--- title: "DoubleTree Victoria | Mr Wallcover" url: https://www.mrwallcover.com/projects/doubletree-victoria/ description: "Guest room wallcoverings at DoubleTree by Hilton London – Victoria, Bridge Place, in 2023." author: "Dorin Burcus" last_updated: 2026-10-22 --- 2 Bridge Place, Victoria, London SW1 # DoubleTree by Hilton London – Victoria Guest room wallcoverings at the Victoria hotel, spring and summer 2023. ![The hotel building on Bridge Place, Victoria, in 2010, when it traded as the Hesperia London Victoria; it is now the DoubleTree by Hilton London – Victoria.](https://www.mrwallcover.com/media/img/doubletree-victoria-commons-01.jpg) The building on Bridge Place in 2010, when it was the Hesperia London Victoria. Venue photograph, not our work. Photograph: Stacey Harris / Wikimedia Commons (CC BY-SA 2.0). ## Project record Client, materials & project facts **Client** : DoubleTree by Hilton London – Victoria **Designer** : –Not recorded **Main contractor** : –Not recorded **Maker and paper** : –Not recorded **Area or rooms** : –Not recorded **Scope** : Guest room wallcoverings **Year** : 2023 ## At a glance - **Hotel:** DoubleTree by Hilton London – Victoria - **Address:** 2 Bridge Place, Victoria - **Years on site:** March to September 2023 - **Scope:** guest room wallcoverings ## The work The rooms were hung while the hotel stayed in use. Access, protection and the order of floors were agreed so a finished room could be handed back without the next room waiting on a guess. ## Photographs on this page This is a photograph of the building by another photographer, credited below. It was taken in 2010, before the hotel took the DoubleTree name, and it shows the building, not our work. - The building on Bridge Place in 2010, when it was the Hesperia London Victoria: photograph by Stacey Harris, [CC BY-SA 2.0](https://creativecommons.org/licenses/by-sa/2.0), via [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Bridge_Place,_Victoria,_London_SW1V_-_geograph.org.uk_-_1766428.jpg). Resized for the web. How the commission ran ## The same standards, on every commission. Each commission has a written scope by room, walls prepared until they are true, protected floors, batch and shade control, set-out from the room’s focal points, and a return visit. [Read the method](https://www.mrwallcover.com/practice/#method). The six standards in full 01 ### Survey and scope, room by room We measure the wall that will actually be hung, allow for the repeat and the wastage, and write a scope of works room by room before anyone orders paper. 02 ### Preparation decides the finish Walls are filled, made good and primed until they are true. If a wall is not ready for the material specified, we say so before the last drop is ordered. 03 ### Protection and containment Floors, furniture and finished joinery are protected as part of the hang. Work is contained and the place is left tidy each evening. In a home we are visitors; in a hotel we work around the house. 04 ### Batch and shade control Deliveries are checked against the measure, and batches and shading are managed so that a corridor of rooms reads as one surface. 05 ### Set out from the room's focal points Pattern is set out from chimneypieces, doorcases and bed walls, so the pattern sits square to the cornice and the joinery. 06 ### One team, then the return visit The people who start are the people who finish. Four to six weeks after completion we come back to look at every seam and edge, and the workmanship is guaranteed for twelve months. [See the finish up close: seams, internal corners, edges and joins from our own installations](https://www.mrwallcover.com/details/) By [Dorin Burcus](https://www.mrwallcover.com/about/#dorin), founder · Last updated 22 October 2026