": "SWZ-XX", "existing capacity + (mw)": 1450.0, "existing capacity - (mw)": -1450.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Existing Capacity is in reference to the MOTRACO transmission line. No planned interconnector on SAPP interconnector website.", "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 1.45, "planned": 0.0, "start_lat": -25.9667, "start_lon": 32.5833, "end_lat": -26.5649273, "end_lon": 31.49907242, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 32.5833, -25.9667 ], [ 31.49907242, -26.5649273 ] ] } },
{ "type": "Feature", "properties": { "from": "MOZ-XX", "to": "ZAF-XX", "existing capacity + (mw)": 3850.0, "existing capacity - (mw)": -3850.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No planned interconnector on SAPP interconnector website. Existing capacity summed across 4 transmission lines (2000, 250, 150, 1450)", "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 3.85, "planned": 0.0, "start_lat": -25.9667, "start_lon": 32.5833, "end_lat": -28.99669244, "end_lon": 25.08613403, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 32.5833, -25.9667 ], [ 25.08613403, -28.99669244 ] ] } },
{ "type": "Feature", "properties": { "from": "MOZ-XX", "to": "ZWE-XX", "existing capacity + (mw)": 500.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No planned interconnector on SAPP interconnector website.", "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 0.5, "planned": 0.0, "start_lat": -25.9667, "start_lon": 32.5833, "end_lat": -19.00057628, "end_lon": 29.87071217, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 32.5833, -25.9667 ], [ 29.87071217, -19.00057628 ] ] } },
{ "type": "Feature", "properties": { "from": "NAM-XX", "to": "ZAF-XX", "existing capacity + (mw)": 350.0, "existing capacity - (mw)": -350.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No planned interconnector on SAPP interconnector website.", "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 0.35, "planned": 0.0, "start_lat": -22.13772321, "start_lon": 17.22229329, "end_lat": -28.99669244, "end_lon": 25.08613403, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 17.22229329, -22.13772321 ], [ 25.08613403, -28.99669244 ] ] } },
{ "type": "Feature", "properties": { "from": "NAM-XX", "to": "ZMB-XX", "existing capacity + (mw)": 300.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No planned interconnector on SAPP interconnector website.", "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 0.3, "planned": 0.0, "start_lat": -22.13772321, "start_lon": 17.22229329, "end_lat": -13.4567959, "end_lon": 27.79137026, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 17.22229329, -22.13772321 ], [ 27.79137026, -13.4567959 ] ] } },
{ "type": "Feature", "properties": { "from": "NER-XX", "to": "NGA-XX", "existing capacity + (mw)": 80.0, "existing capacity - (mw)": -80.0, "planned capacity + (mw)": 450.0, "planned capacity - (mw)": -450.0, "year planned": 2024.0, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.usaid.gov/sites/default/files/2022-05/wapt.pdf", "source planned": "https://projectsportal.afdb.org/dataportal/VProject/show/P-Z1-FA0-146", "existing": 0.08, "planned": 0.45, "start_lat": 17.42344887, "start_lon": 9.401354631, "end_lat": 9.617324131, "end_lon": 8.108524438, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 9.401354631, 17.42344887 ], [ 8.108524438, 9.617324131 ] ] } },
{ "type": "Feature", "properties": { "from": "SWZ-XX", "to": "ZAF-XX", "existing capacity + (mw)": 1176.0, "existing capacity - (mw)": -1176.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "No planned interconnector on SAPP interconnector website.", "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S254243512200304X?via%3Dihub#da0010", "source planned": "https://www.sapp.co.zw/interconnectors", "existing": 1.176, "planned": 0.0, "start_lat": -26.5649273, "start_lon": 31.49907242, "end_lat": -28.99669244, "end_lon": 25.08613403, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 31.49907242, -26.5649273 ], [ 25.08613403, -28.99669244 ] ] } },
{ "type": "Feature", "properties": { "from": "ZAF-XX", "to": "ZWE-XX", "existing capacity + (mw)": 15.0, "existing capacity - (mw)": -15.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.sciencedirect.com/science/article/pii/S254243512200304X?via%3Dihub#da0010", "source planned": "http://www.geni.org/globalenergy/library/technical-articles/transmission/allafrica.com/225million-zizabona-power-interconnector-to-be-officially-unveiled/index.shtml#:~:text=The%20project%27s%20first%20phase%20wheeling,landmark%20regional%20transmission%20energy%20project.", "existing": 0.015, "planned": 0.3, "start_lat": -28.99669244, "start_lon": 25.08613403, "end_lat": -19.00057628, "end_lon": 29.87071217, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 25.08613403, -28.99669244 ], [ 29.87071217, -19.00057628 ] ] } },
{ "type": "Feature", "properties": { "from": "ZMB-XX", "to": "ZWE-XX", "existing capacity + (mw)": 1400.0, "existing capacity - (mw)": -1400.0, "planned capacity + (mw)": 300.0, "planned capacity - (mw)": -300.0, "year planned": null, "assumptions/applied methods": null, "other notes": null, "source existing (2023)": "https://www.sapp.co.zw/interconnectors", "source planned": "http://www.geni.org/globalenergy/library/technical-articles/transmission/allafrica.com/225million-zizabona-power-interconnector-to-be-officially-unveiled/index.shtml#:~:text=The%20project%27s%20first%20phase%20wheeling,landmark%20regional%20transmission%20energy%20project.", "existing": 1.4, "planned": 0.3, "start_lat": -13.4567959, "start_lon": 27.79137026, "end_lat": -19.00057628, "end_lon": 29.87071217, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ 27.79137026, -13.4567959 ], [ 29.87071217, -19.00057628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AA", "to": "USA-BP", "existing capacity + (mw)": 298.0, "existing capacity - (mw)": -1116.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.707, "planned": 0.0, "start_lat": 47.6671, "start_lon": -117.433, "end_lat": 45.6366, "end_lon": -122.5967, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -117.433, 47.6671 ], [ -122.5967, 45.6366 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AA", "to": "USA-CH", "existing capacity + (mw)": 19.0, "existing capacity - (mw)": -22.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.0205, "planned": 0.0, "start_lat": 47.6671, "start_lon": -117.433, "end_lat": 47.436, "end_lon": -120.3295, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -117.433, 47.6671 ], [ -120.3295, 47.436 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AA", "to": "USA-GC", "existing capacity + (mw)": 177.0, "existing capacity - (mw)": -114.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.1455, "planned": 0.0, "start_lat": 47.6671, "start_lon": -117.433, "end_lat": 47.1279, "end_lon": -119.2759, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -117.433, 47.6671 ], [ -119.2759, 47.1279 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AA", "to": "USA-IP", "existing capacity + (mw)": 265.0, "existing capacity - (mw)": -153.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.209, "planned": 0.0, "start_lat": 47.6671, "start_lon": -117.433, "end_lat": 43.6005, "end_lon": -116.2308, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -117.433, 47.6671 ], [ -116.2308, 43.6005 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AA", "to": "USA-NW", "existing capacity + (mw)": 90.0, "existing capacity - (mw)": -142.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.116, "planned": 0.0, "start_lat": 47.6671, "start_lon": -117.433, "end_lat": 46.8751, "end_lon": -114.0214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -117.433, 47.6671 ], [ -114.0214, 46.8751 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AA", "to": "USA-PW", "existing capacity + (mw)": 218.0, "existing capacity - (mw)": -246.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.232, "planned": 0.0, "start_lat": 47.6671, "start_lon": -117.433, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -117.433, 47.6671 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AI", "to": "USA-MI", "existing capacity + (mw)": 796.0, "existing capacity - (mw)": -721.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.7585, "planned": 0.0, "start_lat": 36.1283, "start_lon": -95.9042, "end_lat": 42.3834, "end_lon": -83.1024, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -95.9042, 36.1283 ], [ -83.1024, 42.3834 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AI", "to": "USA-SP", "existing capacity + (mw)": 183.0, "existing capacity - (mw)": -602.