--- title: "Everyman cinema, Liverpool | Mr Wallcover" url: https://www.mrwallcover.com/projects/everyman-liverpool/ description: "Bespoke large-format digital wallcoverings of classic film and music imagery, installed at the Everyman cinema, Liverpool, in autumn 2018. Muraspec print." author: "Dorin Burcus" last_updated: 2026-10-22 --- Metquarter, Liverpool # Everyman cinema, Liverpool Bespoke extra-wide digital prints of classic film and music imagery for the Everyman cinema in Liverpool, hung floor to ceiling as single pictures across the walls. ![Colour digital-print mural of a classic Italian street scene in the Everyman cinema bar, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-11-800.webp) ## Project record Client, materials & project facts **Client** : Everyman cinema **Designer** : –Not recorded **Main contractor** : –Not recorded **Maker and paper** : Muraspec (digital print) **Area or rooms** : –Not recorded **Scope** : Installation of bespoke large-format digital wallcoverings **Year** : 2018 In October to December 2018 we installed bespoke digital wallcoverings at the Everyman cinema in Liverpool: extra-wide, large-format prints of classic film and music imagery, printed by Muraspec and hung as single pictures from floor to ceiling. ## At a glance - **Client:** Everyman cinema, Liverpool - **Where:** Metquarter, Victoria Street, Liverpool - **When:** October to December 2018 - **Scope:** installation of bespoke large-format digital prints - **Wallcovering:** Muraspec digital print, extra-wide - **Imagery:** black-and-white film stills and colour street scenes ## The venue Everyman’s Liverpool cinema at the Metquarter opened on 18 December 2018: four screens in 18,000 sq ft, with a bar, a Spielburger kitchen and food and drink served to the seats ([Place North West, 15 November 2018](https://www.placenorthwest.co.uk/everyman-to-open-before-christmas/)). Our installation ran from October to December 2018, in the weeks before the opening. ## A picture, not a pattern A digital mural is one image cut into drops. If a drop is hung out of order, a few millimetres high, or stretched as it is pasted, a face or a line breaks at the joint and the picture is lost. Each drop is hung in sequence and matched across the joint, from the top of the wall down. ## Preparing the walls A large print shows every bump beneath it, so the walls were prepared and lined before the murals went up, as one of the photographs shows. Scaffold towers and platforms gave a safe working height on the tallest walls. ## Photographs on this page Our own photographs, first posted on our Instagram, [@mrwallcover](https://www.instagram.com/mrwallcover/), from October to December 2018: the finished murals first, then installation and preparation. The faces in the murals are printed artworks. The work is recorded in our posts of 24 October 2018 ([see the post](https://www.instagram.com/p/BpT508uHLMu/)) and 27 November 2018 ([see the post](https://www.instagram.com/p/BqsxZT2gAjQ/)). ## Photographs ![Large black-and-white film mural fitted floor to ceiling in a corridor of the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-09-800.webp) ![Framed black-and-white film-star mural panel on timber panelling, Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-05-800.webp) ![Black-and-white digital-print mural of a classic film star on a wall of the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-04-800.webp) ![Close-up of a black-and-white digital-print mural of a classic film kiss, the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-08-800.webp) ![Large digital-print mural of classic music icons being installed in the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-01-800.webp) ![Wide view of the street-scene mural with installers at work, Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-13-800.webp) ![Street-scene digital mural being installed behind the bar seating, Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-12-800.webp) ![Installer on a platform hanging the mural, Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-14-800.webp) All 4 more photographs from this project ![Installer hanging a black-and-white film-star mural, Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-06-800.webp) ![Mobile scaffold tower beside a tall window during mural installation at the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-03-800.webp) ![Timber-look wall panel next to the mural area at the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-07-800.webp) ![Wall prepared with lining panels before mural installation, the Everyman cinema, Liverpool.](https://www.mrwallcover.com/media/img/r/everyman-10-800.webp) How the commission ran ## The same standards, on every commission. Each commission has a written scope by room, walls prepared until they are true, protected floors, batch and shade control, set-out from the room’s focal points, and a return visit. [Read the method](https://www.mrwallcover.com/practice/#method). The six standards in full 01 ### Survey and scope, room by room We measure the wall that will actually be hung, allow for the repeat and the wastage, and write a scope of works room by room before anyone orders paper. 02 ### Preparation decides the finish Walls are filled, made good and primed until they are true. If a wall is not ready for the material specified, we say so before the last drop is ordered. 03 ### Protection and containment Floors, furniture and finished joinery are protected as part of the hang. Work is contained and the place is left tidy each evening. In a home we are visitors; in a hotel we work around the house. 04 ### Batch and shade control Deliveries are checked against the measure, and batches and shading are managed so that a corridor of rooms reads as one surface. 05 ### Set out from the room's focal points Pattern is set out from chimneypieces, doorcases and bed walls, so the pattern sits square to the cornice and the joinery. 06 ### One team, then the return visit The people who start are the people who finish. Four to six weeks after completion we come back to look at every seam and edge, and the workmanship is guaranteed for twelve months. [See the finish up close: seams, internal corners, edges and joins from our own installations](https://www.mrwallcover.com/details/) By [Dorin Burcus](https://www.mrwallcover.com/about/#dorin), founder · Last updated 22 October 2026