--- title: "Hotel fire safety | Mr Wallcover" url: https://www.mrwallcover.com/advice/hotel-fire-safety-and-compliance/ description: "Hotel wallcovering fire safety: who classifies and declares the rating, why the tested build-up matters, installing to the maker's system, RAMS, handover." author: "Dorin Burcus" last_updated: 2026-10-17 --- The Wallcovering Guide / planning # Fire safety and compliance for hotel wallcoverings Where a hotel wallcovering's fire classification comes from, why it belongs to the tested build-up, what the installer does, and the RAMS, insurance and handover papers that come with the package. By [Dorin Burcus](https://www.mrwallcover.com/about/#dorin), founder · Last updated 17 October 2026 [Discuss a hotel package](https://www.mrwallcover.com/contact/?intent=install&audience=hotel&service=wallcovering&topic=guide%3Ahotel-fire-safety-and-compliance) Diagram: Wallcovering, adhesive and substrate are considered together in the tested system. No fire classification is illustrated or claimed. Labels: Wallcovering; Adhesive; Substrate; Review the tested system together. Schematic · not to scaleThis illustrates the distinction only and carries no classification. Obtain the current document for the exact wallcovering, backing, adhesive and substrate, then have the responsible project professional confirm acceptance. Who certifies a hotel wallcovering’s fire performance? Not the installer. The class comes from testing and classification of the product in a stated build-up, and the wallcovering manufacturer declares it in its declaration of performance. Mr Wallcover installs to the wallcovering maker’s instructions and the project’s fire specification, and does not call a wallcovering fire-rated unless that product’s own data says so. This guide explains what that means on a hotel project, what the specification has to settle before anything is ordered, and the papers that come with our package. For the classes themselves, England’s Table 6.1, the other UK nations and what makers’ documents show product by product, see our [wallcovering fire ratings reference](https://www.mrwallcover.com/advice/wallcovering-fire-ratings-uk/). ## Why does a fire classification belong to the build-up, not the paper? A fire classification, such as a Euroclass under EN 13501-1, belongs to the build-up that was tested: the wallcovering, the adhesive and the substrate together. A substitute product or adhesive needs its own evidence. “Contract wallcovering” or “vinyl” on a sample card is not evidence of any classification, and [contract vinyl](https://www.mrwallcover.com/materials/contract-vinyl/) on a wall is not, by itself, a fire certificate. ## Is there one class that hotels need? No. A guest room, a public corridor and a protected stair can have different requirements, and no single class is what “hotels need”. In England, Approved Document B’s Table 6.1 gives different minimum classes for small rooms, other rooms and circulation spaces, and a project’s fire strategy can ask for more; our [fire ratings reference](https://www.mrwallcover.com/advice/wallcovering-fire-ratings-uk/#england) sets out the table and its wallcovering note. For a hotel, get the current classification document for the exact product, backing and installation method. For building work, the responsible designer, fire engineer or building-control body accepts it. Where the work is not building work, the hotel’s responsible person accepts it, through the fire risk assessment. Whether an older British classification satisfies a project is for them to decide, not the installer. ## What does the installer do? We install the specified system as the maker sets it out. The adhesive and primer are part of that system and are used as the maker lists them: for Vescom products, Vescom lists the correct ones per product on its [adhesives and accessories page](https://vescom.com/en/adhesives-accessories), and other makers’ instructions do the same for theirs. The same rule runs through our [material pages](https://www.mrwallcover.com/materials/): we do not call a family washable, fire-rated or seamless unless that product’s own data says so. Acoustic and environmental performance work the same way as fire: each is evidenced by the exact product’s own documents. Whoever set the requirement accepts that evidence. ## What paperwork comes with the package? - **RAMS.** Risk assessments and method statements are issued for every package, and Dorin Burcus personally supervises the site. - **Insurance.** Public liability, employers’ liability and professional indemnity details are available on request. - **Contracts.** We have experience of JCT contracts as a specialist package contractor, and are registered for VAT and CIS. - **Handover.