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.3925, "planned": 0.0, "start_lat": 36.1283, "start_lon": -95.9042, "end_lat": 36.0555, "end_lon": -90.5149, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -95.9042, 36.1283 ], [ -90.5149, 36.0555 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AI", "to": "USA-SW", "existing capacity + (mw)": 562.0, "existing capacity - (mw)": -853.0, "planned capacity + (mw)": 2500.0, "planned capacity - (mw)": -2500.0, "year planned": 2028.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned transmission line was provided in miles and has been converted to kilometers.", "other notes": "Grain Belt Express Phase 1 line connects the SPP to both MISO and AECI, and the Tiger Connector addition increases the total transmission to 2500 MW for Phase 1.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://grainbeltexpress.com/wp-content/uploads/2023/03/Grain-Belt-Express-Order-from-ICC-E-12_22-0499_Order-.pdf", "existing": 0.7075, "planned": 2.5, "start_lat": 36.1283, "start_lon": -95.9042, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -95.9042, 36.1283 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AI", "to": "USA-TV", "existing capacity + (mw)": 269.0, "existing capacity - (mw)": -11.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.14, "planned": 0.0, "start_lat": 36.1283, "start_lon": -95.9042, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -95.9042, 36.1283 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AN", "to": "USA-BP", "existing capacity + (mw)": 1260.0, "existing capacity - (mw)": -10.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.635, "planned": 0.0, "start_lat": 45.5415, "start_lon": -120.423, "end_lat": 45.6366, "end_lon": -122.5967, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -120.423, 45.5415 ], [ -122.5967, 45.6366 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AN", "to": "USA-PW", "existing capacity + (mw)": 574.0, "existing capacity - (mw)": -2.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.288, "planned": 0.0, "start_lat": 45.5415, "start_lon": -120.423, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -120.423, 45.5415 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-CI", "existing capacity + (mw)": 1458.0, "existing capacity - (mw)": -325.0, "planned capacity + (mw)": 3200.0, "planned capacity - (mw)": -3200.0, "year planned": 2024.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Planned capacity relates to the Ten West Link project which is expected to be operationalized in 2024. The line runs between Arizona Public Service Company (USAAZ) and the territory of CAISO (USACI).", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.nsenergybusiness.com/projects/ten-west-link-transmission-line/", "existing": 0.8915, "planned": 3.2, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 37.7558, "end_lon": -122.4449, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -122.4449, 37.7558 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-II", "existing capacity + (mw)": 47.0, "existing capacity - (mw)": -73.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.06, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 33.7346, "end_lon": -116.2346, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -116.2346, 33.7346 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-LD", "existing capacity + (mw)": 822.0, "existing capacity - (mw)": -98.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.46, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 34.1141, "end_lon": -118.4068, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -118.4068, 34.1141 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-PE", "existing capacity + (mw)": 394.0, "existing capacity - (mw)": -581.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.4875, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 40.7776, "end_lon": -111.9311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -111.9311, 40.7776 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-PN", "existing capacity + (mw)": 530.0, "existing capacity - (mw)": -601.0, "planned capacity + (mw)": 3000.0, "planned capacity - (mw)": -3000.0, "year planned": 2026.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km. The Sunzia project is expected to become operational in 2025/2026. We've assumed the latter year.", "other notes": "This is related to the Sunzia transmission line.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.5655, "planned": 3.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 35.1054, "end_lon": -106.6465, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -106.6465, 35.1054 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-PN", "existing capacity + (mw)": 530.0, "existing capacity - (mw)": -601.0, "planned capacity + (mw)": 1500.0, "planned capacity - (mw)": -1500.0, "year planned": 2028.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km.", "other notes": "This is related to the RioSol transmission line. The project is planned to enter in operation in 2028.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.5655, "planned": 1.5, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 35.1054, "end_lon": -106.6465, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -106.6465, 35.1054 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-SR", "existing capacity + (mw)": 1348.0, "existing capacity - (mw)": -4297.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 2.8225, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 33.5722, "end_lon": -112.0892, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -112.0892, 33.5722 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-TP", "existing capacity + (mw)": 467.0, "existing capacity - (mw)": -195.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.331, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 32.1541, "end_lon": -110.8787, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -110.8787, 32.1541 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-WC", "existing capacity + (mw)": 1365.0, "existing capacity - (mw)": -267.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.816, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-AZ", "to": "USA-WM", "existing capacity + (mw)": 186.0, "existing capacity - (mw)": -367.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.2765, "planned": 0.0, "start_lat": 32.5995, "start_lon": -114.5491, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.5491, 32.5995 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BA", "to": "USA-BP", "existing capacity + (mw)": 873.0, "existing capacity - (mw)": -1562.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.2175, "planned": 0.0, "start_lat": 38.5677, "start_lon": -121.4685, "end_lat": 45.6366, "end_lon": -122.5967, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -121.4685, 38.5677 ], [ -122.5967, 45.6366 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BA", "to": "USA-CI", "existing capacity + (mw)": 1101.0, "existing capacity - (mw)": -1025.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.063, "planned": 0.0, "start_lat": 38.5677, "start_lon": -121.4685, "end_lat": 37.7558, "end_lon": -122.4449, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -121.4685, 38.5677 ], [ -122.4449, 37.7558 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BA", "to": "USA-TI", "existing capacity + (mw)": 274.0, "existing capacity - (mw)": -460.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.367, "planned": 0.0, "start_lat": 38.5677, "start_lon": -121.4685, "end_lat": 37.6375, "end_lon": -121.0028, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -121.4685, 38.5677 ], [ -121.0028, 37.6375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-CH", "existing capacity + (mw)": 135.0, "existing capacity - (mw)": -956.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.5455, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 47.436, "end_lon": -120.3295, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -120.3295, 47.436 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-CI", "existing capacity + (mw)": 2546.0, "existing capacity - (mw)": -1335.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.9405, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 37.7558, "end_lon": -122.4449, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -122.4449, 37.7558 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-DO", "existing capacity + (mw)": 210.0, "existing capacity - (mw)": -586.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.398, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 48.2411, "end_lon": -119.6111, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -119.6111, 48.2411 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-GC", "existing capacity + (mw)": 317.0, "existing capacity - (mw)": -911.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.614, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 47.1279, "end_lon": -119.2759, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -119.2759, 47.1279 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-GD", "existing capacity + (mw)": 19.0, "existing capacity - (mw)": -1450.