# "Projects" tab [← Manual](README.md) Top left the projects, below them the combined plans, on the right the parts of the selected entry. ![Projects](../screenshot_projekte_en.png) ## Projects - **New**, **Edit**, **Delete**, **Duplicate** as usual. - **Restart project**: to cut a project once more – progress of all parts goes back to 0, saved plans are deleted, stock stays unchanged (asks first). - **Number of copies**: if a project is built several times, set the number on the project – all copies are optimized together. - Import/export as JSON, import part lists from CSV. - A small 🔗 marks projects that are part of a combined plan (the tooltip names it). Cut jobs are not listed here but in the [Parts](4-parts.md) tab. ## Parts Every part has a label, type, material, dimensions, quantity (per copy) and grain direction (any, lengthwise, crosswise). The progress shows how many have already been cut. In the "Edit part" dialog the **finished parts** (pieces in stock) can be corrected by hand, e.g. after a stocktaking. Parts whose material is cut in a combined plan are **grey** and show "→" with the name of the combined plan; clicking it selects the combined plan. They can still be edited – a combined plan that has already been calculated is then marked as outdated. ## Combined plans A combined plan cuts the parts of several projects from **one material** together – this often saves whole bars or panels. There is at most one combined plan per material. The entries in the "Combined plans" box carry a 🔗 and the label "Combined plan". ![Combined plan in the Projects tab](../screenshot_sammelplaene_en.png) - **New**: choose the material, then tick the projects with open parts in this material. If the material already has a combined plan, that one is opened. It is named "Sammelplan" plus the material name, e.g. "Sammelplan Beech batten 20x40". - **Edit**: rename. - **When selected**, the right box shows the members with checkboxes (change them there) and below their parts in this material, grouped by project and read-only. Project names link to the project; parts are edited there. - **Optimize** jumps to [Optimization](5-optimization.md#combined-plan) and selects this combined plan there. - **Delete** like a project, with a warning if cutting has already started. Nothing is lost: parts already cut stay cut in their projects, the rest becomes open again and reserved stock pieces are released. Afterwards the projects can be optimized individually or combined anew.