--- name: workshop-designer description: Design a half-day or full-day strategy workshop that ends with a committed decision and named owners — not a "great discussion" with no artifact. Outputs an hour-by-hour agenda, breakout prompts with expected outputs, pre-reads, facilitator playbook for when things go sideways, and the post-workshop artifact that justifies the day. Use for offsites, leadership alignment sessions, kickoff workshops, planning meetings >2 hours. --- # Workshop Designer Most workshops fail the same way: a lot of conversation, an emergent "alignment" that no one writes down, and a calendar invite for a follow-up workshop. This skill designs sessions that end with a **committed artifact and named owners**, because that's the only thing that justifies pulling people out of their week. The test for any workshop: **what artifact ships out of this room, and who owns the next step?** If you can't answer, don't run the workshop. --- ## Design choices - **One outcome, not three.** A workshop with three goals achieves zero. Force-rank to one decision or one artifact. - **Diverge then converge, never both at once.** Brainstorm sessions and decision sessions are different brain modes. Mixing them creates "discussion" that converges on nothing. - **Breakouts < 4 people.** Above 4, one person dominates. Report-backs < 5 min each, or you lose the room. - **Energy curve matters.** Heavy thinking morning, application + decisions afternoon. Never schedule a decision moment right after lunch. - **The artifact is the deliverable, not the meeting.** Pre-build the template; the workshop fills it in. Leaving "we'll write it up later" is how alignment evaporates by Tuesday. - **Facilitator plays referee, not participant.** If you have a stake in the decision, you can't facilitate. Pick one or the other. --- ## Inputs needed (interview if missing) 1. **Workshop goal — one sentence.** "End with an agreed Q3 OKR set" / "End with a decision on whether to build, buy, or partner" / "End with a 90-day plan owned by named leads." 2. **Attendees.** Names + roles. Cap at 12 for decision workshops, 20 for divergent (brainstorm) workshops. 3. **Duration.** Half-day (4 hrs incl. break), full-day (6–7 hrs incl. lunch + breaks). Multi-day = different format. 4. **What's already decided going in.** Constraints, locked-in choices. Surface these upfront so people don't re-litigate them. 5. **What's open.** The actual decision space. 6. **What the artifact is.** The thing that leaves the room. (Strategy on a page, OKRs, decision memo, prioritized roadmap, etc.) 7. **Who facilitates.** Internal (cheaper, has context) or external (neutral, harder to derail). --- ## Output format ### 1. Workshop charter (1 page, pre-read) - The one outcome - Decisions in scope vs. out of scope - Attendee list with role in the workshop (decider / contributor / observer) - Required pre-work ### 2. Hour-by-hour agenda | Time | Block | Mode | Output | Owner | |------|-------|------|--------|-------| | 9:00 | Frame + outcome | Plenary | Shared understanding of one outcome | Facilitator | | 9:15 | Constraints recap | Plenary | Locked items on the wall, no debate | Sponsor | | 9:30 | Divergent: option generation | Breakout (3s) | 5–8 options per group | Breakouts | | 10:30 | Report-back + cluster | Plenary | One synthesized list, ~12 options | Facilitator | | 11:00 | Break | — | — | — | | 11:15 | Convergent: rank options | Plenary, dot-vote | Top 3 options | All | | 12:00 | Lunch | — | — | — | | 1:00 | Deep-dive top option | Breakout (5–6) | Filled-in decision template | Sub-team | | 2:30 | Plenary review + decide | Plenary | Go / no-go + owner | All | | 3:00 | Wrap + commitments | Plenary | Named owners, dates, next step | Facilitator | | 3:30 | Done | — | Filled artifact in hand | — | ### 3. Breakout playbook For each breakout: the **prompt** (one question), **expected output** (concrete deliverable), **time** (strict), **roles** (timekeeper, scribe, reporter). ### 4. Facilitator's "what if" notes The 5 things that go wrong and what to do: - "One exec dominates" → name it, rotate to round-robin - "Group can't converge in the convergent block" → cut to 2 options, force a coin-flip-or-rationale framing - "New constraint surfaces mid-day" → park it on a 'parking lot' wall, re-decide if it changes the call - "Sponsor changes the goal mid-workshop" → pause, get the new outcome in writing, ask the room if it still works - "Pre-reads weren't read" → 10 min silent reading of the 1-page summary, skip the original frame block ### 5. The artifact template The thing the workshop fills in. Pre-built. Examples: - Strategy on a page (Aspiration / Where to play / How to win / Capabilities / Mgmt systems) - Q3 OKR set (3 objectives, 3 KRs each, owners) - Decision memo (Context / Options / Recommendation / Risks / Ask) ### 6. Post-workshop send (24-hour SLA) What goes out within 24 hrs: the artifact + the commitments table (who owns what by when). Drafted before the workshop, populated during. --- ## Process 1. **Lock the one outcome.** Push back on multi-outcome workshops. Run two days or one workshop and a follow-up. 2. **Design the artifact first.** Reverse-engineer the agenda from what the artifact needs. 3. **Plot the energy curve.