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.7345, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 45.8326, "end_lon": -119.2854, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -119.2854, 45.8326 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-IP", "existing capacity + (mw)": 130.0, "existing capacity - (mw)": -134.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.132, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 43.6005, "end_lon": -116.2308, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -116.2308, 43.6005 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-LD", "existing capacity + (mw)": 3026.0, "existing capacity - (mw)": -624.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.825, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 34.1141, "end_lon": -118.4068, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -118.4068, 34.1141 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-NE", "existing capacity + (mw)": 160.0, "existing capacity - (mw)": -128.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.144, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 36.2333, "end_lon": -115.2654, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -115.2654, 36.2333 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-NW", "existing capacity + (mw)": 574.0, "existing capacity - (mw)": -1372.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.973, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 46.8751, "end_lon": -114.0214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -114.0214, 46.8751 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-PG", "existing capacity + (mw)": 2395.0, "existing capacity - (mw)": 0.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.1975, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 45.5371, "end_lon": -122.65, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -122.65, 45.5371 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-PI", "existing capacity + (mw)": 2922.0, "existing capacity - (mw)": 0.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.461, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 47.5436, "end_lon": -122.7121, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -122.7121, 47.5436 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-PW", "existing capacity + (mw)": 2008.0, "existing capacity - (mw)": -309.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.1585, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-SL", "existing capacity + (mw)": 1103.0, "existing capacity - (mw)": -367.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.735, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 47.6211, "end_lon": -122.3244, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -122.3244, 47.6211 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-BP", "to": "USA-TR", "existing capacity + (mw)": 547.0, "existing capacity - (mw)": -176.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.3615, "planned": 0.0, "start_lat": 45.6366, "start_lon": -122.5967, "end_lat": 47.2431, "end_lon": -122.4531, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.5967, 45.6366 ], [ -122.4531, 47.2431 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CE", "to": "USA-DU", "existing capacity + (mw)": 1349.0, "existing capacity - (mw)": -1410.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.3795, "planned": 0.0, "start_lat": 36.0714, "start_lon": -94.1661, "end_lat": 35.2083, "end_lon": -80.8303, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.1661, 36.0714 ], [ -80.8303, 35.2083 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CE", "to": "USA-PJ", "existing capacity + (mw)": 1219.0, "existing capacity - (mw)": -1183.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No indicated planned interconnections from CPLE (Duke Energy Progress) to PJM.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf ", "existing": 1.201, "planned": 0.0, "start_lat": 36.0714, "start_lon": -94.1661, "end_lat": 41.8375, "end_lon": -87.6866, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.1661, 36.0714 ], [ -87.6866, 41.8375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CE", "to": "USA-SC", "existing capacity + (mw)": 608.0, "existing capacity - (mw)": -369.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.4885, "planned": 0.0, "start_lat": 36.0714, "start_lon": -94.1661, "end_lat": 33.7094, "end_lon": -78.8844, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.1661, 36.0714 ], [ -78.8844, 33.7094 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CE", "to": "USA-SG", "existing capacity + (mw)": 83.0, "existing capacity - (mw)": -218.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.1505, "planned": 0.0, "start_lat": 36.0714, "start_lon": -94.1661, "end_lat": 32.8168, "end_lon": -79.9687, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.1661, 36.0714 ], [ -79.9687, 32.8168 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CE", "to": "USA-YA", "existing capacity + (mw)": 41.0, "existing capacity - (mw)": -69.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.055, "planned": 0.0, "start_lat": 36.0714, "start_lon": -94.1661, "end_lat": 35.5191, "end_lon": -80.0986, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.1661, 36.0714 ], [ -80.0986, 35.5191 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CH", "to": "USA-DO", "existing capacity + (mw)": 291.0, "existing capacity - (mw)": -197.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.244, "planned": 0.0, "start_lat": 47.436, "start_lon": -120.3295, "end_lat": 48.2411, "end_lon": -119.6111, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -120.3295, 47.436 ], [ -119.6111, 48.2411 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CH", "to": "USA-PI", "existing capacity + (mw)": 234.0, "existing capacity - (mw)": -175.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.2045, "planned": 0.0, "start_lat": 47.436, "start_lon": -120.3295, "end_lat": 47.5436, "end_lon": -122.7121, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -120.3295, 47.436 ], [ -122.7121, 47.5436 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-II", "existing capacity + (mw)": 266.0, "existing capacity - (mw)": -562.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.414, "planned": 0.0, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 33.7346, "end_lon": -116.2346, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -116.2346, 33.7346 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-LD", "existing capacity + (mw)": 1246.0, "existing capacity - (mw)": -3178.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 2.212, "planned": 0.0, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 34.1141, "end_lon": -118.4068, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -118.4068, 34.1141 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-NE", "existing capacity + (mw)": 296.0, "existing capacity - (mw)": -1401.0, "planned capacity + (mw)": 1500.0, "planned capacity - (mw)": -1500.0, "year planned": 2027.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km.", "other notes": "This corresponds to the Nevada Power Company to the Southern California Edison (CAISO) Section of the TransWest Express transmission project.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.transwestexpress.net/about/docs/TransWest-Express-Route-Overview-033121.pdf", "existing": 0.8485, "planned": 1.5, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 36.2333, "end_lon": -115.2654, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -115.2654, 36.2333 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-PW", "existing capacity + (mw)": 20.0, "existing capacity - (mw)": -32.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.026, "planned": 0.0, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-SR", "existing capacity + (mw)": 956.0, "existing capacity - (mw)": -2078.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.517, "planned": 0.0, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 33.5722, "end_lon": -112.0892, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -112.0892, 33.5722 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-TI", "existing capacity + (mw)": 550.0, "existing capacity - (mw)": -204.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.377, "planned": 0.0, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 37.6375, "end_lon": -121.0028, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -121.0028, 37.6375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CI", "to": "USA-WC", "existing capacity + (mw)": 386.0, "existing capacity - (mw)": -430.