** A room-by-room record of the installed product, colourway, batch and care sheet; spare material from the same batch, kept dry with its batch label and stored as the maker recommends; a note of the limits of matching a later repair; and the aftercare terms. The fire, acoustic and environmental evidence in that pack is the exact product’s own documents. ## How does this work in a hotel that stays open? Most of the hotel work on our record was done in buildings that stayed open. [Brown’s Hotel](https://www.mrwallcover.com/projects/browns-hotel-mayfair/) never stopped taking guests across a two-year decorating programme. In an occupied hotel, the permitted working hours, delivery routes, guest routes and daily handover are agreed for each project and written into the scope. Night shifts, out-of-hours and weekend work are offered, including in live hotels. The [hotel specification guide](https://www.mrwallcover.com/advice/hotel-wallcovering-specification/) covers the sample room, batch control and phasing in more detail. ## What this guide cannot tell you It explains where a classification comes from and how we work to a specified system. It does not certify any product, it is not fire-engineering advice, and it does not replace the review of the responsible designer, fire engineer or building-control route, or of the responsible person for a building in use. For a hotel package, send the room types, the floor or phase schedule, occupancy, working hours and the material codes, with the fire requirement each area carries; the [hotels and operators page](https://www.mrwallcover.com/professionals/hotels/) lists what else to include. ## Questions people ask Illustrative material studies Pause motion ### Do you install Class A / B-s1,d0 fire-rated wallcoverings, and can you evidence it? Mr Wallcover does not call a wallcovering fire-rated unless that product's own data says so. A fire classification, such as a Euroclass under EN 13501-1, belongs to the build-up that was tested: the wallcovering, the adhesive and the substrate together. "Class A" on its own is not a class name under EN 13501-1: it may refer to a US ASTM E84 result, which is not a European class, or be loose shorthand for European class A1 or A2, so ask for the full classification, such as B-s1,d0. A substitute product or adhesive needs its own evidence. For a hotel, get the current classification document for the exact product, backing and installation method. For building work, the responsible designer, fire engineer or building-control body accepts it. Where the work is not building work, the hotel's responsible person accepts it, through the fire risk assessment. A guest room, a public corridor and a protected stair can have different requirements, and no single class is what "hotels need". The adhesive and primer are part of the specified system and are used as the maker lists them (Vescom, for example, lists them per product). The fire classification is not certified by the installer: it comes from testing and classification of the product in a stated build-up, and the wallcovering manufacturer declares it. Mr Wallcover installs to the wallcovering maker's instructions and the project's fire specification. ### What insurance do you hold? Public liability, employers' liability and professional indemnity details are available on request. ### Do you issue RAMS, and who supervises the site? Risk assessments and method statements (RAMS) are issued for every package, and Dorin Burcus personally supervises the site. ## Further reading - [Vescom: adhesives and accessories](https://vescom.com/en/adhesives-accessories) Your next step ## Bring it back to your room. Send the material reference and what you already know. A photograph and a short note are enough to start. [Discuss a hotel package](https://www.mrwallcover.com/contact/?intent=install&audience=hotel&service=wallcovering&topic=guide%3Ahotel-fire-safety-and-compliance) ## Explore the materials [Contract vinyl](https://www.mrwallcover.com/materials/contract-vinyl/) [Acoustic wallcoverings](https://www.mrwallcover.com/materials/acoustic/) ## Keep reading Illustrative study Pause motion 07 / planning ## [Hotel wallcoverings](https://www.mrwallcover.com/advice/hotel-wallcovering-specification/) Specifying wallcoverings for an occupied hotel: cleaning and durability, the sample room, batch control, phasing around guests, product documents, spares and handover. [Read the guide](https://www.mrwallcover.com/advice/hotel-wallcovering-specification/) ![Limerence wallpaper meeting joinery in the suite.](https://www.mrwallcover.com/media/img/r/old-bailey-14-800.webp) During works: House of Hackney Limerence at 15 Old Bailey. Photograph: Dorin Burcus. 08 / planning ## [Designer checklist](https://www.mrwallcover.com/advice/designer-specification-checklist/) What a wallcovering specification needs before site: maker and code, elevations, repeat and match, samples, light, lining, free-issue responsibilities and change control. [Read the guide](https://www.mrwallcover.com/advice/designer-specification-checklist/) ![Green-painted guest corridor at Hyde London City.](https://www.mrwallcover.com/media/img/r/old-bailey-18-800.webp) Guest corridor at 15 Old Bailey, where we delivered the decorating package. Photograph: Dorin Burcus. 09 / planning ## [Developer package](https://www.mrwallcover.com/advice/developer-wallcovering-package/) What a wallcovering package needs to be priced, programmed and handed over: scope, measurement basis, substrate handover, programme, changes, snagging and spares. [Read the guide](https://www.mrwallcover.com/advice/developer-wallcovering-package/)