# rollback - Rehearse rollback **Enter when:** a deploy is planned for the next 48 hours, the FDE says "we can always revert," a previous rollback failed or took too long, or the engagement involves regulated/critical systems. **Read first:** `delivery.md` (the deployment record), `terrain.md`, `trust-profile.md` (for change-approval requirements), `context.md`. "We can always revert" is the most dangerous sentence in deployment. A rollback plan that hasn't been tested is a wish, not a plan. The drill proves the escape route works before you need it at 2am. ## Method (you do this work) **1. Map the rollback path for every change type:** | Change type | Rollback method | Complication | Test | |-------------|----------------|--------------|------| | **Code deploy** | Revert the PR / redeploy previous version | Feature flags, cache invalidation | Deploy previous version to staging, verify function | | **Database migration** | Compatible rollback, restore, or roll-forward | Irreversible transforms, concurrent writes, old/new schema compatibility | Rehearse on representative staging data; verify integrity, elapsed time, and possible data loss | | **Config change** | Restore previous config | Propagation delay, dependent service restarts | Flip config, verify all services pick it up | | **Infrastructure** | Terraform/Pulumi rollback or manual | State drift, dependent resources | Plan the rollback, review the diff | | **Data backfill** | Restore from backup or reverse script | Mixed old/new data states | Run reverse on a 100-row sample | **2. Identify the irreversible components.** Some changes can't be rolled back: - Column drops after data migration - Encryption key rotations after old key is destroyed - External API version deprecations - Emails/notifications already sent - Published API changes consumed by third parties For each irreversible component: **what's the compensating action?** Not "undo" but "what do we do to recover the same effect?" **3. Run the drill.** On staging or a test environment - never on production: ``` DRILL PROTOCOL: 1. Deploy the change (confirm it works) 2. Start a timer 3. Execute the documented rollback procedure - exactly as written, no shortcuts 4. Measure: time to complete, services affected, data state after 5. Verify: can users still do the critical path? 6. Record: what worked, what was unclear, what failed ``` **4. The drill report.** Honest, specific, actionable: ```markdown ## Rollback drill - Change: Environment: staging Rollback method: Time to rollback: Result: PASS / FAIL / PARTIAL What worked: - Code revert completed in 45s - Feature flag disabled correctly What didn't: - Database down migration left orphan rows in junction table - Cache took 3 minutes to invalidate (stale data served) Actions before production deploy: - [ ] Fix down migration to clean junction table - [ ] Add cache-bust step to rollback procedure - [ ] Verify cache invalidation time is acceptable ``` **5. The "acceptable rollback time" conversation.** With the FDE and the team: > "If this deploy fails in production, how long can the system be in a degraded state before it's a business problem?" | Answer | Implication | |--------|-------------| | "Minutes" | Automated rollback trigger needed - human decision loop is too slow | | "An hour" | Manual rollback is acceptable if the procedure is tested and documented | | "A day" | Gradual rollback is fine - feature flag off, monitor, clean up next morning | | "It can't fail" | Blue/green deployment with instant traffic switch - test both environments | **6. Change-approval environments (CAB).** In regulated industries: - The rollback procedure is part of the change ticket - filed before the approval window. - The drill evidence goes with the change request: "Rollback tested on , completed in