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.408, "planned": 0.0, "start_lat": 37.7558, "start_lon": -122.4449, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.4449, 37.7558 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CW", "to": "USA-DU", "existing capacity + (mw)": 219.0, "existing capacity - (mw)": -356.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Duke Energy Progress West (CPLW) to Duke Energy Carolinas (DUK). There is overlap between service being provided by Duke Energy Progress West (CPLW) and Duke Energy Carolinas (DUK) in some western North Carolina counties. Craggy Enka is a project that is upgrading existing transmission infrastructure that might connect both Balancing Authorities, but there is no information confirming that it is transferring electricity between these balancing authorities.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.2875, "planned": 0.0, "start_lat": 35.5707, "start_lon": -82.5537, "end_lat": 35.2083, "end_lon": -80.8303, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.5537, 35.5707 ], [ -80.8303, 35.2083 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CW", "to": "USA-PJ", "existing capacity + (mw)": 159.0, "existing capacity - (mw)": -165.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.162, "planned": 0.0, "start_lat": 35.5707, "start_lon": -82.5537, "end_lat": 41.8375, "end_lon": -87.6866, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.5537, 35.5707 ], [ -87.6866, 41.8375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-CW", "to": "USA-TV", "existing capacity + (mw)": 54.0, "existing capacity - (mw)": -58.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Neither the TVA source or Duke Energy website indicate that new transmission projects will connect between these balancing authorities.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.tva.com/energy/transmission/transmission-projects/appalachia-area-improvement-tennessee-and-north-carolina", "existing": 0.056, "planned": 0.0, "start_lat": 35.5707, "start_lon": -82.5537, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.5537, 35.5707 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DE", "to": "USA-SR", "existing capacity + (mw)": 576.0, "existing capacity - (mw)": -3.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.2895, "planned": 0.0, "start_lat": 33.3417, "start_lon": -112.8897, "end_lat": 33.5722, "end_lon": -112.0892, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -112.8897, 33.3417 ], [ -112.0892, 33.5722 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-PJ", "existing capacity + (mw)": 1236.0, "existing capacity - (mw)": -1236.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.236, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 41.8375, "end_lon": -87.6866, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -87.6866, 41.8375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-SA", "existing capacity + (mw)": 176.0, "existing capacity - (mw)": -232.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.204, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 30.9052, "end_lon": -84.5732, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -84.5732, 30.9052 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-SC", "existing capacity + (mw)": 167.0, "existing capacity - (mw)": -733.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Santee Cooper document indicates that Duke Energy regions might be affected by new interconnections, but these projects are not marked as specific interconnections between the different balancing authorities.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "http://www.oasis.oati.com/woa/docs/SC/SCdocs/SanteeCooper_2023_DISIS_Phase_1_Report_Final.pdf", "existing": 0.45, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 33.7094, "end_lon": -78.8844, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -78.8844, 33.7094 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-SG", "existing capacity + (mw)": 216.0, "existing capacity - (mw)": -267.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.2415, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 32.8168, "end_lon": -79.9687, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -79.9687, 32.8168 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-SO", "existing capacity + (mw)": 1106.0, "existing capacity - (mw)": -340.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://georgiarecorder.com/2023/08/28/federal-state-regulators-prod-utilities-to-consider-technology-for-grid-upgrade/", "existing": 0.723, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-TV", "existing capacity + (mw)": 139.0, "existing capacity - (mw)": -256.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.tva.com/energy/transmission/transmission-projects/appalachia-area-improvement-tennessee-and-north-carolina", "existing": 0.1975, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-DU", "to": "USA-YA", "existing capacity + (mw)": 41.0, "existing capacity - (mw)": -177.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.109, "planned": 0.0, "start_lat": 35.2083, "start_lon": -80.8303, "end_lat": 35.5191, "end_lon": -80.0986, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.8303, 35.2083 ], [ -80.0986, 35.5191 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-EP", "to": "USA-PN", "existing capacity + (mw)": 137.0, "existing capacity - (mw)": -558.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.3475, "planned": 0.0, "start_lat": 31.8476, "start_lon": -106.43, "end_lat": 35.1054, "end_lon": -106.6465, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.43, 31.8476 ], [ -106.6465, 35.1054 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-EP", "to": "USA-SW", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -129.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.0645, "planned": 0.0, "start_lat": 31.8476, "start_lon": -106.43, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.43, 31.8476 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-EP", "to": "USA-TP", "existing capacity + (mw)": 335.0, "existing capacity - (mw)": -413.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.374, "planned": 0.0, "start_lat": 31.8476, "start_lon": -106.43, "end_lat": 32.1541, "end_lon": -110.8787, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.43, 31.8476 ], [ -110.8787, 32.1541 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-ER", "to": "USA-SW", "existing capacity + (mw)": 462.0, "existing capacity - (mw)": -813.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Article indicates that there are no concrete plans for planned interconnections from ERCOT to SWPP.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.wfaa.com/article/news/local/plans-connect-ercot-power-grid-other-states-draw-new-attention/287-6d3f07fa-b991-46a6-a291-ca2ea528dda7", "existing": 0.6375, "planned": 0.0, "start_lat": 32.7935, "start_lon": -96.7667, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -96.7667, 32.7935 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-FL", "existing capacity + (mw)": 212.0, "existing capacity - (mw)": -1222.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://guidetogreatergainesville.com/wp-content/uploads/2016/01/Florida-Electric-Territories-Maps.pdf", "existing": 0.717, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 25.784, "end_lon": -80.2101, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -80.2101, 25.784 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-FM", "existing capacity + (mw)": 141.0, "existing capacity - (mw)": -853.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.497, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 28.4773, "end_lon": -81.337, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -81.337, 28.4773 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-GV", "existing capacity + (mw)": 49.0, "existing capacity - (mw)": -62.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.0555, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 29.6804, "end_lon": -82.3459, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -82.3459, 29.6804 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-SM", "existing capacity + (mw)": 231.0, "existing capacity - (mw)": -680.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.4555, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 28.4798, "end_lon": -82.53, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -82.53, 28.4798 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-SO", "existing capacity + (mw)": 101.0, "existing capacity - (mw)": -300.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.2005, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-TA", "existing capacity + (mw)": 48.0, "existing capacity - (mw)": -170.