--- name: internal-control-framework description: "Internal control framework guide. Referenced by scope-designer and checklist-builder agents when designing audit scope and control items. Used for 'COSO', 'internal controls', 'control testing' requests. Note: external audit representation and legal opinion preparation are out of scope." --- # Internal Control Framework Enhances the audit design capabilities of scope-designer / checklist-builder agents. ## COSO Internal Control Framework ### 5 Components | Component | Description | Audit Points | |-----------|-------------|-------------| | Control Environment | Organizational culture, ethics, competence | Code of ethics, segregation of duties, training | | Risk Assessment | Identification/analysis of risks to objectives | Risk assessment process, documentation | | Control Activities | Policies/procedures responding to risks | Approvals, verification, physical controls | | Information/Communication | Timely delivery of necessary information | Reporting structure, IT controls | | Monitoring | Continuous evaluation of control effectiveness | Self-assessments, internal audit | ### Control Types | Type | Description | Examples | |------|-------------|---------| | Preventive | Block before occurrence | Approval procedures, access restrictions, training | | Detective | Discover after occurrence | Audit logs, reconciliation, anomaly detection | | Corrective | Rectify after discovery | Corrective actions, rollback, recovery | ### Control Testing Methods | Method | Description | Best For | |--------|-------------|----------| | Inquiry | Interview the owner | Initial understanding, process mapping | | Observation | Observe actual execution | Field control verification | | Inspection | Review documents/records | Evidence verification, approval records | | Reperformance | Execute the control procedure | Direct verification of control effectiveness | ## Audit Scope Design Framework ### Risk-Based Audit Approach ``` 1. Identify audit target processes 2. Assess inherent risk (amount, complexity, change) 3. Assess control risk (control design, operating effectiveness) 4. Residual risk = Inherent risk × Control risk 5. Prioritize audit by highest residual risk ``` ### Audit Scope Definition Template ```markdown ## Audit Scope ### In-Scope - Period: [YYYY-MM-DD to YYYY-MM-DD] - Target: [Department/Process/System] - Criteria: [Regulations/Policies/Laws] ### Out-of-Scope - [Excluded items and rationale] ### Audit Criteria | Criteria | Source | |----------|--------| | [Criteria 1] | [Internal policy/Law] | | [Criteria 2] | [Industry standard] | ``` ## Checklist Design Patterns ### Control Item Card ```markdown ## Control Item: [ID]-[Item Name] - Category: [COSO component] - Type: [Preventive/Detective/Corrective] - Owner: [Department/Role] - Frequency: [Daily/Weekly/Monthly/Quarterly/Annual] ### Control Description [Specific control activity description] ### Test Procedure 1. [Test step 1] 2. [Test step 2] 3. [Verification criteria] ### Evidence - [Required evidence list] ### Determination Criteria - Effective: [Criteria] - Partially effective: [Criteria] - Ineffective: [Criteria] ``` ## Quality Checklist | Item | Criteria | |------|----------| | COSO coverage | 5 components reviewed | | Risk-based | Residual risk-based prioritization | | Control types | Preventive/detective/corrective balance | | Test methods | 2+ methods per item | | Evidence | Required evidence specified per test | | Determination | 3-level determination criteria |