** Heavy thinking 10am–12pm, decision 2pm–3pm, never after lunch directly. 4. **Mode-tag every block:** divergent / convergent / plenary / breakout. If two adjacent blocks are the same mode for more than 90 min, restructure. 5. **Write the facilitator script.** Not the slides — the verbatim framing for each transition. "We just spent an hour generating options. Now we're going to converge to three. The criterion is X. Each person gets 3 dots." 6. **Pre-build the "what if" playbook.** Workshops go sideways for the same 5 reasons. 7. **Calendar the post-send before the workshop.** 24-hr SLA for the artifact. If you don't pre-commit, it slips. --- ## Worked example **Workshop:** Align the 12-person leadership team on Q3 strategic priorities. **One outcome:** Leave with a Q3 strategy-on-a-page signed off by all 12. **Duration:** Full day, 9:00–3:30. **Constraints (decided coming in):** Headcount frozen; AI investment ringfenced; no new product lines. **Open:** Where to invest the 30% engineering capacity that's currently uncommitted. ### Pre-reads (sent 5 days before) - Q2 retrospective: top 3 wins, top 3 misses (1 page) - 6 candidate investment areas with 1-paragraph cases each (3 pages) - Strategy-on-a-page template, pre-filled with locked items (1 page) ### Agenda | Time | Block | Mode | Output | |------|-------|------|--------| | 9:00 | Frame: today we leave with the strategy-on-a-page filled. The one open question: where do we point the uncommitted 30% capacity? | Plenary | Shared frame | | 9:15 | Q2 reflect: 1 win + 1 miss from each leader (1 min each, no discussion) | Plenary | Public reflection, surfaces what's on people's minds | | 9:45 | Breakouts of 3: rank the 6 candidate investments + propose 1 outside the pre-read | Breakout | 4 ranked lists | | 10:30 | Report-back + cluster | Plenary | One unified list, ~7 options | | 11:00 | Break | | | | 11:15 | Silent dot-voting: each leader gets 5 dots, places on the 7 options | Convergent | Top 3 emerge | | 11:45 | Devil's advocate: 1 person assigned to argue against each of the top 3 | Plenary | Stress-tested top 3 | | 12:15 | Lunch | | | | 1:15 | Breakouts of 4: each group takes one of the top 3 and fills in a 1-page "what this looks like in Q3" (investment, expected outcome, risks) | Breakout | 3 filled 1-pagers | | 2:30 | Plenary: choose 1 (or up to 2 if separable) | Convergent | Decision | | 2:45 | Fill in the strategy-on-a-page live on screen | Plenary | Artifact complete | | 3:15 | Commitments: named owner for each Q3 priority, kickoff date | Plenary | Owners table | | 3:30 | Wrap | | Artifact + commitments in hand | ### Facilitator's "what if" - **Most likely failure:** group can't converge to 1 in the 2:30 block. Pre-decide: if no 70% consensus by 2:45, sponsor (CEO) gets the tie-breaker. Communicate this upfront so it's not a surprise. - **Second risk:** Q2 retrospective opens old wounds. Time-box hard, no rebuttals, facilitator interrupts if anyone goes >90 sec. - **Third risk:** someone re-litigates the headcount freeze. Point at the wall ("locked items"), defer to a different forum. ### Post-workshop send (drafted before, populated during) Email within 24 hours, subject: "Q3 strategy: locked. What you own." - Strategy on a page (attached PDF, photo of physical version on the wall) - Commitments table: each leader's Q3 priority owner-name + first milestone date - Next sync: 2-week check-in with this same group --- ## Common mistakes to avoid - **Multi-outcome workshops.** "Alignment + brainstorm + decisions" = none of the three. Pick one. - **No artifact template.** "We'll write it up" = it doesn't get written up. Pre-build. - **Schedule fills, work doesn't.** Tight timeboxes feel good but don't generate output. Build in 15 min of slippage per major block. - **Mixing divergent and convergent.** "Let's brainstorm options and pick the best one in 45 min" produces neither good options nor a defensible pick. - **Decision moment right after lunch.** Energy nadir. Schedule application work there, not commitment. - **>4 in a breakout.** Loud voice dominates. Always split into 3s or 4s. - **No "what if" playbook.** Workshops sideways predictably. Have the moves ready. - **The sponsor facilitates.** They have a stake — they'll bias the room. Pick a neutral facilitator or rotate someone external in. --- ## When to use - Leadership offsites (half-day or full-day) - Quarterly planning sessions - Strategy resets after a major change - Kickoff workshops for cross-functional initiatives - M&A integration alignment - Any working session > 2 hours ## When NOT to use - Recurring meetings (use a different format) - Status updates (workshop is too much; use an async memo) - 1:1s, small group decisions <5 people (use Meeting Prep Kit) - Trainings (different design — facilitation vs. learning are different jobs) --- ## Pairs well with - **Meeting Prep Kit** — pre-workshop 1:1s with key attendees to map stances; reduces in-room surprises - **Stakeholder Map** — map the room before designing the agenda; the breakouts you design depend on who's in the room - **Decision Memo Builder** — the artifact that leaves a decision workshop is often a decision memo - **Storyline Builder** — pre-reads structured as a storyline land better than narrative pre-reads