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy. Tallahassee document indicates that only transmission lines within the city are planned.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.109, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 30.4551, "end_lon": -84.2527, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -84.2527, 30.4551 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FC", "to": "USA-TC", "existing capacity + (mw)": 758.0, "existing capacity - (mw)": -330.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.duke-energy.com/our-company/about-us/electric-transmission-projects", "existing": 0.544, "planned": 0.0, "start_lat": 27.7931, "start_lon": -82.6652, "end_lat": 27.9945, "end_lon": -82.4447, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.6652, 27.7931 ], [ -82.4447, 27.9945 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-FM", "existing capacity + (mw)": 518.0, "existing capacity - (mw)": -170.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/investor-materials/supplemental-resources/florida-power-and-light/FPL_TYSP_2023.pdf", "existing": 0.344, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 28.4773, "end_lon": -81.337, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -81.337, 28.4773 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-GV", "existing capacity + (mw)": 73.0, "existing capacity - (mw)": -26.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/investor-materials/supplemental-resources/florida-power-and-light/FPL_TYSP_2023.pdf", "existing": 0.0495, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 29.6804, "end_lon": -82.3459, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -82.3459, 29.6804 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-HS", "existing capacity + (mw)": 102.0, "existing capacity - (mw)": -88.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.095, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 25.8696, "end_lon": -80.3045, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -80.3045, 25.8696 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-JE", "existing capacity + (mw)": 766.0, "existing capacity - (mw)": -121.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.4435, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 30.3322, "end_lon": -81.6749, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -81.6749, 30.3322 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-SM", "existing capacity + (mw)": 518.0, "existing capacity - (mw)": -1178.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf", "existing": 0.848, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 28.4798, "end_lon": -82.53, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -82.53, 28.4798 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-SO", "existing capacity + (mw)": 812.0, "existing capacity - (mw)": -1294.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.053, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FL", "to": "USA-TC", "existing capacity + (mw)": 283.0, "existing capacity - (mw)": -547.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.investor.nexteraenergy.com/~/media/Files/N/NEE-IR/investor-materials/supplemental-resources/florida-power-and-light/FPL_TYSP_2023.pdf", "existing": 0.415, "planned": 0.0, "start_lat": 25.784, "start_lon": -80.2101, "end_lat": 27.9945, "end_lon": -82.4447, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -80.2101, 25.784 ], [ -82.4447, 27.9945 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FM", "to": "USA-JE", "existing capacity + (mw)": 23.0, "existing capacity - (mw)": -75.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.049, "planned": 0.0, "start_lat": 28.4773, "start_lon": -81.337, "end_lat": 30.3322, "end_lon": -81.6749, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -81.337, 28.4773 ], [ -81.6749, 30.3322 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-FM", "to": "USA-TC", "existing capacity + (mw)": 129.0, "existing capacity - (mw)": -459.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2023/Orlando%20Utilities%20Commission.pdf", "existing": 0.294, "planned": 0.0, "start_lat": 28.4773, "start_lon": -81.337, "end_lat": 27.9945, "end_lon": -82.4447, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -81.337, 28.4773 ], [ -82.4447, 27.9945 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-GC", "to": "USA-PI", "existing capacity + (mw)": 16.0, "existing capacity - (mw)": -317.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.1665, "planned": 0.0, "start_lat": 47.1279, "start_lon": -119.2759, "end_lat": 47.5436, "end_lon": -122.7121, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -119.2759, 47.1279 ], [ -122.7121, 47.5436 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-GC", "to": "USA-PW", "existing capacity + (mw)": 219.0, "existing capacity - (mw)": -62.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.1405, "planned": 0.0, "start_lat": 47.1279, "start_lon": -119.2759, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -119.2759, 47.1279 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-GD", "to": "USA-PN", "existing capacity + (mw)": 495.0, "existing capacity - (mw)": -5.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.25, "planned": 0.0, "start_lat": 45.8326, "start_lon": -119.2854, "end_lat": 35.1054, "end_lon": -106.6465, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -119.2854, 45.8326 ], [ -106.6465, 35.1054 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-GD", "to": "USA-SR", "existing capacity + (mw)": 683.0, "existing capacity - (mw)": -3.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.343, "planned": 0.0, "start_lat": 45.8326, "start_lon": -119.2854, "end_lat": 33.5722, "end_lon": -112.0892, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -119.2854, 45.8326 ], [ -112.0892, 33.5722 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-GF", "to": "USA-WC", "existing capacity + (mw)": 567.0, "existing capacity - (mw)": -3.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.285, "planned": 0.0, "start_lat": 35.0533, "start_lon": -114.1334, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.1334, 35.0533 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-GW", "to": "USA-NW", "existing capacity + (mw)": 190.0, "existing capacity - (mw)": -4.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.097, "planned": 0.0, "start_lat": 48.5078, "start_lon": -112.0908, "end_lat": 46.8751, "end_lon": -114.0214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -112.0908, 48.5078 ], [ -114.0214, 46.8751 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-HG", "to": "USA-SR", "existing capacity + (mw)": 972.0, "existing capacity - (mw)": -5.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.4885, "planned": 0.0, "start_lat": 33.476, "start_lon": -113.1134, "end_lat": 33.5722, "end_lon": -112.0892, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -113.1134, 33.476 ], [ -112.0892, 33.5722 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-II", "to": "USA-WC", "existing capacity + (mw)": 75.0, "existing capacity - (mw)": -69.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.072, "planned": 0.0, "start_lat": 33.7346, "start_lon": -116.2346, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -116.2346, 33.7346 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-IP", "to": "USA-NE", "existing capacity + (mw)": 254.0, "existing capacity - (mw)": -185.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.2195, "planned": 0.0, "start_lat": 43.6005, "start_lon": -116.2308, "end_lat": 36.2333, "end_lon": -115.2654, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -116.2308, 43.6005 ], [ -115.2654, 36.2333 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-IP", "to": "USA-NW", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -18.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2027.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km.", "other notes": "Planned capacity relates to the SWIP North transmission project. The project is near construction ready and planned to enter in operation late 2027.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.caiso.com/Documents/DecisiononSouthwestIntertieProjectNorth-Presentation-Dec2023.pdf", "existing": 0.009, "planned": 1.0, "start_lat": 43.6005, "start_lon": -116.2308, "end_lat": 46.8751, "end_lon": -114.0214, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -116.2308, 43.6005 ], [ -114.0214, 46.8751 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-IP", "to": "USA-PE", "existing capacity + (mw)": 637.0, "existing capacity - (mw)": -1682.0, "planned capacity + (mw)": 765.0, "planned capacity - (mw)": -765.0, "year planned": 2028.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km. We assume that the reported 765 MW of renewable integration that the Gateway West transmission project facilitates equals the net transfer capacity of the project along all sections of the line. Section D3 of the project (see Pacificorp website) is assumed to be the last section of the line that is required to be completed to facilitate exchange between both balancing authorities hence the planned completion year for this project is assumed to be 2028.", "other notes": "Planned capacity relates to the Gateway West transmission project. It consists of multiple sections of 500 kv and 230 kv transmission lines.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.pacificorp.com/transmission/transmission-projects/energy-gateway/gateway-west.html", "existing": 1.1595, "planned": 0.765, "start_lat": 43.6005, "start_lon": -116.2308, "end_lat": 40.7776, "end_lon": -111.9311, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -116.2308, 43.6005 ], [ -111.9311, 40.7776 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-IP", "to": "USA-PW", "existing capacity + (mw)": 973.0, "existing capacity - (mw)": -774.0, "planned capacity + (mw)": 1000.0, "planned capacity - (mw)": -1000.0, "year planned": 2026.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Planned capacity relates to Boardman to Hemingway transmission project. Project is expected to enter service in 2026.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.idahopower.com/energy-environment/energy/planning-and-electrical-projects/current-projects/boardman-to-hemingway/purpose-and-need/", "existing": 0.8735, "planned": 1.0, "start_lat": 43.6005, "start_lon": -116.2308, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -116.2308, 43.6005 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-IS", "to": "USA-NY", "existing capacity + (mw)": 896.0, "existing capacity - (mw)": -1518.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.207, "planned": 0.0, "start_lat": 42.3188, "start_lon": -71.0852, "end_lat": 40.6943, "end_lon": -73.9249, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -71.0852, 42.3188 ], [ -73.9249, 40.6943 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-JE", "to": "USA-SM", "existing capacity + (mw)": 105.0, "existing capacity - (mw)": -67.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf", "existing": 0.086, "planned": 0.0, "start_lat": 30.3322, "start_lon": -81.6749, "end_lat": 28.4798, "end_lon": -82.53, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -81.6749, 30.3322 ], [ -82.53, 28.4798 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-LD", "to": "USA-NE", "existing capacity + (mw)": 1383.0, "existing capacity - (mw)": -406.0, "planned capacity + (mw)": 1500.0, "planned capacity - (mw)": -1500.0, "year planned": 2027.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km.", "other notes": "This corresponds to the Intermountain Power Agency (Utah substation, operated by LDWP) to Nevada Power Company Section of the TransWest Express transmission project.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.transwestexpress.net/about/docs/TransWest-Express-Route-Overview-033121.pdf", "existing": 0.8945, "planned": 1.5, "start_lat": 34.1141, "start_lon": -118.4068, "end_lat": 36.2333, "end_lon": -115.2654, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -118.4068, 34.1141 ], [ -115.2654, 36.2333 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-LD", "to": "USA-PE", "existing capacity + (mw)": 385.0, "existing capacity - (mw)": -465.0, "planned capacity + (mw)": 3000.0, "planned capacity - (mw)": -3000.0, "year planned": 2027.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km.", "other notes": "This corresponds to the Pacificorp East to Intermountain Power Agency (Utah substation, operated by LDWP) Section of the TransWest Express transmission project.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.transwestexpress.net/about/docs/TransWest-Express-Route-Overview-033121.pdf", "existing": 0.425, "planned": 3.0, "start_lat": 34.1141, "start_lon": -118.4068, "end_lat": 40.7776, "end_lon": -111.9311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -118.4068, 34.1141 ], [ -111.9311, 40.7776 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-LD", "to": "USA-WC", "existing capacity + (mw)": 389.0, "existing capacity - (mw)": -1760.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.0745, "planned": 0.0, "start_lat": 34.1141, "start_lon": -118.4068, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -118.4068, 34.1141 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-LG", "to": "USA-MI", "existing capacity + (mw)": 654.0, "existing capacity - (mw)": -670.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.662, "planned": 0.0, "start_lat": 38.1663, "start_lon": -85.6485, "end_lat": 42.3834, "end_lon": -83.1024, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -85.6485, 38.1663 ], [ -83.1024, 42.3834 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-LG", "to": "USA-PJ", "existing capacity + (mw)": 698.0, "existing capacity - (mw)": -626.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.662, "planned": 0.0, "start_lat": 38.1663, "start_lon": -85.6485, "end_lat": 41.8375, "end_lon": -87.6866, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -85.6485, 38.1663 ], [ -87.6866, 41.8375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-LG", "to": "USA-TV", "existing capacity + (mw)": 220.0, "existing capacity - (mw)": -598.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the TVA website.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.tva.com/energy/transmission/transmission-system-projects", "existing": 0.409, "planned": 0.0, "start_lat": 38.1663, "start_lon": -85.6485, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -85.6485, 38.1663 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-MI", "to": "USA-PJ", "existing capacity + (mw)": 10137.0, "existing capacity - (mw)": -9701.0, "planned capacity + (mw)": 2100.0, "planned capacity - (mw)": -2100.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "The Grain Belt Express previously did look at interconnecting with PJM but no concrete plans came from this. The St. Louis Star Tribune source contains a map indicating the route of the SOO Green transmission line, and confirms that this project is a new connection between MISO and PJM.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.utilitydive.com/news/soo-green-transmission-miso-pjm-interregional-big-wires-act-hickenlooper/693916/ ", "existing": 9.919, "planned": 2.1, "start_lat": 42.3834, "start_lon": -83.1024, "end_lat": 41.8375, "end_lon": -87.6866, "Capacity_Bin": "5-10" }, "geometry": { "type": "LineString", "coordinates": [ [ -83.1024, 42.3834 ], [ -87.6866, 41.8375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-MI", "to": "USA-SO", "existing capacity + (mw)": 415.0, "existing capacity - (mw)": -1013.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.714, "planned": 0.0, "start_lat": 42.3834, "start_lon": -83.1024, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -83.1024, 42.3834 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-MI", "to": "USA-SP", "existing capacity + (mw)": 93.0, "existing capacity - (mw)": -509.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.301, "planned": 0.0, "start_lat": 42.3834, "start_lon": -83.1024, "end_lat": 36.0555, "end_lon": -90.5149, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -83.1024, 42.3834 ], [ -90.5149, 36.0555 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-MI", "to": "USA-SW", "existing capacity + (mw)": 1311.0, "existing capacity - (mw)": -1201.0, "planned capacity + (mw)": 2500.0, "planned capacity - (mw)": -2500.0, "year planned": 2028.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. The Clean Line project's status is currently uncertain, and as a result its capacities have not been added (https://www.spglobal.com/marketintelligence/en/news-insights/research/as-ira-drives-renewables-investment-attention-turns-to-transmission-upgrades).", "other notes": "The Grain Belt Express Phase 1 line connects SPP to both MISO and AECI, and the Tiger Connector addition increases the total transmission to 2500 MW for Phase 1. Although SPP and MISO collaborated on the Joint Targeted Interconnection Queue (JTIQ) study, only the Raun line connects both SPP and MISO territory.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://grainbeltexpress.com/wp-content/uploads/2023/03/Grain-Belt-Express-Order-from-ICC-E-12_22-0499_Order-.pdf", "existing": 1.256, "planned": 2.5, "start_lat": 42.3834, "start_lon": -83.1024, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -83.1024, 42.3834 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-MI", "to": "USA-TV", "existing capacity + (mw)": 2930.0, "existing capacity - (mw)": -2266.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. ", "other notes": "MISO and TVA sources do not indicate any planned transmission projects between MISO and TVA.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cdn.misoenergy.org/MTEP23%20Full%20Report630587.pdf", "existing": 2.598, "planned": 0.0, "start_lat": 42.3834, "start_lon": -83.1024, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -83.1024, 42.3834 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-NE", "to": "USA-PE", "existing capacity + (mw)": 249.0, "existing capacity - (mw)": -499.0, "planned capacity + (mw)": 1500.0, "planned capacity - (mw)": -1500.0, "year planned": 2027.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km.", "other notes": "Planned capacity relates to the Cross-Tie Transmission Line. Construction is expected to start in Q1 of 2025 with assumed year of operation being 2027.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.transcanyon.com/projects/Cross-Tie-Transmission-Line/default.aspx", "existing": 0.374, "planned": 1.5, "start_lat": 36.2333, "start_lon": -115.2654, "end_lat": 40.7776, "end_lon": -111.9311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -115.2654, 36.2333 ], [ -111.9311, 40.7776 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-NE", "to": "USA-WC", "existing capacity + (mw)": 814.0, "existing capacity - (mw)": -842.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.828, "planned": 0.0, "start_lat": 36.2333, "start_lon": -115.2654, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -115.2654, 36.2333 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-NW", "to": "USA-PE", "existing capacity + (mw)": 299.0, "existing capacity - (mw)": -303.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.301, "planned": 0.0, "start_lat": 46.8751, "start_lon": -114.0214, "end_lat": 40.7776, "end_lon": -111.9311, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.0214, 46.8751 ], [ -111.9311, 40.7776 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-NW", "to": "USA-WA", "existing capacity + (mw)": 194.0, "existing capacity - (mw)": -126.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.16, "planned": 0.0, "start_lat": 46.8751, "start_lon": -114.0214, "end_lat": 45.7891, "end_lon": -108.5526, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.0214, 46.8751 ], [ -108.5526, 45.7891 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-NW", "to": "USA-WW", "existing capacity + (mw)": 4.0, "existing capacity - (mw)": -178.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.091, "planned": 0.0, "start_lat": 46.8751, "start_lon": -114.0214, "end_lat": 48.8361, "end_lon": -112.0908, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -114.0214, 46.8751 ], [ -112.0908, 48.8361 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-NY", "to": "USA-PJ", "existing capacity + (mw)": 2477.0, "existing capacity - (mw)": -3260.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "The Mineral Basin Solar Project does not appear to add an interconnection between the New York and PJM grids, and is just feeding solar electricity into the New York Grid. No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.governor.ny.gov/news/governor-hochul-announces-nations-largest-ever-state-investment-renewable-energy-moving", "existing": 2.8685, "planned": 0.0, "start_lat": 40.6943, "start_lon": -73.9249, "end_lat": 41.8375, "end_lon": -87.6866, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -73.9249, 40.6943 ], [ -87.6866, 41.8375 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PE", "to": "USA-PW", "existing capacity + (mw)": 1307.0, "existing capacity - (mw)": -1307.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 1.307, "planned": 0.0, "start_lat": 40.7776, "start_lon": -111.9311, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -111.9311, 40.7776 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PE", "to": "USA-WM", "existing capacity + (mw)": 452.0, "existing capacity - (mw)": -986.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.719, "planned": 0.0, "start_lat": 40.7776, "start_lon": -111.9311, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -111.9311, 40.7776 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PG", "to": "USA-PW", "existing capacity + (mw)": 166.0, "existing capacity - (mw)": -142.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.154, "planned": 0.0, "start_lat": 45.5371, "start_lon": -122.65, "end_lat": 39.5497, "end_lon": -119.8483, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.65, 45.5371 ], [ -119.8483, 39.5497 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PI", "to": "USA-SL", "existing capacity + (mw)": 165.0, "existing capacity - (mw)": -130.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.1475, "planned": 0.0, "start_lat": 47.5436, "start_lon": -122.7121, "end_lat": 47.6211, "end_lon": -122.3244, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.7121, 47.5436 ], [ -122.3244, 47.6211 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PI", "to": "USA-TR", "existing capacity + (mw)": 33.0, "existing capacity - (mw)": -73.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.053, "planned": 0.0, "start_lat": 47.5436, "start_lon": -122.7121, "end_lat": 47.2431, "end_lon": -122.4531, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -122.7121, 47.5436 ], [ -122.4531, 47.2431 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PJ", "to": "USA-TV", "existing capacity + (mw)": 1471.0, "existing capacity - (mw)": -1532.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "PJM and TVA sources do not indicate any planned transmission projects between PJM and TVA.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.pjm.com/-/media/documents/agreements/joint-reliability-agreement-jrca-pjm-tva.ashx", "existing": 1.5015, "planned": 0.0, "start_lat": 41.8375, "start_lon": -87.6866, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -87.6866, 41.8375 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PN", "to": "USA-PO", "existing capacity + (mw)": 0.0, "existing capacity - (mw)": -169.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.0845, "planned": 0.0, "start_lat": 35.1054, "start_lon": -106.6465, "end_lat": 39.762, "end_lon": -104.8758, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.6465, 35.1054 ], [ -104.8758, 39.762 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PN", "to": "USA-SW", "existing capacity + (mw)": 111.0, "existing capacity - (mw)": -121.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.116, "planned": 0.0, "start_lat": 35.1054, "start_lon": -106.6465, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.6465, 35.1054 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PN", "to": "USA-TP", "existing capacity + (mw)": 437.0, "existing capacity - (mw)": -281.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.359, "planned": 0.0, "start_lat": 35.1054, "start_lon": -106.6465, "end_lat": 32.1541, "end_lon": -110.8787, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.6465, 35.1054 ], [ -110.8787, 32.1541 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PN", "to": "USA-WM", "existing capacity + (mw)": 407.0, "existing capacity - (mw)": -337.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.372, "planned": 0.0, "start_lat": 35.1054, "start_lon": -106.6465, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -106.6465, 35.1054 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PO", "to": "USA-SW", "existing capacity + (mw)": 195.0, "existing capacity - (mw)": -199.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.197, "planned": 0.0, "start_lat": 39.762, "start_lon": -104.8758, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -104.8758, 39.762 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-PO", "to": "USA-WM", "existing capacity + (mw)": 748.0, "existing capacity - (mw)": -1092.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.92, "planned": 0.0, "start_lat": 39.762, "start_lon": -104.8758, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -104.8758, 39.762 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SA", "to": "USA-SC", "existing capacity + (mw)": 361.0, "existing capacity - (mw)": -252.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.santeecooper.com/About/Integrated-Resource-Plan/Reports-and-Materials/Santee-Cooper-2023-Integrated-Resource-Plan_Final-Rev_01.pdf", "existing": 0.3065, "planned": 0.0, "start_lat": 30.9052, "start_lon": -84.5732, "end_lat": 33.7094, "end_lon": -78.8844, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.5732, 30.9052 ], [ -78.8844, 33.7094 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SA", "to": "USA-SG", "existing capacity + (mw)": 62.0, "existing capacity - (mw)": -55.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.dominionenergy.com/projects-and-facilities/electric-projects/power-line-projects", "existing": 0.0585, "planned": 0.0, "start_lat": 30.9052, "start_lon": -84.5732, "end_lat": 32.8168, "end_lon": -79.9687, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.5732, 30.9052 ], [ -79.9687, 32.8168 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SA", "to": "USA-SO", "existing capacity + (mw)": 513.0, "existing capacity - (mw)": -111.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.312, "planned": 0.0, "start_lat": 30.9052, "start_lon": -84.5732, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.5732, 30.9052 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SC", "to": "USA-SG", "existing capacity + (mw)": 295.0, "existing capacity - (mw)": -1075.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. ", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.dominionenergy.com/projects-and-facilities/electric-projects/power-line-projects", "existing": 0.685, "planned": 0.0, "start_lat": 33.7094, "start_lon": -78.8844, "end_lat": 32.8168, "end_lon": -79.9687, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -78.8844, 33.7094 ], [ -79.9687, 32.8168 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SC", "to": "USA-SO", "existing capacity + (mw)": 277.0, "existing capacity - (mw)": -819.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. ", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.548, "planned": 0.0, "start_lat": 33.7094, "start_lon": -78.8844, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -78.8844, 33.7094 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SG", "to": "USA-SO", "existing capacity + (mw)": 81.0, "existing capacity - (mw)": -1036.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "The Dominion Energy website does not indicate any planned projects to connect Dominion Energy South Carolina to any region within the SOCO jurisdiction.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "http://www.southeasternrtp.com/docs/general/2009/process2009/2009_2ndMeeting_Presentation.pdf", "existing": 0.5585, "planned": 0.0, "start_lat": 32.8168, "start_lon": -79.9687, "end_lat": 33.7628, "end_lon": -84.422, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -79.9687, 32.8168 ], [ -84.422, 33.7628 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SM", "to": "USA-TC", "existing capacity + (mw)": 368.0, "existing capacity - (mw)": -258.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.floridapsc.com/pscfiles/website-files/PDF/Utilities/Electricgas/TenYearSitePlans/2022/Seminole%20Electric%20Cooperative.pdf", "existing": 0.313, "planned": 0.0, "start_lat": 28.4798, "start_lon": -82.53, "end_lat": 27.9945, "end_lon": -82.4447, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -82.53, 28.4798 ], [ -82.4447, 27.9945 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SO", "to": "USA-TA", "existing capacity + (mw)": 164.0, "existing capacity - (mw)": -38.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "City of Tallahassee document indicates that new utilities projects are all rebuilding existing transmission lines. No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.talgov.com/Uploads/Public/Documents/you/tysp_cotu.pdf", "existing": 0.101, "planned": 0.0, "start_lat": 33.7628, "start_lon": -84.422, "end_lat": 30.4551, "end_lon": -84.2527, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.422, 33.7628 ], [ -84.2527, 30.4551 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SO", "to": "USA-TV", "existing capacity + (mw)": 1114.0, "existing capacity - (mw)": -1499.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "The TVA source indicates that all new transmission projects to Georgia, Alabama, and Mississippi are within the TVA's jurisdiction and do not connect to Southern Company Services. No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://www.tva.com/energy/transmission/transmission-system-projects", "existing": 1.3065, "planned": 0.0, "start_lat": 33.7628, "start_lon": -84.422, "end_lat": 36.1715, "end_lon": -86.7842, "Capacity_Bin": "1-5" }, "geometry": { "type": "LineString", "coordinates": [ [ -84.422, 33.7628 ], [ -86.7842, 36.1715 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SP", "to": "USA-SW", "existing capacity + (mw)": 472.0, "existing capacity - (mw)": -239.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.3555, "planned": 0.0, "start_lat": 36.0555, "start_lon": -90.5149, "end_lat": 39.1238, "end_lon": -94.5541, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -90.5149, 36.0555 ], [ -94.5541, 39.1238 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SR", "to": "USA-TP", "existing capacity + (mw)": 759.0, "existing capacity - (mw)": -803.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.781, "planned": 0.0, "start_lat": 33.5722, "start_lon": -112.0892, "end_lat": 32.1541, "end_lon": -110.8787, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -112.0892, 33.5722 ], [ -110.8787, 32.1541 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SR", "to": "USA-WC", "existing capacity + (mw)": 255.0, "existing capacity - (mw)": -654.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.4545, "planned": 0.0, "start_lat": 33.5722, "start_lon": -112.0892, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -112.0892, 33.5722 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SW", "to": "USA-WA", "existing capacity + (mw)": 178.0, "existing capacity - (mw)": -139.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.1585, "planned": 0.0, "start_lat": 39.1238, "start_lon": -94.5541, "end_lat": 45.7891, "end_lon": -108.5526, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.5541, 39.1238 ], [ -108.5526, 45.7891 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-SW", "to": "USA-WM", "existing capacity + (mw)": 338.0, "existing capacity - (mw)": -198.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.268, "planned": 0.0, "start_lat": 39.1238, "start_lon": -94.5541, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -94.5541, 39.1238 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-TP", "to": "USA-WC", "existing capacity + (mw)": 62.0, "existing capacity - (mw)": -274.0, "planned capacity + (mw)": 748.0, "planned capacity - (mw)": -748.0, "year planned": 2028.0, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "Planned capacity relates to the Southline Transmission project. Construction is expected to start in 2025 with assumed year of operation being 2028.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://southlinetransmission.com/", "existing": 0.168, "planned": 0.748, "start_lat": 32.1541, "start_lon": -110.8787, "end_lat": 31.563, "end_lon": -110.3153, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -110.8787, 32.1541 ], [ -110.3153, 31.563 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-WA", "to": "USA-WM", "existing capacity + (mw)": 109.0, "existing capacity - (mw)": -48.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.0785, "planned": 0.0, "start_lat": 45.7891, "start_lon": -108.5526, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -108.5526, 45.7891 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "USA-WC", "to": "USA-WM", "existing capacity + (mw)": 90.0, "existing capacity - (mw)": -500.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's.", "other notes": "No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.", "source existing (2023)": "https://www.eia.gov/electricity/gridmonitor/about", "source planned": "https://cleanenergygrid.org/wp-content/uploads/2023/09/ACEG_Transmission-Projects-Ready-To-Go_September-2023.pdf", "existing": 0.295, "planned": 0.0, "start_lat": 31.563, "start_lon": -110.3153, "end_lat": 38.8674, "end_lon": -104.7605, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ -110.3153, 31.563 ], [ -104.7605, 38.8674 ] ] } },
{ "type": "Feature", "properties": { "from": "SDN-XX", "to": "SSD-XX", "existing capacity + (mw)": 32.0, "existing capacity - (mw)": -32.0, "planned capacity + (mw)": 0.0, "planned capacity - (mw)": 0.0, "year planned": null, "assumptions/applied methods": "Following the World Bank Report; \"South Sudan imports a small amount of electricity from Sudan through a 32 MW/220 kV interconnector in Upper Nile State that distributes power to local customers through the Renk substation, but the supply from this line has been unreliable due to the power shortage in Sudan.\" No reported concrete plans for new projects within the World Bank Report so planned capacities set to 0.", "other notes": null, "source existing (2023)": "https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf", "source planned": "https://ewsdata.rightsindevelopment.org/files/documents/91/WB-P178891_JOZPp03.pdf", "existing": 0.032, "planned": 0.0, "start_lat": 16.04849354, "start_lon": 30.00544151, "end_lat": 7.31, "end_lon": 30.25, "Capacity_Bin": "0-1" }, "geometry": { "type": "LineString", "coordinates": [ [ 30.00544151, 16.04849354 ], [ 30.25, 7.31 ] ] } }
]
}